← Back
Zoned residential, not Manhattan
598 STERLING PLACE
BROOKLYN · BIN 3429824
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6BZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: EMPIRE ON STERLING LLC · 2,620 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 2 docs
Penthouse22p · 1 filing · 20 docs
Floor 418p · 2 filings · 20 docs
Floor 320p · 2 filings · 20 docs
Floor 218p · 2 filings · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar23p · 1 filing · 20 docs
1 job · most recent 02/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/02/2026Permit IssuedEMPIRE BUILDERS GROUP NYHeating and Air Conditioning Systems
Heat / Cool
Intertek MO4HX-H27B-2A 22,000 BTU · Condensing Unit ×5
MO5HX-H36B-2A 36,000 BTU · Condensing Unit ×1
MO6HX-H48B-2A 48,000 BTU · Condensing Unit ×1
1 job · most recent 02/02/2026
Sprinkler System
FiledStatusContractorScope
02/02/2026Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 job · most recent 02/02/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
02/02/2026Signed-offKISHAN PLUMBING INCPlumbing-Sprinkler, Storm, Water/Sanitary
1 job · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026CompleteK.A.B. ELECTRIC CORPGeneral Wiring
1 job · most recent 02/02/2026
FiledStatusContractorScope
02/02/2026Signed-offCITYWIDE PLBG, HTG &SPRKL4 scope_items
Building Lifecycle
All (132)Filed (17)Permit Issued (15)Signed Off (9)Violation (4)Inspection (11)Objection (46)Special Inspection (30)
08/10/2026
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-I1
08/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/20/2026
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-S3
07/07/2026
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-S4
06/09/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/22/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
05/21/2026
Permit issued — Sprinklers
B01047928-S3-EW-SP
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Permit issued — Plumbing
B01047928-S3-PL
04/06/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/12/2026
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-S2
02/02/2026
Filed — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-A3
01/21/2026
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-S6
01/15/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01152288-I1
01/14/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01152306-I1
01/12/2026
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-S5
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/15/2025
Violation issued (ECB, closed)
Unknown
11/24/2025
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-S1
10/23/2025
Filed — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-A1
10/23/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
10/23/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
10/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/23/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
10/23/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
10/23/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
10/23/2025
Special inspection requirement — Combustible Exterior Wall Coverings
FAHAD FATEH
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/23/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
10/23/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
10/23/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
10/23/2025
Special inspection requirement — Metering
FAHAD FATEH
10/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/23/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
10/23/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
10/23/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/23/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
10/23/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/27/2025
Permit issued — General Construction
B01047928-I1-GC
07/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2025
Objection resolved — Addressed
07/16/2025
Objection raised — Mechanical
07/01/2025
Filed — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL NEW BUILDING
B01047928-P8
06/30/2025
Special inspection requirement — Metering
FAHAD FATEH
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/30/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
06/30/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/30/2025
Special inspection requirement — Combustible Exterior Wall Coverings
FAHAD FATEH
06/30/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
06/30/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
06/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/30/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/30/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/27/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01152288-P1
05/09/2025
Violation issued (ECB, closed)
Construction
04/23/2025
Permit issued — Supported Scaffold
B01152306-I1-SF
Latest 60 of 132 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M T STRUCTURE GROUP907/08/2026
EMPIRE BUILDERS GROUP503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/27/2024$1.2M—Private party → EMPIRE ON STERLING LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SURESH MATHEW102/02/2026
ARC ARCHITECTURE + DESIGN STUDIO610/23/2025
KNF SERVICES CROP305/15/2025
R & O ENGINEERING510/28/2024
JRS CONSULTING206/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO903/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
KNF SERVICES CROP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE BUILDERS GROUP NYGeneral Contractor1307/08/2026
KISHAN PLUMBING INCPlumbing207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection106/28/2026
SAT CONSTRUCTION SERVICESGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161202/02/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDYNAMIC PLBNG & SPRKR COR05/21/2026
DOB NOWPlumbingSigned-offKISHAN PLUMBING INC04/15/2026
