Miscellaneous two family
596 7 STREET
BROOKLYN · BIN 3025826
💬 Discuss this project
1903Year Built
3Stories
B9Building Class
R7BZoning
3,524 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,667 sf lot · 2.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 3 filings · 20 docs
Floor 324p · 3 filings · 20 docs
Floor 219p · 1 filing · 15 docs
Floor 119p · 1 filing · 15 docs
Cellar30p · 4 filings · 20 docs
Basement19p · 1 filing · 15 docs
1 job · most recent 01/03/2024
General Wiring
FiledStatusContractorScope
01/03/2024CompleteFRIED ELECTRIC CO.General Wiring
Building Lifecycle
All (72)Filed (13)Permit Issued (6)Signed Off (5)Violation (10)Inspection (7)Objection (6)Special Inspection (25)
04/30/2026
Violation issued (HPD, closed)
A
02/10/2026
Signed off — Alteration CO
Partial renovation, reconfiguration and conversion of existing 3 family to 2 family. Installation of partitions, walls and floor finishes. Refurbish existing 2-story bays at front and rear.
B00705343-I1
12/01/2025
Signed off — Alteration
Installation of new plumbing and sprinkler for existing 2 Family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08008155-I1
06/11/2025
Objection resolved — Addressed
06/09/2025
Filed — Alteration
Installation of new plumbing and sprinkler for existing 2 Family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08008155-P5
05/22/2025
Objection raised — Zoning
05/19/2025
Signed off — Alteration
Installation of sprinkler system. No change of use, egress or occupancy under this application.
B08008161-I1
05/16/2025
Objection raised — Scope
05/16/2025
Objection resolved — Addressed
05/16/2025
Objection raised — Admin
05/16/2025
Objection resolved — Addressed
05/09/2025
Filed — Alteration CO
Partial renovation, reconfiguration and conversion of existing 3 family to 2 family. Installation of partitions, walls and floor finishes. Refurbish existing 2-story bays at front and rear.
B00705343-P2
04/25/2025
Signed off — Alteration
Installation of HVAC unit. No change of use, egress or occupancy under this application
B08008168-I1
04/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/25/2025
Filed — Alteration
Installation of new plumbing and sprinkler for existing 2 Family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08008155-P4
03/11/2025
Filed — Alteration
Installation of sprinkler system. No change of use, egress or occupancy under this application.
B08008161-P1
03/11/2025
Filed — Alteration
Installation of new plumbing and sprinkler for existing 2 Family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08008155-P3
03/11/2025
Special inspection requirement — Sprinkler Systems
FLORINELA MURESAN
03/06/2025
Special inspection requirement — Sprinkler Systems
FLORINELA MURESAN
01/21/2025
Permit issued — General Construction
B00705343-I1-GC
12/09/2024
Signed off — Alteration
Structural remediation existing front bay window for existing (2) Family dwelling
B00705373-I1
10/25/2024
Filed — Alteration
Installation of new plumbing and sprinkler for existing 2 Family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08008155-P2
10/24/2024
Special inspection requirement — Maintenance information
FLORINELA MURESAN
10/24/2024
Special inspection requirement — Permanent certificate
FLORINELA MURESAN
10/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FLORINELA MURESAN
10/24/2024
Special inspection requirement — Mechanical Systems
FLORINELA MURESAN
10/24/2024
Special inspection requirement — Final
FLORINELA MURESAN
10/24/2024
Special inspection requirement — Shutoff dampers
FLORINELA MURESAN
10/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
FLORINELA MURESAN
10/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
FLORINELA MURESAN
10/23/2024
Filed — Alteration
Installation of HVAC unit. No change of use, egress or occupancy under this application
B08008168-P1
10/02/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/27/2024
Special inspection requirement — Shutoff dampers
FLORINELA MURESAN
06/27/2024
Special inspection requirement — Mechanical Systems
FLORINELA MURESAN
06/27/2024
Special inspection requirement — Final
FLORINELA MURESAN
06/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
FLORINELA MURESAN
06/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FLORINELA MURESAN
06/27/2024
Special inspection requirement — Maintenance information
FLORINELA MURESAN
06/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
FLORINELA MURESAN
06/27/2024
Special inspection requirement — Permanent certificate
FLORINELA MURESAN
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
10/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2023
Filed — Alteration
Installation of new plumbing and sprinkler for existing 2 Family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08008155-P1
08/23/2023
Permit issued — Mechanical Systems
B08008168-I1-MS
07/13/2023
Permit issued — Structural
B00705373-I1-ST
07/07/2023
Permit issued — Sprinklers
B08008161-I1-EW-SP
07/07/2023
Permit issued — Plumbing
B08008155-I1-PL
05/31/2023
Permit issued — General Construction
B00705343-I1-GC
05/16/2023
Filed — Alteration
Structural remediation existing front bay window for existing (2) Family dwelling
B00705373-I1
05/16/2023
Special inspection requirement — Post-installed Anchors
Celin Munoz
05/16/2023
Special inspection requirement — Structural Cold-Formed Steel
Celin Munoz
05/10/2023
Filed — Alteration
Installation of new plumbing and sprinkler for existing 2 Family dwelling. No change of use, egress or occupancy under this application. See comment#24
B08008155-I1
05/10/2023
Filed — Alteration
Installation of sprinkler system. No change of use, egress or occupancy under this application.
