DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB01/23/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/22/2018CEASE USE. 51,36 51)WEIL MCLEAN BOILERS (SEAL REMAINS FROM CEASE USE OF PREVIOUS VIOLATION #32096600L FLUE PIPE SEPERATED AT HOT WATER HEATERS FOR (REGTAUIANT) BOILERS NOT REGISTERED FROM PREVIOUS VIOLATI$1K due
DOB07/25/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/25/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/25/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/25/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/25/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/25/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB05/01/201850A,50B,51,36. WEIL MCLAIN CILP HOT WATER HTE BOILER MOD CGH70; 50A-HEAVY ASH AND PARTICULATE ACCUMULATION IN CHIMNEY BASE CLEANOUT CAVITY.50B-SOLID FRAGMENTS FROM INTERNAL CHIMNEY LINER VISIBLE. FLUE GAS EMIS$1K due
ECB05/01/201850A,50B,51. AO SMITH GAS FIRED STORAGE WTR HTR 75GLN CAP; 50A-H EAVY ASH AND PARTICULATE ACCUMULATION IN CHIMNEY BASE CLEANOUT CAVITY.50B-SOLID FRAGMENTS FROM INTERNAL CHIMNEY LINER VISIBLE. FLUE GAS EMIS$1K due
ECB05/01/201850A,50B,51,36. WEIL MCLAIN CILP HOT WATER HTE BOILER MOD CGH70; 50A-HEAVY ASH AND PARTICULATE ACCUMULATION IN CHIMNEY BASE CLEANOUT CAVITY.50B-SOLID FRAGMENTS FROM INTERNAL CHIMNEY LINER VISIBLE. FLUE GAS EMIS$2K due
ECB05/01/201850A,50B,51. AO SMITH GAS FIRED STORAGE WTR HTR 40GLN CAP; 50A-HEAVY ASH AND PARTICULATE ACCUMULATION IN CHIMNEY BASE CLEANOUT CAVITY. 50B-SOLID FRAGMENTS FROM INTERNAL CHIMNEY LINER VISIBLE. FLUE GAS EMIS$1K due
ECB05/01/201850A,50B,51. AO SMITH, GAS FIRLED STORAGE WTR HTR 40GLN CAP; 50A-H EAVY ASH AND PARTICULATE ACCUMULATION IN CHIMNEY BASE CLEANOUT CAVITY.50B-SOLID FRAGMENTS FROM INTERNAL CHIMNEY LINER VISIBLE. FLUE GAS EMIS$1K due
ECB05/01/201850A,50B,51. AO SMITH GAS-FIRED STORAGE WATER HTR, 40SW CAPACITY. 50A HEAVY ASH &PARTICULATE ACCUMULATION IN CHIMNEY BASE CLEAN OUT CAVITY. 50B-SOLID FRAGMENTS FROM INTERNAL CHIMNEY LINER VISIBLE. FLUE GAS EMIS$1K due
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB04/01/1992V-DOB VIOLATION - ACTIVE
ECB04/17/1996FAILURE TO PROVIDE AT LEAST TWO MEANS OF EGRESS FROM ROOM OR SPACE WHERE REQUIRED NO SECOND MEANS OF EGRESS AT 2ND & 3RD FLOORS PREMISES OCCUPIED AS A (3) THREE FAMILY. REMEDY: PROVIDE REQUIRED MEANS OF EGRESS.Nothing owed — awaiting certificate of correction