DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
ECB03/20/2018AS PER CLASS 2 (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSP AS PER DOB RECORDS SUBMIT A CURRENT INITIAL INSP REPORT.$625 due
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB02/09/2011FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB10/12/2010V-DOB VIOLATION - ACTIVE
DOB10/04/2010FAILURE TO MAINTAIN: DESTABLIZED BLDG, OUT OF PLUMB APPROX. 10; LEANIN G AGAINST ADJACENT BLDG. UNSTABLE STAIRS & STRUCTURAL MEMBERS; COLLAPS ED WALLS & CEILINGS & BRICKWORK, FIRE AND WATER DAMAGE
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB11/08/2010FAILURE TO MAINTAIN BUILDING. NOTED: BUILDING IS OUT OF PLUMBING APPROX 10" & LEANING AGAINST ADJACENT BLDG INTERIOR STRUCTURAL MEMBERS UNSTABLE. FLOORS ARE SUNKEN & SAGGING WALLS & CEILINGS ARE PERFORATED &Nothing owed — awaiting certificate of correction
ECB06/18/2007FAILURE TO MAINTAIN BLDG.3 STORY STRUCTURE HAS SHIFTED BY APPROX 6"-8"PAST VERTICAL ALIGNMENT.REMEDY:MAINTAIN BLDG & MAKE IT SAFE FOR OCCUP ANCY.Nothing owed — awaiting certificate of correction
ECB01/17/2007FAILURE TO MAINTAIN.NOTE:3 STORY STRUCTURE HAS SHIFTED TO WEST SIDE APPROX 6"-8"PAST VERTICAL ALIGNMENT(PHOTO).REMEDY:1 MAINTAIN BUILDING & MAKE SAFE.2 PROVIDE ENGINEERS STABILITY REPORT TO BORO OFFICE ORNothing owed — awaiting certificate of correction
ECB09/20/2006FAILURE TO MAINTAIN BLDG BLDG HAS SHIFTED APPROX 3" FROM GROUND LEVEL TO 3RD FL @ EAST NOTE:SPACE BETWEEN BLDGS (ADJOINING) HAVE BEEN FILLEDWITH A CONCRETE FILL SPACE CRACK HAS REDEVELOPED IN THIS AREA.Nothing owed — awaiting certificate of correction
ECB12/22/2005FAILURE TO MAINTAIN. DEFECT NOTED (1) BLDG IS LEANING (SHIFTED) =3'FROM GROUND FLOOR TO 3RD FLOOR EVIDENT FROM SPACE BETWEEN ADJ BLDG AT EAST. INSIDE AT 3RD FLOOR DOOR JAMBS ARE RACKED ALSO AT 2ND AND 1ST FLOORNothing owed — awaiting certificate of correction
ECB12/22/2005USE OF ILLEGAL HARDWARE. AT GROUND FL EXIT (EGRESS) AT FRONT A TURN TYPE DOOR KNOB THAT WHEN TURNED WILL NOT OPEN THE DOOR. A SMALL LEVER ON TOP OF HARDWARE MUST BE TURNED NUMEROUS TIMES TO GAIN EXIT OUTSIDE OFNothing owed — awaiting certificate of correction
ECB02/18/2005WORK W/O A PERMIT.NOTE.AT REAR OF BUILDING ENTIRE REAR YARD IS PAVED WITH CONCRETE APPROX 16'X 25' (LOOSE) WITHOUT DRAIN,A PLYWOOD STRUCTURE APPROX 12'H X 16'L X 12'W ALSO ERECTED AT REAR WITH A LARGE WALK INNothing owed — awaiting certificate of correction
ECB08/05/2004FAILURE TO MAINTAIN BLDG. NOTED ON 3RD FL A SECTION OF THE CEILING APPROX 4'X4' HAS CAME DOWN CREATING A HOLE THAT EXPOSES THE ROOF. CRACKS & WATER HAVE BEEN CREATED ON THE N. & W. WALLS THERE ARE ALSO CRACKS INothing owed — awaiting certificate of correction
ECB08/05/2004FAILURE TO MAINTAIN EXTERIOR BLDG WALL. NOTED: THERE IS A LARGE CRACK ON THE EAST SIDE OF THE BLDG WALL THE FACES THE STREET IT IS APPROX 8' TO 10' LONG & APPROX 1" TO 2" WIDE REMEDY: REPAIR DEFECTNothing owed — awaiting certificate of correction