ECB06/26/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER DOB-FTC #051526PI31610SB AND CONTROL #370494 DATED 05/15/2026. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDER.$2K due
DOB05/15/2026FTC W/COMMISSIONER'S ORDER. CONTROL#34812,VIO#033026PI31601SB DATED 03/30/26 REQUIRING OWNER TO SUBMIT CORRECTIVE ACTION PLAN BY 04/30/26 AS OF 05/15/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348125 AND VIO#033026PI31601SB
DOB03/30/2026CORRECTIVE ACTION PLAN REQ'D-OBSVD DETERIORATED MORTAR JOINTS @PARAPET & VERT BRICK MASONRY CRACK NEAR EXP1/2 CORNER @ EXP1.@EXP2 OBSVD SEVERLY BULGING/CRACKED STUCCO. OWNER TO IMMED RETAIN REG DESING PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 04/30/2026
ECB03/30/2026FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. PROPERTY IS AZ AND C DETACHED MULTIPLE DWELLING LOCATED ON AN INTERIOR LOT. OBSERVED AT EXPOSURE 1, DETERIORATED MORTAR JOINTS AT PARAPET LOT. OBSERVED A$625 due
Four families · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.