LL97 CoveredRent Stabilized5 Active Violations 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: Frontier Restaurant · 4,950 sf lot · 14.79 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDISH WIRELESS antenna installation on roof1p · 1 filing · 3 docs
Floor 1Cb Developers2p · 1 filing · 4 docs
CellarCb Developers3p · 2 filings · 7 docs
Site & exteriorTD Bank3p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CB Frontier7303/21/2026
CB Developers1003/21/2026
WVA907/08/2026
TD Bank303/21/2026
CM and Associates Construction203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gea Consulting Engineers112/05/2024
KMB Design Group104/19/2023
Shaaban Engineering406/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec203/21/2026
Construction Permit Services103/21/2026
National Sign and Lighting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
National MaintenanceSign hanger407/08/2026
Livoti EnterpriseGeneral Contractor303/21/2026
Fordham Refri & Air-CondGeneral Contractor203/21/2026
G.N.T. MechanicalPlumbing203/22/2026
Infinity Electrical Contractors IElectrical103/21/2026
Martinez Electrical ContElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gea Consulting Engineers945112/05/2024
KMB Design Group513104/19/2023
Building Lifecycle
All (79)Filed (6)Permit Issued (6)Signed Off (6)Facade (FISP) (3)Violation (49)Objection (4)Special Inspection (5)
02/24/2025
Signed off — Alteration
FILING HEREWITH MECHANICAL WORK AS SHOWN ON DRAWINGS FOR THE CELLAR AND FIRST FLOOR NO CHANGE IN USE EGRESS OR OCCUPANCY
M01150358-I1
12/27/2024
Permit issued — Mechanical Systems
M01150358-I1-MS
12/05/2024
Filed — Alteration
FILING HEREWITH MECHANICAL WORK AS SHOWN ON DRAWINGS FOR THE CELLAR AND FIRST FLOOR NO CHANGE IN USE EGRESS OR OCCUPANCY
M01150358-I1
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Glickman
12/03/2024
Special inspection requirement — Mechanical Systems
David Glickman
12/03/2024
Special inspection requirement — Final
David Glickman
04/24/2024
Signed off — Alteration
DISH WIRELESS- Installation of 3 new antenna sectors with 6 RRH units and 1 GPS unit on roof.. Install 1 new equipment cabinet on steel platform on roof. Related service connection in cellar. All in conformance with TPPN 5/98.
M00855483-I1
05/15/2023
Permit issued — Antenna
M00855483-I1-AN
04/21/2023
Objection raised — Scope
04/21/2023
Objection resolved — Addressed
04/21/2023
Objection raised — Zoning
04/21/2023
Objection resolved — Addressed
04/19/2023
Filed — Alteration
DISH WIRELESS- Installation of 3 new antenna sectors with 6 RRH units and 1 GPS unit on roof.. Install 1 new equipment cabinet on steel platform on roof. Related service connection in cellar. All in conformance with TPPN 5/98.
