← Back
Public elementary, junior or senior high
I.S. 285 Meyer Levin
5917 BEVERLEY ROAD · BIN 3104599
💬 Discuss this project
1931Year Built
3Stories
W1Building Class
R4Zoning
79,847 sfGross Floor Area
1Units
LL97 Covered47 Open Violations 37 unresolved · 10 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 104,000 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 2 filings · 20 docs
Floor 33p · 2 filings · 20 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1208/28/2026
NEW YORK CITY PUBLIC SCHOOL104/21/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE 040203/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DEPT. OF EDUCATION IS 285203/22/2026
DOE I.S. 285403/22/2026
DEPARTMENT OF EDUCATION 0403/22/2026
DOE PS 285103/22/2026
DEPT OF EDUCATION I.S. 28103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WSP PARSONS BRINCKERHOFF408/20/2026
EME GROUP/SALAS O'BRIEN104/17/2026
SOLID ENGINEERING PC203/14/2026
WSP204/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE ELEC'L CONSTRUCTIONElectrical103/22/2026
ENSMAN ALEXANDERElectrical103/21/2026
EVEREST ELECTRIC CORPElectrical103/22/2026
FRANCIS RICHARDSElectrical103/21/2026
GIANNAKOPOULOS, JElectrical103/21/2026
JAMES MAGRIPLESElectrical103/21/2026
MAGRIPLES JAMESElectrical103/21/2026
RAGAVANIS, JOHNElectrical103/21/2026
ROOPCHAN, CHAITRAMElectrical103/21/2026
SANDOVAL, JAVIERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317508/20/2026
Building Lifecycle
All (116)Filed (9)Violation (60)Objection (17)Special Inspection (30)
08/31/2026
Objection resolved — Open
08/26/2026
Objection raised — Other
08/26/2026
Special inspection requirement — Final
08/20/2026
Filed — Alteration
IS 285K - RESO A - Rooms 352 & 354 on the 3rd floor into a new Science prep room & laboratory shown on Mechanical drawings, lighting details showing on EN drawing.
B00990034-P2
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/17/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE AUDITORIUM, CLASSROOMS AND OFFICE SPACES.
B01387593-I1
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Objection resolved — Addressed
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
04/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
Asma Hashmi
04/16/2026
Special inspection requirement — Maintenance information
Asma Hashmi
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
04/15/2026
Special inspection requirement — Mechanical Systems
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/15/2026
Special inspection requirement — Post-installed Anchors
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
04/15/2026
Special inspection requirement — Final
Asma Hashmi
04/02/2026
Violation issued (FDNY_ORDER, closed)
04/02/2026
Violation issued (FDNY_ORDER, closed)
03/31/2026
Objection resolved — Addressed
03/25/2026
Objection raised — Admin
03/25/2026
Objection raised — Other
03/14/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH JOB#B00990034. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01367356-I1
03/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW JOB #B00990034
B01367350-I1
01/22/2026
Violation issued (FDNY_ORDER, closed)
01/22/2026
Violation issued (FDNY_ORDER, closed)
03/21/2025
Violation issued (FDNY_ORDER, closed)
03/14/2025
Filed — Alteration
IS 285K - RESO A - Rooms 352 & 354 on the 3rd floor into a new Science prep room & laboratory shown on Mechanical drawings, lighting details showing on EN drawing.
B00990034-P1
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/09/2025
Violation issued (FDNY_ORDER, closed)
01/09/2025
Violation issued (FDNY_ORDER, closed)
11/14/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hakeem Alshawabkeh
10/21/2024
Objection resolved — Addressed
10/14/2024
Special inspection requirement — Lighting controls
Hakeem Alshawabkeh
10/01/2024
Special inspection requirement — Shutoff dampers
Hakeem Alshawabkeh
10/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Hakeem Alshawabkeh
10/01/2024
Special inspection requirement — Maintenance information
Hakeem Alshawabkeh
08/29/2024
Violation issued (ECB, open)
Elevators
08/29/2024
Violation issued (ECB, open)
Elevators
07/24/2024
Special inspection requirement — Energy Code Compliance Inspections
HAKEEM ALSHAWABKEH
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
HAKEEM ALSHAWABKEH
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Hakeem Alshawabkeh
07/23/2024
Special inspection requirement — Post-installed Anchors
Hakeem Alshawabkeh
07/23/2024
Special inspection requirement — Post-installed Anchors
HAKEEM ALSHAWABKEH
07/16/2024
Violation issued (FDNY_ORDER, closed)
06/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Hakeem Alshawabkeh
06/03/2024
Objection raised — Other
06/03/2024
Objection resolved — Addressed
05/28/2024
Filed — Alteration
IS 285K - RESO A - Rooms 352 & 354 on the 3rd floor into a new Science prep room & laboratory shown on Mechanical drawings, lighting details showing on EN drawing.
