2005Year Built
3Stories
B1Building Class
R5Zoning
4,873 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Two family brick · 2,818 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.304/16/2026
ASHRAF CORP211/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC PERMIT SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BG CONSTRUCTION NY INCGeneral Contractor104/09/2026
SUPREME INSTALLATIONS CORGeneral Contractor104/09/2026
Building Lifecycle
All (15)Filed (5)Permit Issued (2)Signed Off (1)Violation (6)Special Inspection (1)
04/16/2026
Filed — Alteration
Filing for proposed concrete parking pad and exterior wall adjustment. Work as per plan. Filing for plan layout details in conjunction to Alteration CO adding a fourth floor to the existing 3 story building. Filing to comply with violation #39172770K.
B01330478-P1
03/17/2026
Special inspection requirement — Final
02/10/2026
Permit issued — Curb Cut
B01331831-I1-CC
01/07/2026
Violation issued (ECB, open)
Construction
01/07/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/29/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01314723-I1
12/24/2025
Filed — Alteration
B01331831-I1
12/24/2025
Filed — Alteration
Filing for proposed concrete parking pad and exterior wall adjustment. Work as per plan. Filing for plan layout details in conjunction to Alteration CO adding a fourth floor to the existing 3 story building. Filing to comply with violation #39172770K.
B01330478-I1
11/20/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01314723-P1
11/12/2025
Violation issued (ECB, closed)
Construction
11/07/2025
Permit issued — Supported Scaffold
B01314723-I1-SF
11/06/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01314723-I1
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/02/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedBG CONSTRUCTION NY INC02/10/2026
DOB NOWSupported ScaffoldSigned-offSUPREME INSTALLATIONS COR11/07/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/17/2026Final—progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01314723-I1Request digital key ↗
08/20/2026B01314723-P1Request digital key ↗
08/19/2026B01331831-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026B01314723-P1Open ↗
08/20/2026B01314723-I1Open ↗
08/19/2026B01331831-I1Open ↗