M00855483-I1
11/14/2022
Signed off — Alteration
M00493926-I1
11/14/2022
Signed off — Alteration
INSTALLNON-ILLUMINATED WALL SIGN NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00493904-I1
11/14/2022
Signed off — Alteration
M00493914-I1
07/29/2022
Cycle 9 facade report submitted
07/29/2022
Cycle 9 facade report signed — SWARMP
07/27/2022
Cycle 9 facade inspection completed
05/11/2022
Signed off — Alteration
INSTALL NON-ILLUMINATED WALL SIGN NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00498122-I1
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/17/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/11/2021
Permit issued — Sign
M00493914-I1-SG
06/07/2021
Permit issued — Sign
M00498122-I1-SG
06/03/2021
Filed — Alteration
M00493926-I1
06/03/2021
Filed — Alteration
INSTALLNON-ILLUMINATED WALL SIGN NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00493904-I1
06/03/2021
Filed — Alteration
M00493914-I1
06/03/2021
Filed — Alteration
INSTALL NON-ILLUMINATED WALL SIGN NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00498122-I1
06/03/2021
Permit issued — Sign
M00493904-I1-SG
06/03/2021
Permit issued — Sign
M00493926-I1-SG
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2021
Special inspection requirement — Final
AHMED SHAABAN
03/26/2021
Special inspection requirement — Final
AHMED SHAABAN
04/26/2018
Violation issued (ECB, closed)
Elevators
06/10/2015
Violation issued (ECB, closed)
Construction
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2015
Violation issued (ECB, closed)
Unknown
03/31/2015
Violation issued (ECB, closed)
Construction
03/09/2015
Violation issued (ECB, closed)
Unknown
03/09/2015
Violation issued (ECB, closed)
Unknown
03/09/2015
Violation issued (ECB, closed)
Unknown
11/12/2014
Violation issued (ECB, closed)
Unknown
11/12/2014
Violation issued (ECB, closed)
Construction
11/12/2014
Violation issued (ECB, closed)
Unknown
11/12/2014
Violation issued (ECB, closed)
Construction
11/12/2014
Violation issued (ECB, closed)
Construction
02/11/2014
Violation issued (ECB, closed)
Unknown
02/11/2014
Violation issued (ECB, closed)
Unknown
02/11/2014
Violation issued (ECB, closed)
Unknown
02/11/2014
Violation issued (ECB, closed)
Unknown
02/11/2014
Violation issued (ECB, closed)
Unknown
02/11/2014
Violation issued (ECB, closed)
Construction
01/22/2014
Violation issued (ECB, closed)
Unknown
01/22/2014
Violation issued (ECB, closed)
Unknown
01/22/2014
Violation issued (ECB, closed)
Construction
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFordham Refri & Air-Cond12/27/2024
DOB NOWAntennaSigned-offLivoti Enterprise05/15/2023
DOB NOWSignSigned-offNational Maintenance06/11/2021
DOB NOWSignSigned-offNational Maintenance06/07/2021
DOB NOWSignSigned-offNational Maintenance06/03/2021
DOB NOWSignSigned-offNational Maintenance06/03/2021
BISOTISSUEDBen's Home Improvement03/22/2018
BISSPISSUEDNYC Fire Sprinkler03/07/2018
BISPLISSUEDAmeriflo Plumbing and Heating01/24/2018
BISMHISSUEDBen's Home Improvement12/27/2017
BISPLISSUEDTristate Plumbing Services10/23/2017
BISEQISSUEDIcs Builders09/26/2017
BISOTISSUEDIcs Builders08/15/2017
BISMHISSUEDIcs Builders08/15/2017
BIS—ISSUEDNational Maintenance04/11/2017
BIS—ISSUEDNeptune Signs & Awnings03/30/2017
BISPLISSUEDG.N.T. Mechanical01/11/2017
BISPLISSUEDG.N.T. Mechanical12/03/2015
BISSDISSUEDG.N.T. Mechanical12/02/2015
BISSDISSUEDG.N.T. Mechanical11/04/2015
BISEQISSUEDRockledge Scaffold07/29/2015
BISPLISSUEDPipe Rite07/15/2015
BISSPISSUEDPrestige Plumbing & Heating07/15/2015
BISMHISSUEDDV Contracting07/14/2015
BISOTISSUEDDV Contracting07/14/2015
BIS—ISSUEDUltimate Signs & Designs Co07/13/2015
BIS—ISSUEDUltimate Signs & Designs Co07/13/2015
BIS—ISSUEDUltimate Signs & Designs Co07/13/2015
BIS—ISSUEDUltimate Signs & Designs Co07/13/2015
BISEQISSUEDCM and Associates Construction07/09/2015
BISSPISSUEDSirina Fire Protection06/09/2015
BISPLISSUEDPar Plumbing Co06/02/2015
BISEQISSUEDJ. Petrocelli Contracting04/16/2015
BISMHISSUEDJ. Petrocelli Contracting04/16/2015
BISOTISSUEDJ. Petrocelli Contracting04/16/2015
BISBLISSUEDG.N.T. Mechanical02/20/2015
BIS—ISSUEDCM and Associates Construction12/24/2014
BISPLISSUEDG.N.T. Mechanical12/01/2014
BISEQISSUEDRockledge Scaffold11/19/2014
BISEQISSUEDCM and Associates Construction11/18/2014
+ 16 more permits on file
4 projects · most recent 04/27/2025
General Wiring
FiledStatusContractorScope
04/27/2025Permit IssuedMidland Electrical CoGeneral Wiring
