Hospital, sanitarium, mental institution
H+H_4311_Dr. Susan Smith McKinney Nursing Center
599 KINGSTON AVENUE · BIN 3327674
💬 Discuss this project
1991Year Built
5Stories
I1Building Class
R6Zoning
561,945 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized6 Open Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Hospital, sanitarium, mental institution · 504,440 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Roof3p · 2 filings · 16 docs
Penthouse4p · 2 filings · 10 docs
Floor 57p · 2 filings · 10 docs
Floor 44p · 2 filings · 10 docs
Floor 36p · 1 filing · 3 docs
Floor 26p · 1 filing · 3 docs
Floor 18p · 3 filings · 17 docs
Cellar4p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OHM'S ELECTRICAL CORP.703/22/2026
NYC H+H KINGS COUNTY HOSPITAL CT603/22/2026
KINGS COUNTY HOSPITAL CENTER1303/21/2026
KINGS COUNTY HOSPITAL CENTER-HHC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES203/21/2026
LOMBARDO PROFESSIONAL ENGINEERING103/21/2026
S R SOLAR DESIGN403/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
BAZINI ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAIRE LLCGeneral Contractor507/08/2026
SOLAR ONE INCGeneral Contractor407/08/2026
DONNELLY MECHANICAL CORPGeneral Contractor203/21/2026
OHM'S ELECTRICAL CORPGeneral Contractor203/21/2026
DOUBLE 'R' ELEC'L CONTR'GElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244211/26/2025
TWIN PEAKS INC.317109/18/2024
20/20 INSPECTIONS INC1471102/24/2021
Building Lifecycle
All (88)Filed (6)Permit Issued (9)Signed Off (3)Violation (51)Special Inspection (19)
05/27/2026
Permit issued — General Construction
B01109542-I1-GC-CX
05/26/2026
Permit issued — General Construction
B01109542-I1-GC-CX
01/02/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01182171-I1
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
12/17/2025
Special inspection requirement — Final
NARESH MAHANGU
12/17/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
11/26/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01182171-P1
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
11/25/2025
Special inspection requirement — Final
NARESH MAHANGU
11/25/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
09/29/2025
Permit issued — General Construction
B01109542-I1-GC-CX
09/05/2025
Violation issued (FDNY_ORDER, closed)
07/28/2025
Signed off — Alteration
PROPOSED ENERGY ANALYSIS FOR LIGHTING COMPLIANCE FOR MCKINNEY HOSPITAL - NO WORK IS PROPOSED AS ALL WORK HAS BEEN FILED UNDER ELECTRICAL PERMIT - DOB NOW: BUILD # B01094215-I1-EL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01139799-I1
06/23/2025
Permit issued — General Construction
B01139799-I1-GC
06/05/2025
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY TELEHANDLER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01235441-I1
06/05/2025
Permit issued — Protection and Mechanical Methods
B01235441-I1-PMM
03/05/2025
Permit issued — Solar
B01182171-I1-SL
02/25/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01182171-I1
11/20/2024
Filed — Alteration
PROPOSED ENERGY ANALYSIS FOR LIGHTING COMPLIANCE FOR MCKINNEY HOSPITAL - NO WORK IS PROPOSED AS ALL WORK HAS BEEN FILED UNDER ELECTRICAL PERMIT - DOB NOW: BUILD # B01094215-I1-EL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01139799-I1
09/26/2024
Permit issued — General Construction
B01109542-I1-GC-CX
09/23/2024
Permit issued — General Construction
B01109542-I1-GC-CX
09/18/2024
Filed — Alteration
DEMOLISH TWO EXISTING ELECTRIC, CENTRIFUGAL CHILLERS. PROVIDE NEW 6-PIPE WATER-TO-WATER HEAT PUMPS. REPLACE 3 EXISTING CHILLED WATER PUMPS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01109542-I1
09/18/2024
Special inspection requirement — Maintenance information
MAXIM KORNGOLD
09/18/2024
Special inspection requirement — Electrical motors and elevators
MAXIM KORNGOLD
09/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
MAXIM KORNGOLD
09/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
MAXIM KORNGOLD
09/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAXIM KORNGOLD
09/18/2024
Special inspection requirement — Shutoff dampers
MAXIM KORNGOLD
09/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
09/11/2024
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
09/11/2024
Special inspection requirement — Final
THOMAS DIBENEDETTO
09/11/2024
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
09/11/2024
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
03/27/2024
Violation issued (FDNY_NOV, closed)
07/26/2023
Violation issued (FDNY_NOV, closed)
06/09/2022
Signed off — Alteration
Add UVGI and bipolar ionization to existing AHU in cellar. Add HEPA fan powered filter to dental suite on 1st floor.
