← Back
BuildNYC
Walk-up apt, over six families with stores
592 3RD AVENUE
MANHATTAN · BIN 1019146
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
C1-9Zoning
9,590 sfGross Floor Area
19Units
Rent Stabilized3 Active Violations 1 unresolved · 2 paperwork only ▸
Walk-up apt, over six families with stores · 2,525 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRestaurant interior renovation, new hood, exhaust, and HVAC12p · 1 filing · 13 docs
Floor 5Jerrick Associates, INC.4p · 1 filing · 2 docs
Floor 4Jerrick Associates, INC.4p · 1 filing · 2 docs
Floor 3Jerrick Associates, INC.4p · 1 filing · 2 docs
Floor 2Jerrick Associates, INC.4p · 1 filing · 2 docs
Floor 1Solil Management, LLCUnder Construction28p · 4 filings · 20 docs
Site & exteriorJerrick Associates, INC.6p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jerrick Associates807/08/2026
85 East 158th Street203/21/2026
Piselli Inc Dba Pasta Via103/22/2026
Lighthouse Properties103/21/2026
Darrington Realty103/21/2026
592-594 Third Avenue103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pba Engineering107/16/2025
Serdar Ceylan Architect403/04/2025
Paul Perdek, Prof. Engineering206/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Valntino ConstructionGeneral Contractor603/21/2026
Jerrick AssociatesScaffold307/08/2026
Lne ElectricalElectrical103/22/2026
All City RemodelingGeneral Contractor104/09/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Abr Plumbing & Heating ContractingPlumbing106/27/2026
A Plus PlumbingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Leo Y Lee Associates2481107/16/2025
Scalar Architecture4696107/16/2025
Ceylan Design and Consulting8422403/04/2025
Welldone Inspection8628209/27/2024
Building Lifecycle
All (98)Filed (7)Permit Issued (7)Signed Off (3)Violation (41)Inspection (2)Objection (10)Special Inspection (28)
09/11/2026
Signed off — Alteration
APPLICATION FILED FOR ADD NEW GAS EQUIPMENT IN A EXIST. RESTAURANT. PLUMBING WORK IS FILED IN CONJUNCTION WITH #M01106366
M01106369-I1
04/10/2026
Permit issued — Plumbing
M01106369-I1-PL
11/03/2025
Permit issued — Structural
M01251802-I1-ST
10/14/2025
Violation issued (ECB, closed)
Construction
10/14/2025
Violation issued (ECB, closed)
Construction
09/04/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/01/2025
Objection raised — Admin
08/01/2025
Objection raised — Inspections
08/01/2025
Objection raised — Structural
07/16/2025
Filed — Alteration
FLOOR JOINST REPIR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01251802-I1
07/07/2025
Special inspection requirement — Structural Steel - Welding
Leo Lee
07/07/2025
Special inspection requirement — Structural Steel - Details
Leo Lee
07/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
JULIO SALCEDO-FERNANDEZ
07/07/2025
Special inspection requirement — Final
Paul Beck
06/04/2025
Violation issued (HPD, closed)
A
06/03/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, open)
Construction
04/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
03/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
03/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Final
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
03/24/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
03/19/2025
Objection resolved — Addressed
03/19/2025
Objection resolved — Addressed
03/07/2025
Objection raised — Zoning
03/07/2025
Objection raised — Scope
03/04/2025
Filed — Alteration
APPLICATION FILED FOR ADD NEW GAS EQUIPMENT IN A EXIST. RESTAURANT. PLUMBING WORK IS FILED IN CONJUNCTION WITH #M01106366
M01106369-P1
03/04/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF A EXISTING RESTAURANT AND TO INSTALL NEW HOOD AN EXHAUST SYSTEM AND HVAC SYSTEM ON AN EXISTING MIXED USE BUILDINGS AS PER PLANS SUBMITTED.
M01106366-P1
02/03/2025
Permit issued — Plumbing
M01106369-I1-PL
01/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
01/27/2025
Special inspection requirement — Mechanical Systems
SERDAR CEYLAN
01/27/2025
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
01/27/2025
Special inspection requirement — Final
SERDAR CEYLAN
01/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
SERDAR CEYLAN
01/27/2025
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
01/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
01/27/2025
Special inspection requirement — Lighting controls
SERDAR CEYLAN
01/27/2025
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
12/16/2024
Permit issued — Mechanical Systems
M01106366-I1-GC
12/13/2024
Permit issued — General Construction
M01106366-I1-MS
09/27/2024
Filed — Alteration
APPLICATION FILED FOR ADD NEW GAS EQUIPMENT IN A EXIST. RESTAURANT. PLUMBING WORK IS FILED IN CONJUNCTION WITH #M01106366
M01106369-I1
09/25/2024
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF A EXISTING RESTAURANT AND TO INSTALL NEW HOOD AN EXHAUST SYSTEM AND HVAC SYSTEM ON AN EXISTING MIXED USE BUILDINGS AS PER PLANS SUBMITTED.