DOB NOWGeneral ConstructionPermit IssuedEMPIRE BUILDERS GROUP NY08/27/2025
DOB NOWSupported ScaffoldSigned-offEMPIRE BUILDERS GROUP NY04/23/2025
DOB NOWConstruction FenceSigned-offEMPIRE BUILDERS GROUP NY04/22/2025
DOB NOWSidewalk ShedSigned-offEMPIRE BUILDERS GROUP NY03/11/2025
DOB NOWGeneral ConstructionPermit IssuedEMPIRE BUILDERS GROUP NY03/06/2025
DOB NOWStructuralSigned-offEMPIRE BUILDERS GROUP NY02/18/2025
DOB NOWFoundationSigned-offSAT CONSTRUCTION SERVICES11/19/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC10/04/2024
DOB NOWFoundationSigned-offEMPIRE BUILDERS GROUP NY09/20/2024
DOB NOWSupport of ExcavationSigned-offEMPIRE BUILDERS GROUP NY09/06/2024
DOB NOWMechanical SystemsSigned-offEMPIRE BUILDERS GROUP NY09/05/2024
DOB NOWGeneral ConstructionPermit IssuedEMPIRE BUILDERS GROUP NY09/05/2024
DOB NOWConstruction FenceSigned-offEMPIRE BUILDERS GROUP NY05/17/2024
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/22/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
10/23/2025Fenestration air leakageFAHAD FATEHenergy_progress
10/23/2025Interior lighting powerFAHAD FATEHenergy_progress
10/23/2025Exterior lighting powerFAHAD FATEHenergy_progress
10/23/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
10/23/2025Air barrier — testing FAHAD FATEHenergy_progress
10/23/2025Fenestration areasFAHAD FATEHenergy_progress
10/23/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
10/23/2025MeteringFAHAD FATEHenergy_progress
10/23/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/23/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/23/2025Combustible Exterior Wall CoveringsFAHAD FATEHspecial
10/23/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
10/23/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/23/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
10/23/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
10/23/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/23/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
10/23/2025Lighting controlsFAHAD FATEHenergy_progress
10/23/2025Maintenance informationFAHAD FATEHenergy_progress
06/30/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
06/30/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
06/30/2025Fenestration areasFAHAD FATEHenergy_progress
06/30/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/30/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/30/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
Latest 25 of 103.
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026B01047928-P1Contact architect ↗
08/24/2026B01047928-S7Contact architect ↗
08/24/2026B01047928-A1Contact architect ↗
Showing 3 of 16 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
09/25/2025322122136Open ↗
05/29/2024340910937Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/29/2024340910937Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B01047928-P3Open ↗
08/13/2026B01047928-I1Open ↗
08/13/2026B01047928-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B01047928-I1Open ↗
08/13/2026B01047928-A1Open ↗
08/13/2026B01047928-P8Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/20/2025322122136Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/20/2025322122136Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/20/2025322122136Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01047928-I1Open ↗
▸Seals & Professional Certifications48
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026B01047928-P8Open ↗
09/02/2026B01047928-P8Open ↗
09/01/2026B01047928-S6Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/24/2026B01047928-P3Open ↗
08/24/2026B01047928-S7Open ↗
08/24/2026B01047928-P8Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B01047928-P8Open ↗
09/02/2026B01047928-P8Open ↗
08/31/2026B01047928-S2Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/29/2024340910937Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/29/2024340910937Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B01047928-P3Open ↗
08/13/2026B01047928-A1Open ↗
08/13/2026B01047928-P8Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/13/2026B01047928-A1Open ↗
08/13/2026B01047928-P3Open ↗
08/13/2026B01047928-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/24/2026B01047928-I1Open ↗
08/13/2026B01047928-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/09/2024340910937Open ↗
▸BISSTREET TREE CHECKLIST1
05/29/2024340910937Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01047928-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01047928-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT5
08/13/2026B01047928-S6Open ↗
08/13/2026B01047928-P2Open ↗
08/13/2026B01047928-S7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B01047928-S4Open ↗
08/13/2026B01047928-S7Open ↗
08/13/2026B01047928-S6Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/20/2025322122136Open ↗
10/20/2025322122136Open ↗
10/20/2025322122136Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
05/29/2024340910937Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/09/2024340910937Open ↗
▸BISEFILING COVER SHEET1
09/25/2025322122136Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/13/2026B01047928-A1Open ↗
08/13/2026B01047928-P8Open ↗
08/13/2026B01047928-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B01047928-I1Open ↗
08/13/2026B01047928-A1Open ↗
08/13/2026B01047928-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026B01047928-A1Open ↗
08/24/2026B01047928-I1Open ↗
08/24/2026B01047928-P8Open ↗
Showing 3 of 4 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
10/20/2025322122136Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/20/2025322122136Open ↗
▸BISPLOT DIAGRAM1
10/20/2025322122136Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/18/2024340910937Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01047928-S6Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01047928-I1Open ↗