B00458030-I1
03/29/2022
Violation issued (ECB, open)
Elevators
12/03/2021
Violation issued (FDNY_NOV, closed)
12/03/2021
Violation issued (FDNY_NOV, closed)
04/16/2021
Violation issued (ECB, closed)
Elevators
04/15/2021
Violation issued (ECB, closed)
Elevators
04/09/2021
Permit issued — Mechanical Systems
B00458030-I1-MS
03/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/05/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2021
Filed — Alteration
Add UVGI and bipolar ionization to existing AHU in cellar. Add HEPA fan powered filter to dental suite on 1st floor.
B00458030-I1
12/07/2020
Violation issued (FDNY_ORDER, closed)
03/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/26/2019
Violation issued (FDNY_NOV, closed)
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/02/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDYNAIRE LLC05/27/2026
DOB NOWGeneral ConstructionSigned-offDYNAIRE LLC05/26/2026
DOB NOWGeneral ConstructionSigned-offDYNAIRE09/29/2025
DOB NOWGeneral ConstructionSigned-offOHM'S ELECTRICAL CORP06/23/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSOLAR ONE INC06/05/2025
DOB NOWSolarSigned-offSOLAR ONE INC03/05/2025
DOB NOWGeneral ConstructionSigned-offDYNAIRE09/26/2024
DOB NOWGeneral ConstructionSigned-offDYNAIRE09/23/2024
DOB NOWMechanical SystemsSigned-offDONNELLY MECHANICAL CORP04/09/2021
BISPLISSUEDDURR MECHANICAL CONT. INC05/01/2018
BISOTISSUEDBLOOM ENERGY CORPORATION03/07/2018
BISMHISSUEDBLOOM ENERGY CORPORATION01/24/2018
BISOTISSUEDBLOOM ENERGY CORPORATION01/17/2018
BISMHISSUEDINTERSTATE MECH SVCS INC02/23/2017
BISMHISSUEDVOLMAR CONSTRUCTION INC10/27/2016
BISFSISSUEDPETER AGLIARDO CONTRACTOR08/25/2016
BISMHISSUEDVOLMAR CONSTRUCTION INC04/25/2016
BISMHISSUEDINTERSTATE MECH SVCS INC03/10/2016
BIS—ISSUEDKINGS COUNTY HOSPITAL02/12/2016
BIS—ISSUEDHEALTH AND HOSPITALS CORP.01/08/2014
BISSPISSUEDSTELLMAR PLBG & MECH CORP08/15/2006
BISOTISSUEDRELIANCE GC INC04/11/2006
BISPLISSUEDTHOMAS F. CASH & SONS INC12/07/2005
BISOTISSUEDMANHATTAN CONTRACTING CORP06/15/2005
BISMHISSUEDMANHATTAN CONTRACTING CORP06/15/2005
BISMHISSUEDDDC AIR CONDITIONING10/22/2002
BISOTRE-ISSUEDROTHSTEIN_& HOFFMAN ELECTRIC07/31/2002
BISMHISSUEDDKJ CONSTRUCTION04/09/2002
BISPLISSUEDZARA PLUMBING CORP04/09/2002
BISFSISSUEDSAME08/21/1997
BISMHISSUEDMARTIN ASSOCIATES INC07/22/1997
BISSDISSUEDRICHARDS PLBG & HTG CO INC08/27/1996
BISFPISSUEDB & J FIRE INC. T/A FIRE MASTERS06/18/1996
BISEQISSUEDREGIONAL SCAFFOLD AND CO. INC.01/04/1996
BISSDISSUEDRICHARDS PLBG & HTG CO INC07/17/1995
BISSDISSUEDRICHARDS PLBG & HTG CO INC03/24/1995
1 project · most recent 09/18/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2024Signed-offDYNAIRE LLCHeating and Air Conditioning Systems
Heat / Cool
Trane MWS THERMAFIT 5-MODULE 344 tons · Heat Pump Outdoor ×2
8 projects · most recent 08/21/2025
General Wiring Lighting
FiledStatusContractorScope
08/21/2025CompleteOHM'S ELECTRICAL CORPGeneral Wiring
04/28/2025CompleteNEWGRANGE ELECTRIC, INC—
03/21/2025Permit IssuedCANDELA SYSTEMS CORP DBAGeneral Wiring
02/28/2025CompleteOHM'S ELECTRICAL CORPLighting
04/16/2021CompleteUNITY ELECTRIC CO INCGeneral Wiring
07/26/2019Permit IssuedTUXEDO ELEC'L CONTR'G INCGeneral Wiring
06/20/2018CompleteDOUBLE "R" ELEC'L CONTR'G—
04/20/2018CompleteSOLAR ELEC. SYSTEMS, INC.—
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/17/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
12/17/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
12/17/2025FinalNARESH MAHANGUprogress
12/17/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
11/25/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
11/25/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/25/2025FinalNARESH MAHANGUprogress
11/25/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
09/18/2024Maintenance informationMAXIM KORNGOLDenergy_progress
09/18/2024Electrical motors and elevatorsMAXIM KORNGOLDenergy_progress
09/18/2024HVAC-R and service water heating equipmentMAXIM KORNGOLDenergy_progress
09/18/2024HVAC-R and service water heating system controlsMAXIM KORNGOLDenergy_progress
09/18/2024HVAC-R and service water piping design and insulationMAXIM KORNGOLDenergy_progress
09/18/2024Shutoff dampersMAXIM KORNGOLDenergy_progress
09/11/2024Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
09/11/2024Post-installed AnchorsMAXIM KORNGOLDspecial
09/11/2024FinalTHOMAS DIBENEDETTOprogress
09/11/2024Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
09/11/2024Mechanical SystemsMAXIM KORNGOLDspecial
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/24/2026B01109542-I1Request digital key ↗
08/23/2026B01139799-I1Request digital key ↗