M01106366-I1
03/11/2024
Signed off — Alteration
M00877332-I1
03/11/2024
Signed off — Alteration
M00877333-I1
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAbr Plumbing & Heating Contracting04/10/2026
DOB NOWStructuralPermit IssuedAll City Remodeling11/03/2025
DOB NOWPlumbingSigned-offA Plus Plumbing02/03/2025
DOB NOWMechanical SystemsPermit IssuedValntino Construction12/16/2024
DOB NOWGeneral ConstructionPermit IssuedValntino Construction12/13/2024
DOB NOWSidewalk ShedSigned-offGE 2A Construction06/05/2023
DOB NOWSupported ScaffoldSigned-offGE 2A Construction06/05/2023
BISFPISSUEDFire Zone Vent & Supp01/06/2014
BISOTISSUEDFab-Tec Construction and08/11/2009
BISEQISSUEDFab-Tec Construction and08/11/2009
BISOTISSUEDA International09/29/2006
BISFPISSUEDSentinel Fire Control10/06/2005
BISBLISSUEDTurnabout Plumbing & Heating07/23/2001
BISFPISSUEDSentinel Fire Control04/14/1992
BISMHISSUEDDependable Paint'g & Restorat'n02/06/1991
BISPLISSUEDAtlas PLG06/18/1990
BISFPISSUEDIdeal Fire Control06/05/1990
BISOTISSUEDDependable Painting & Restoration05/25/1990
1 project · most recent 03/04/2025
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
03/04/2025Permit IssuedValntino ConstructionAir Conditioning Systems, Others
Cooling
Lg LMU601HV 60,000 BTU · Condensing Unit ×10
Other
N/A N/A 4,000 CFM · Kitchen Exhaust ×5
1 project · most recent 03/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/04/2025Signed-offAbr Plumbing & Heating ContractingGas, Water/Sanitary
2 projects · most recent 08/17/2025
General Wiring Lighting
FiledStatusContractorScope
08/17/2025Permit IssuedLne ElectricalGeneral Wiring, Lighting
06/01/2023CompleteBorowide Elect'l Contractors—
1 project · most recent 07/16/2025
FiledStatusContractorScope
07/16/2025Permit IssuedAll City Remodeling1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/07/2025Structural Steel - WeldingLeo Leespecial
07/07/2025Structural Steel - DetailsLeo Leespecial
07/07/2025Tenant Protection Plan ComplianceJULIO SALCEDO-FERNANDEZspecial
07/07/2025FinalPaul Beckprogress
03/31/2025Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
03/31/2025Tenant Protection Plan ComplianceQIUFAN JIANGspecial
03/31/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
03/31/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
03/24/2025HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
03/24/2025Lighting controlsSERDAR CEYLANenergy_progress
03/24/2025Mechanical SystemsSERDAR CEYLANspecial
03/24/2025Tenant Protection Plan ComplianceQIUFAN JIANGspecial
03/24/2025Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
03/24/2025Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
03/24/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
03/24/2025FinalSERDAR CEYLANprogress
03/24/2025Insulation placement and R valuesSERDAR CEYLANenergy_progress
03/24/2025Interior lighting powerSERDAR CEYLANenergy_progress
01/27/2025Tenant Protection Plan Compliance—special
01/27/2025Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
01/27/2025Mechanical SystemsSERDAR CEYLANspecial
01/27/2025Energy Code Compliance InspectionsSERDAR CEYLANprogress
01/27/2025FinalSERDAR CEYLANprogress
01/27/2025Fire-Resistance Rated ConstructionSERDAR CEYLANprogress
01/27/2025Interior lighting powerSERDAR CEYLANenergy_progress
Latest 25 of 28.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026M00877333-I1Request digital key ↗
08/31/2026M00877332-I1Request digital key ↗
08/26/2026M01106369-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
10/21/2013121816017Open ↗
07/06/2009120083587Open ↗
▸BISWORK PERMIT APPLICATION2
01/08/2014121816017Open ↗
08/11/2009120083587Open ↗
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026M01106366-P1Open ↗
08/25/2026M01106366-I1Open ↗
08/25/2026M01106366-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026M00877332-I1Open ↗
08/26/2026M01106369-P1Open ↗
08/26/2026M01106369-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026M01106366-P1Open ↗
08/31/2026M01106366-P1Open ↗
08/25/2026M01106366-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/21/2013121816017Open ↗
07/06/2009120083587Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/06/2009120083587Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/06/2009120083587Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/21/2013121816017Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
07/06/2009120083587Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026M01106369-I1Open ↗
08/26/2026M01106369-P1Open ↗
08/24/2026M01106366-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/30/2013121816017Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/06/2009120083587Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
07/06/2009120083587Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
10/21/2013121816017Open ↗
07/06/2009120083587Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
08/12/2009120083587Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/21/2013121816017Open ↗
07/06/2009120083587Open ↗