B00990034-S4
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDRED & BLUE CONSTRUCTION C06/13/2022
BISOTISSUEDRED & BLUE CONSTRUCTION C08/25/2021
BISOTISSUEDHEALTHY BREATHING ENVIRONMENTAL04/14/2016
BISOTISSUEDBG NATIONAL PLUMBING & H12/20/2013
BISPLISSUEDB.G NATIONAL P & H INC12/20/2013
BISOTISSUEDKG CONSTRUCTION SERVICES05/16/2013
BISPLISSUEDMAR-SAL PLBG & HTG, INC05/16/2013
BISOTISSUEDKG CONSTRUCTION SERVICES05/16/2013
BISEQISSUEDKG CONSTRUCTION SERVICES04/22/2013
BISOTISSUEDBG NATIONAL PLUMBING & H12/18/2012
BISBLISSUEDBG NATIONAL PLUMBING & H12/18/2012
BISPLISSUEDB.G NATIONAL P & H INC12/18/2012
BISOTISSUEDDETHOMAS & SON CONCRETE C08/17/2012
BISPLISSUEDFORSYTHE P&H CORP07/12/2012
BISOTISSUEDDETHOMAS & SON CONCRETE C07/12/2012
BISFBISSUEDB.G NATIONAL P & H INC04/16/2012
BISOTISSUEDBG NATIONAL PLUMBING & H04/06/2012
BISBLISSUEDBG NATIONAL PLUMBING & H04/06/2012
BISEQISSUEDBG NATIONAL PLUMBING & H01/12/2012
BISPLISSUEDB.G NATIONAL P & H INC12/19/2011
BISOTISSUEDBG NATIONAL PLUMBING & H12/13/2011
BISOTISSUEDBG NATIONAL PLUMBING & H10/27/2011
BISFSISSUEDPETER AGLIARDO CONTRACTOR10/18/2011
BISEQISSUEDBG NATIONAL PLUMBING & H05/16/2011
BISOTISSUEDFALCON ELEC'L CONTRG CORP03/29/2011
BISMHISSUEDBG NATIONAL PLUMBING & H03/11/2011
BISOTISSUEDBG NATIONAL PLUMBING & H03/11/2011
BISPLISSUEDB.G NATIONAL P & H INC03/11/2011
BISEQISSUEDBG NATIONAL PLUMBING & H01/05/2011
BISMHISSUEDMIDTOWN HVAC ENTERPRISES11/16/2010
BISFSISSUEDPETER AGLIARDO CONTRACTOR11/04/2010
BISEQISSUEDBG NATIONAL PLUMBING & H09/09/2010
BISPLISSUEDFORSYTHE P&H CORP04/06/2006
BISPLISSUEDFRANCO BELLI PLUMBING & HTG03/28/2006
BISFPISSUEDFIREMASTERS03/20/2006
BISMHISSUEDJ & A CONTRACTORS CORP10/25/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/31/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/14/2005
BISOTISSUEDXYAMICA AIR CONDITIONING AND10/15/2004
BISEQISSUEDROCKLEDGE SCAFFOLD CORP10/15/2004
+ 10 more permits on file
2 projects · most recent 08/20/2026
Others Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026——Others, Ventilation Systems
Ventilation
Nu-Air ECM1000ERV 825 CFM · Erv ×1
ECM1000HRV 775 CFM · Erv ×1
Other
Daikin B22OU 825 CFM · Erv ×1
NU0820 775 CFM ×1
04/17/2026——Air Conditioning Systems
Cooling
Lg ZRUM336BTE6 35,000 BTU · Vrf Outdoor ×9
ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×4
ZRNU123TAAA 12,300 BTU · Vrf Indoor ×1
ZRNU183SKSA 19,100 BTU · Vrf Indoor ×1
ZRNU183TAAA 19,100 BTU · Vrf Indoor ×1
ZRNU243SKSA 24,200 BTU · Vrf Outdoor ×1
ZRUN336BTE6 320,000 BTU · Vrf Outdoor ×1
1 project · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026——Sprinkler System
1 project · most recent 08/20/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
08/20/2026——Gas, Plumbing-Sprinkler, Water/Sanitary
23 projects · most recent 08/06/2026
General Wiring Lighting
FiledStatusContractorScope
08/06/2026Permit IssuedINLIGHT ELECTRICAL CORPGeneral Wiring
06/23/2026Permit IssuedSTANCO SYSTEM ELEC'L CONT—
03/22/2026CompleteEVEREST ELECTRIC CORP—
11/18/2025Permit IssuedABSOLUTE ELEC'L CONTRG OFLighting
07/30/2025CompleteEVEREST ELECTRIC CORP—
06/24/2025CompleteEVEREST ELECTRIC CORP—
04/23/2025CompleteEVEREST ELECTRIC CORP—
