← Back
Two family converted from one family
595 MAC DONOUGH STREET
BROOKLYN · BIN 3040125
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R5BZoning
2,268 sfGross Floor Area
2Units
Two family converted from one family · 1,800 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/06/2022$1.8M—— → —$794/sf building
12/08/2016$850K—Private party → Private party$375/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GAUGE STUDIO407/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK & HAMMER CONSTRUCTIOGeneral Contractor204/09/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILT ENGINEERS, P.C.8962207/20/2026
Building Lifecycle
All (15)Filed (4)Permit Issued (3)Signed Off (3)Inspection (1)Special Inspection (4)
08/07/2026
Signed off — Alteration
Add new powder room, primary bath suite, and office space. Replacing existing guest bathroom fixtures and relocating existing W/D connection.
B01343215-S1
08/07/2026
Signed off — Alteration
Add new powder room, primary bath suite, and office space. Replacing existing guest bathroom fixtures and relocating existing W/D connection.
B01343215-I1
08/07/2026
Signed off — Alteration
New primary bathroom with new vanity, toilet, and tub/shower. Replacement of all fixtures in existing guest bathroom. Relocate washer/dryer connection. New powder room with toilet and vanity on first floor.
B01343645-I1
07/22/2026
Special inspection requirement — Mechanical Systems
David Brinkman
07/22/2026
Special inspection requirement — Final
Maxwell Chien
07/20/2026
Filed — Alteration
Add new powder room, primary bath suite, and office space. Replacing existing guest bathroom fixtures and relocating existing W/D connection.
B01343215-P1
07/20/2026
Special inspection requirement — Mechanical Systems
David Brinkman
07/20/2026
Special inspection requirement — Final
Maxwell Chien
04/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Permit issued — Mechanical Systems
B01343215-S1-MS
02/17/2026
Filed — Alteration
Add new powder room, primary bath suite, and office space. Replacing existing guest bathroom fixtures and relocating existing W/D connection.
B01343215-S1
02/05/2026
Permit issued — Plumbing
B01343645-I1-PL
01/29/2026
Permit issued — General Construction
B01343215-I1-GC
01/13/2026
Filed — Alteration
Add new powder room, primary bath suite, and office space. Replacing existing guest bathroom fixtures and relocating existing W/D connection.
B01343215-I1
01/13/2026
Filed — Alteration
New primary bathroom with new vanity, toilet, and tub/shower. Replacement of all fixtures in existing guest bathroom. Relocate washer/dryer connection. New powder room with toilet and vanity on first floor.
B01343645-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offROCK & HAMMER CONSTRUCTIO02/26/2026
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC02/05/2026
DOB NOWGeneral ConstructionSigned-offROCK & HAMMER CONSTRUCTIO01/29/2026
BIS—ISSUEDEMERALD CONSTRUCTION CONS10/20/2017
BIS—ISSUEDEMERALD CONSTRUCTION CONS09/22/2017
BISPLISSUEDR.J.C. MECHANICAL CORP07/06/2017
BIS—ISSUEDEMERALD CONSTRUCTION CONS06/13/2017
1 project · most recent 07/20/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Signed-offROCK & HAMMER CONSTRUCTIOOthers
Other
Mitsubishi Electric MITSUBISHI / MUZ-GX18NLHZ 18,000 BTU · Heat Pump Outdoor ×2
MITSUBISHI / MXZ-SM48NLHZ 48,000 BTU · Heat Pump Outdoor ×2
MITSUBISHI SUZ-AK24NLHZ 24,000 BTU ×2
1 project · most recent 01/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/13/2026Signed-offAMC PLBG, HTG & CLNG, INCGas, Water/Sanitary
1 project · most recent 02/02/2026
General Wiring
FiledStatusContractorScope
02/02/2026Permit IssuedRIVIERA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/22/2026Mechanical SystemsDavid Brinkmanspecial
07/22/2026FinalMaxwell Chienprogress
07/20/2026Mechanical SystemsDavid Brinkmanspecial
07/20/2026FinalMaxwell Chienprogress
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01343645-I1Request digital key ↗
08/18/2026B01343215-I1Request digital key ↗
08/18/2026B01343215-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits15
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
01/12/2018321552066Open ↗
12/15/2017321552066Open ↗
12/05/2017321552066Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
05/19/2017321552066Open ↗
05/15/2017321552066Open ↗
05/02/2017321552066Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
10/23/2017321552066Open ↗
09/25/2017321552066Open ↗
07/17/2017321552066Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/28/2017321552066Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/02/2017321552066Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/30/2018321552066Open ↗
04/24/2018321552066Open ↗
04/11/2018321552066Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01343645-I1Open ↗
08/18/2026B01343215-P1Open ↗
08/18/2026B01343215-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01343215-P1Open ↗
08/22/2026B01343215-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B01343215-P1Open ↗
08/22/2026B01343215-S1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/23/2018321552066Open ↗
12/19/2017321552066Open ↗
11/27/2017321552066Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/02/2017321552066Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01343645-I1Open ↗
08/18/2026B01343215-P1Open ↗
08/18/2026B01343215-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/15/2017321552066Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/30/2018321552066Open ↗
04/24/2018321552066Open ↗
04/11/2018321552066Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
04/11/2018321552066Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/26/2018321552066Open ↗
04/30/2018321552066Open ↗
04/24/2018321552066Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
05/15/2017321552066Open ↗
05/02/2017321552066Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
04/24/2018321552066Open ↗
04/11/2018321552066Open ↗
05/02/2017321552066Open ↗
▸Filing & Intake Forms11
▸BISBOROUGH INTAKE FORM5
06/26/2018321552066Open ↗
04/30/2018321552066Open ↗
04/24/2018321552066Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
01/23/2018321552066Open ↗
11/27/2017321552066Open ↗
09/14/2017321552066Open ↗
▸BISEFILING COVER SHEET3
05/19/2017321552066Open ↗
05/02/2017321552066Open ↗
05/02/2017321552066Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
05/02/2017321552066Open ↗