← Back
One family attached or semi-detached
6 BAY RIDGE PLACE
BROOKLYN · BIN 3145652
💬 Discuss this project
1910Year Built
2Stories
A5Building Class
R5BZoning
2,400 sfGross Floor Area
1Units
One family attached or semi-detached · 1,600 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof2p · 2 filings · 15 docs
Floor 21p · 1 filing · 12 docs
Floor 1
Cellar6p · 2 filings · 20 docs
2 jobs · most recent 11/14/2025
General Wiring
FiledStatusContractorScope
11/14/2025CompleteBROOKYLN SOLARWORKS, LLC—
04/20/2022CompleteINTELOGIC ELECTRIC, INC.General Wiring
Building Lifecycle
All (41)Filed (6)Permit Issued (5)Signed Off (3)Inspection (5)Special Inspection (22)
02/13/2026
Signed off — Alteration
B01318964-I1
11/25/2025
Permit issued — Solar
B01318964-I1-SL
11/21/2025
Filed — Alteration
B01318964-I1
04/24/2024
Signed off — Alteration
INSTALL NEW H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00717712-I1
04/19/2024
Signed off — Alteration
INSTALL NEW HVAC AND INTERIOR RENOVATION OF BASEMENT, 1ST AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00717564-I1
04/16/2024
Filed — Alteration
INSTALL NEW HVAC AND INTERIOR RENOVATION OF BASEMENT, 1ST AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00717564-P1
04/16/2024
Filed — Alteration
INSTALL NEW H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00717712-P2
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/16/2024
Special inspection requirement — Mechanical Systems
Eric Sun
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/16/2024
Special inspection requirement — Final
Eric Sun
04/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
04/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
04/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
04/16/2024
Special inspection requirement — Fenestration areas
Eric Sun
04/16/2024
Special inspection requirement — Air barrier - visual inspection
Eric Sun
04/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
04/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
04/16/2024
Special inspection requirement — Insulation placement and R values
Eric Sun
04/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
04/16/2024
Special inspection requirement — Interior lighting power
Eric Sun
04/16/2024
Special inspection requirement — Fenestration air leakage
Eric Sun
04/16/2024
Special inspection requirement — Permanent certificate
Eric Sun
04/16/2024
Special inspection requirement — Maintenance information
Eric Sun
04/16/2024
Special inspection requirement — Metering
Eric Sun
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/27/2023
Filed — Alteration
INSTALL NEW H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00717712-P1
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
KY FU
11/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/18/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/31/2023
Permit issued — Plumbing
B00717712-I1-PL
05/31/2023
Permit issued — Mechanical Systems
B00717564-I1-GC-CX
07/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2022
Permit issued — Mechanical Systems
B00717564-I1-GC-CX
04/13/2022
Filed — Alteration
INSTALL NEW H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00717712-I1
04/13/2022
Filed — Alteration
INSTALL NEW HVAC AND INTERIOR RENOVATION OF BASEMENT, 1ST AND 2ND FLOOR OF EXISTING 3 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00717564-I1
04/13/2022
Permit issued — Plumbing
B00717712-I1-PL
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/29/2024$1.7M—BROOKLYN BROWNSTONE HOME GROUP LLC → Private party$708/sf building
12/15/2021$975K—Private party → BROOKLYN BROWNSTONE HOME GROUP, LLC$406/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NARESH MAHANGU111/21/2025
NIC 88 CORP504/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1003/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor603/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244111/21/2025
NIC 88 CORP8371404/16/2024
FLUSHING ENGINEERING SERV4373112/27/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC11/25/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC05/31/2023
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY05/31/2023
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY04/14/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC04/13/2022
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/16/2024Energy Code Compliance InspectionsEric Sunprogress
04/16/2024Mechanical SystemsEric Sunspecial
04/16/2024Energy Code Compliance InspectionsEric Sunprogress
04/16/2024FinalEric Sunprogress
04/16/2024Fire-Resistance Rated ConstructionEric Sunprogress
04/16/2024Fenestration and door U-factor and product ratingsEric Sunenergy_progress
04/16/2024HVAC-R and service water heating system controlsEric Sunenergy_progress
04/16/2024Fenestration areasEric Sunenergy_progress
04/16/2024Air barrier - visual inspectionEric Sunenergy_progress
04/16/2024HVAC-R and service water piping design and insulationEric Sunenergy_progress
04/16/2024HVAC-R and service water heating equipmentEric Sunenergy_progress
04/16/2024Insulation placement and R valuesEric Sunenergy_progress
04/16/2024Duct leakage testing, insulation and designEric Sunenergy_progress
04/16/2024Interior lighting powerEric Sunenergy_progress
04/16/2024Fenestration air leakageEric Sunenergy_progress
04/16/2024Permanent certificateEric Sunenergy_progress
04/16/2024Maintenance informationEric Sunenergy_progress
04/16/2024MeteringEric Sunenergy_progress
04/16/2024Fire-Resistant Penetrations and JointsEric Sunspecial
04/16/2024Fire-Resistant Penetrations and JointsEric Sunspecial
12/27/2023Fire-Resistant Penetrations and JointsKY FUspecial
12/27/2023Energy Code Compliance InspectionsKY FUprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/30/2026B00717712-P2Request digital key ↗
08/30/2026B00717712-P1Request digital key ↗
08/30/2026B00717712-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/30/2026B00717712-P1Open ↗
08/30/2026B00717712-I1Open ↗
08/30/2026B00717564-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00717712-P1Open ↗
08/31/2026B00717712-P2Open ↗
08/23/2026B00717564-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00717712-P1Open ↗
08/31/2026B00717712-P2Open ↗
08/23/2026B00717564-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00717564-I1Open ↗
08/13/2026B00717712-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026B01318964-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00717564-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01318964-I1Open ↗