11/15/2024CompleteACE ELEC'L CONSTRUCTIONGeneral Wiring
05/21/2024Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
05/16/2024CompleteA & S ELECTRIC INC.—
06/14/2023Permit IssuedA & S ELECTRIC INC.General Wiring
09/06/2022CompleteABM ELECTRIC, INCGeneral Wiring
07/13/2022CompleteCHARAN ELEC'L ENTERP'S IN—
02/23/2022CompleteABM ELECTRIC, INCGeneral Wiring
08/24/2021CompleteHEXAGON CONST & ELECL GRPGeneral Wiring
2 projects · most recent 03/14/2026
Fence Sidewalk Shed
FiledStatusContractorScope
03/14/2026——Fence
03/14/2026——Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/26/2026Final—progress
07/21/2026Fire-Resistance Rated Construction—progress
07/08/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
04/16/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
04/16/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
04/16/2026Duct leakage testing, insulation and designAsma Hashmienergy_progress
04/16/2026Maintenance informationAsma Hashmienergy_progress
04/16/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
04/15/2026Mechanical Systems—special
04/15/2026Fire-Resistant Penetrations and Joints—special
04/15/2026Post-installed Anchors—special
04/15/2026Energy Code Compliance InspectionsAsma Hashmiprogress
04/15/2026FinalAsma Hashmiprogress
03/11/2025Fire-Resistant Penetrations and Joints—special
10/30/2024Fire-Resistant Penetrations and JointsHakeem Alshawabkehspecial
10/14/2024Lighting controlsHakeem Alshawabkehenergy_progress
10/01/2024Shutoff dampersHakeem Alshawabkehenergy_progress
10/01/2024HVAC-R and service water piping design and insulationHakeem Alshawabkehenergy_progress
10/01/2024Maintenance informationHakeem Alshawabkehenergy_progress
07/24/2024Energy Code Compliance InspectionsHAKEEM ALSHAWABKEHprogress
07/24/2024Fire-Resistant Penetrations and JointsHAKEEM ALSHAWABKEHspecial
07/23/2024Energy Code Compliance InspectionsHakeem Alshawabkehprogress
07/23/2024Post-installed AnchorsHakeem Alshawabkehspecial
07/23/2024Post-installed AnchorsHAKEEM ALSHAWABKEHspecial
06/27/2024Energy Code Compliance InspectionsHakeem Alshawabkehprogress
Latest 25 of 34.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026B00990034-S1Request digital key ↗
08/25/2026B00990034-S3Request digital key ↗
08/25/2026B00990034-S4Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026B00990034-I1Open ↗
08/25/2026B00990034-S7Open ↗
08/22/2026B00990034-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00990034-S4Open ↗
08/28/2026B00990034-P2Open ↗
08/27/2026B00990034-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00990034-S4Open ↗
08/27/2026B00990034-S1Open ↗
08/25/2026B00990034-S3Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/25/2026B00990034-I1Open ↗
08/25/2026B00990034-S7Open ↗
08/22/2026B00990034-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/25/2026B00990034-I1Open ↗
08/22/2026B00990034-P2Open ↗
08/13/2026B00990034-S3Open ↗
Showing 3 of 8 on file for this type
▸Other Documents10
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal10
08/25/2026B00990034-I1Open ↗
08/22/2026B00990034-P2Open ↗
08/13/2026B00990034-S5Open ↗
Showing 3 of 10 on file for this type