08/22/2026B01182171-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00458030-I1Request digital key ↗
▸Applications & Permits34
▸BISWORK PERMIT APPLICATION10
05/01/2018321704820Open ↗
03/07/2018321714258Open ↗
01/24/2018321704820Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/28/2020321704820Open ↗
03/07/2018321714258Open ↗
12/29/2017321704820Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION7
07/14/2014320782925Open ↗
05/21/2014320782916Open ↗
05/21/2014320782907Open ↗
Showing 3 of 7 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF5
08/19/2015320782907Open ↗
08/19/2015320782907Open ↗
08/19/2015320782934Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY4
07/17/2013320782934Open ↗
07/17/2013320782925Open ↗
07/17/2013320782916Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications48
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
05/21/2018321704820Open ↗
03/07/2018321714258Open ↗
03/07/2018321714258Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026B01182171-I1Open ↗
08/27/2026B01182171-I1Open ↗
08/25/2026B01182171-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00458030-I1Open ↗
08/22/2026B01182171-I1Open ↗
08/21/2026B01235441-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/07/2018321714258Open ↗
04/20/2016321370654Open ↗
02/12/2016340339002Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026B01182171-I1Open ↗
08/25/2026B01182171-P1Open ↗
08/24/2026B01109542-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/07/2018321714258Open ↗
04/20/2016321370654Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/12/2016340339002Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/12/2016340339002Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
09/12/2016321370654Open ↗
04/20/2016321370654Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/29/2017321370654Open ↗
04/20/2016321370654Open ↗
▸BISSCHEDULE B - PLUMBING1
10/28/2020321704820Open ↗
▸BISEQUIPMENT USE PERMITS1
09/29/2017321370654Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/29/2017321704820Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/25/2016321164681Open ↗
02/12/2016340339002Open ↗
10/05/2012320547663Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026B00458030-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/07/2018321714258Open ↗
01/16/2018340339002Open ↗
12/29/2017321704820Open ↗
Showing 3 of 6 on file for this type
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)4
08/18/2015320782925Open ↗
08/18/2015320782916Open ↗
08/18/2015320782934Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/10/2016340339002Open ↗
02/12/2016340339002Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/16/2018340339002Open ↗
09/29/2017321370654Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/12/2016340339002Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00458030-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/12/2016340339002Open ↗
02/12/2016340339002Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/17/2018321704820Open ↗
▸Approvals, Objections & Sign-offs30
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/29/2017321370654Open ↗
08/18/2015320782925Open ↗
08/18/2015320782916Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
07/14/2015321164681Open ↗
07/17/2013320782934Open ↗
07/17/2013320782925Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/01/2026B00458030-I1Open ↗
08/22/2026B01182171-I1Open ↗
08/13/2026B01235441-I1Open ↗
Showing 3 of 6 on file for this type
▸BISFLAME SPREAD/FIRE LETTER4
08/18/2015320782925Open ↗
08/18/2015320782916Open ↗
08/18/2015320782934Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/16/2018340339002Open ↗
09/29/2017321370654Open ↗
08/24/2016320547663Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
04/03/2014320547663Open ↗
10/05/2012320547663Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
09/01/2026B00458030-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
09/01/2026B00458030-I1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01182171-I1Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
03/07/2018321714258Open ↗
01/16/2018340339002Open ↗
12/29/2017321704820Open ↗
Showing 3 of 7 on file for this type
▸BISWELDERS AFFIDAVIT1
01/17/2018321704820Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION6
03/02/2021321704820Open ↗
12/17/2020321704820Open ↗
05/21/2018321704820Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
03/07/2018321714258Open ↗
12/29/2017321704820Open ↗
04/20/2016321370654Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
01/16/2018340339002Open ↗
09/29/2017321370654Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/12/2016340339002Open ↗