B08008161-I1
05/10/2023
Filed — Alteration
Installation of HVAC unit. No change of use, egress or occupancy under this application
B08008168-I1
03/20/2023
Violation issued (HPD, closed)
A
Latest 60 of 72 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLORINELA MURESAN1006/09/2025
NC2 ARCHITECTURE LLC205/09/2025
A DEGREE OF FREEDOM STRUCTURAL ENGI105/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LLOYD NOEL BUILDING CONSULTANT1303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TCS CONSTRUCTION CORPGeneral Contractor807/08/2026
M&D FIRE SPRINKLER INCFire Protection107/08/2026
RITE WAY HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NC2 ARCHITECTURE LLC3454205/09/2025
MWB ENGINEERING7942403/11/2025
CELIN MUNOZ CONSULTING EN1064105/16/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTCS CONSTRUCTION CORP01/21/2025
DOB NOWMechanical SystemsSigned-offTCS CONSTRUCTION CORP08/23/2023
DOB NOWStructuralSigned-offTCS CONSTRUCTION CORP07/13/2023
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC07/07/2023
DOB NOWPlumbingSigned-offLS PLUMBING CORP07/07/2023
DOB NOWGeneral ConstructionPermit IssuedTCS CONSTRUCTION CORP05/31/2023
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/11/2025Sprinkler SystemsFLORINELA MURESANspecial
03/06/2025Sprinkler SystemsFLORINELA MURESANspecial
10/24/2024Maintenance informationFLORINELA MURESANenergy_progress
10/24/2024Permanent certificateFLORINELA MURESANenergy_progress
10/24/2024HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
10/24/2024Mechanical SystemsFLORINELA MURESANspecial
10/24/2024FinalFLORINELA MURESANprogress
10/24/2024Shutoff dampersFLORINELA MURESANenergy_progress
10/24/2024HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
10/24/2024HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
06/27/2024Shutoff dampersFLORINELA MURESANenergy_progress
06/27/2024Mechanical SystemsFLORINELA MURESANspecial
06/27/2024FinalFLORINELA MURESANprogress
06/27/2024HVAC-R and service water heating equipmentFLORINELA MURESANenergy_progress
06/27/2024HVAC-R and service water piping design and insulationFLORINELA MURESANenergy_progress
06/27/2024Maintenance informationFLORINELA MURESANenergy_progress
06/27/2024HVAC-R and service water heating system controlsFLORINELA MURESANenergy_progress
06/27/2024Permanent certificateFLORINELA MURESANenergy_progress
05/16/2023Post-installed AnchorsCelin Munozspecial
05/16/2023Structural Cold-Formed SteelCelin Munozspecial
06/30/2022Structural Stability – Alterations of existing buildingsCelin Munozspecial
03/24/2022FinalCelin Munozprogress
03/24/2022Structural Steel - WeldingCelin Munozspecial
03/24/2022Structural Steel - High Strength BoltingCelin Munozspecial
03/24/2022Structural Steel - DetailsCelin Munozspecial
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026B08008168-I1Request digital key ↗
08/27/2026B08008168-P1Request digital key ↗
08/27/2026B00705373-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/27/2026B08008168-I1Open ↗
08/13/2026B08008168-P1Open ↗
08/13/2026B08008155-P1Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00705343-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026B00705373-I1Open ↗
08/27/2026B08008168-I1Open ↗
08/27/2026B08008168-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026B08008168-I1Open ↗
08/22/2026B08008161-P1Open ↗
08/22/2026B08008161-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B00705373-I1Open ↗
09/23/2026B00705373-I1Open ↗
09/23/2026B00705373-I1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00705343-P2Open ↗
08/13/2026B00705343-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/22/2026B08008161-I1Open ↗
08/21/2026B00705343-I1Open ↗
08/21/2026B08008155-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/21/2026B00705343-I1Open ↗
08/15/2026B00705343-P2Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026B00705343-P2Open ↗
08/13/2026B00705343-I1Open ↗