09/06/2024CompleteInfinity Electrical Contractors I—
04/25/2024CompleteMartinez Electrical ContGeneral Wiring
01/06/2018CompleteAmra ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/05/2024Fire-Resistant Penetrations and JointsDavid Glickmanspecial
12/03/2024Mechanical SystemsDavid Glickmanspecial
12/03/2024FinalDavid Glickmanprogress
04/05/2021FinalAHMED SHAABANprogress
03/26/2021FinalAHMED SHAABANprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
TD BankBank / Financial branchFloor 19
Project M00493914 Alteration · LOC Issued · 06/03/2021
Project M00493926 Alteration · LOC Issued · 06/03/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 613 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00498122-I1Request digital key ↗
09/03/2026M00493926-I1Request digital key ↗
09/03/2026M00493904-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits141
▸BISPLAN / WORK APPROVAL APPLICATION83
09/11/2019123255896Open ↗
07/17/2019123363387Open ↗
07/09/2019123363387Open ↗
Showing 3 of 83 on file for this type
▸BISWORK PERMIT APPLICATION51
03/08/2018123363387Open ↗
01/25/2018123255896Open ↗
12/28/2017123255896Open ↗
Showing 3 of 51 on file for this type
▸BISPLACE OF ASSEMBLY4
08/02/2016120844514Open ↗
07/21/2016120844514Open ↗
06/16/2016120844514Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/02/2016120844514Open ↗
▸Seals & Professional Certifications154
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION96
02/03/2020122874167Open ↗
02/03/2020122874167Open ↗
02/03/2020122874167Open ↗
Showing 3 of 96 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
02/20/2018123363387Open ↗
04/10/2017123059368Open ↗
04/06/2017122874176Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
09/22/2017140698190Open ↗
04/10/2017123059368Open ↗
04/10/2017123059368Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00493926-I1Open ↗
09/03/2026M00493914-I1Open ↗
08/13/2026M00493904-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/22/2017140698190Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/22/2017140698190Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
10/04/2026M01150358-I1Open ↗
09/01/2026M00498122-I1Open ↗
08/23/2026M00493904-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
10/04/2026M01150358-I1Open ↗
▸Trade Schedules & Equipment44
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
12/30/2019123027553Open ↗
12/24/2019123191081Open ↗
07/30/2018122362978Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
02/20/2018123363387Open ↗
11/13/2017123255896Open ↗
07/19/2017123027562Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
01/06/2020123191081Open ↗
01/06/2020123027553Open ↗
▸BISEQUIPMENT USE PERMITS1
06/14/2016121675204Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/14/2016121675204Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
11/13/2017123255896Open ↗
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1: Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos10
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00855483-I1Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
01/13/2020123255896Open ↗
12/06/2019122874167Open ↗
02/20/2018123363387Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
02/03/2020122874167Open ↗
01/13/2020123255896Open ↗
06/14/2016121675204Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs69
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST39
02/03/2020122874167Open ↗
01/13/2020123255896Open ↗
01/06/2020123191081Open ↗
Showing 3 of 39 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
12/06/2019122874167Open ↗
08/02/2016120844514Open ↗
08/02/2016120844514Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT52
02/03/2020122874167Open ↗
02/03/2020122874167Open ↗
02/03/2020122874167Open ↗
Showing 3 of 52 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms77
▸BISEFILING COVER SHEET32
02/20/2018123363387Open ↗
01/23/2018123191081Open ↗
11/13/2017123255896Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM25
02/03/2020122874167Open ↗
01/13/2020123255896Open ↗
01/06/2020123191081Open ↗
Showing 3 of 25 on file for this type
▸BISADDITIONAL INFORMATION15
10/08/2019123255896Open ↗
Showing 1 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/22/2017140698190Open ↗
Showing 1 of 5 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWDHCR Document4
08/13/2026M00498122-I1Open ↗
08/13/2026M00493914-I1Open ↗
08/13/2026M00493904-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type