← Back
Two stories - detached, small or mid-size
6 CALDERA PLACE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5002298
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R1-2Zoning
2,688 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,368 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 8 docs
Filed — no permit issued19p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/21/2025
AVID DESIGNS, INC208/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/21/2025
AVID DESIGNS, INC.453108/19/2025
Building Lifecycle
All (21)Filed (3)Permit Issued (1)Special Inspection (17)
10/28/2025
Permit issued — Solar
S01303516-I1-SL
10/21/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01303516-I1
10/15/2025
Special inspection requirement — Final
Walid Abdulla
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/15/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/19/2025
Filed — Alteration
renovation of existing 1-family dwelling, no change to existing use/egress/occupancy/yards/bulk proposed under this application
S01259400-S1
08/11/2025
Filed — Alteration
renovation of existing 1-family dwelling, no change to existing use/egress/occupancy/yards/bulk proposed under this application
S01259400-I1
08/05/2025
Special inspection requirement — Interior lighting power
Jeffrey Geary
08/05/2025
Special inspection requirement — Insulation placement and R values
Jeffrey Geary
08/05/2025
Special inspection requirement — Fenestration air leakage
Jeffrey Geary
08/05/2025
Special inspection requirement — Air barrier - visual inspection
Jeffrey Geary
08/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Geary
08/05/2025
Special inspection requirement — Fenestration areas
Jeffrey Geary
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
07/22/2025
Special inspection requirement — Final
07/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/22/2025
Special inspection requirement — Subgrade Inspections
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2025
Special inspection requirement — Concrete - Cast-In-Place
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC10/28/2025
1 project · most recent 10/21/2025
FiledStatusContractorScope
10/21/2025Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 08/19/2025
Wood
FiledStatusContractorScope
08/19/2025——Wood
1 project · most recent 10/21/2025
FiledStatusContractorScope
10/21/2025Permit IssuedSUNRUN INSTALLATION SVC16 panels, 6.56 kw, 336 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/15/2025FinalWalid Abdullaprogress
10/15/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/15/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/15/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/15/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
08/05/2025Interior lighting powerJeffrey Gearyenergy_progress
08/05/2025Insulation placement and R valuesJeffrey Gearyenergy_progress
08/05/2025Fenestration air leakageJeffrey Gearyenergy_progress
08/05/2025Air barrier - visual inspectionJeffrey Gearyenergy_progress
08/05/2025Fenestration and door U-factor and product ratingsJeffrey Gearyenergy_progress
08/05/2025Fenestration areasJeffrey Gearyenergy_progress
07/22/2025Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
07/22/2025Final—progress
07/22/2025Structural Stability – Alterations of existing buildings—special
07/22/2025Subgrade Inspections—special
07/22/2025Fire-Resistant Penetrations and Joints—special
07/22/2025Concrete - Cast-In-Place—special
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026S01259400-I1Request digital key ↗
08/18/2026S01259400-S1Request digital key ↗
08/18/2026S01303516-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026S01259400-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature9
08/27/2026S01303516-I1Open ↗
08/27/2026S01303516-I1Open ↗
08/27/2026S01303516-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026S01303516-I1Open ↗
08/13/2026S01259400-S1Open ↗
08/13/2026S01259400-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01303516-I1Open ↗
08/27/2026S01303516-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026S01303516-I1Open ↗