← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
6 CORTLANDT ALLEY
MANHATTAN · BIN 1001865
💬 Discuss this project
1854Year Built
7Stories
RMBuilding Class
C6-4AZoning
20,105 sfGross Floor Area
6Units
LL97 CoveredRent Stabilized2 Active Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Huguenot · 3,776 sf lot · 5.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRa Property Mgmt.16p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 7Unit PHA13p · 4 filings · 20 docs
Floor 6Plumbing fixture installation, replacement, relocation 6th, 6p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Ra Property Mgmt.3p · 1 filing · 10 docs
CellarRa Property Mgmt.3p · 1 filing · 10 docs
Site & exteriorThe Martin Group, LLC9p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6 Cortlandt Alley4003/21/2026
372 Broadway Partners1603/21/2026
Huguenot1003/21/2026
The Martin Group707/08/2026
Abe Lesser Group503/21/2026
6 Cortlandt Alley Condominium503/21/2026
Phoenix203/21/2026
Vanick Properties203/21/2026
Good Counsel103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf104/29/2025
Basic Groups109/21/2023
DHD Architecture Design602/15/2023
B2B Associates108/16/2022
Gilsanz Murray Steficek105/04/2022
KZ Engineering112/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DHD Architecture1603/21/2026
Basic Groups203/21/2026
Synergy Building Consultants103/21/2026
KD Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLDNYGeneral Contractor407/08/2026
Apple Restoration & WaterproofScaffold307/08/2026
Topline NYCScaffold204/09/2026
JC HI TechGeneral Contractor207/08/2026
Orbit SprinklerFire Protection107/08/2026
American Standard P&H CororpPlumbing107/08/2026
Dynamic Blue Water MechanicalPlumbing107/08/2026
Montgomery Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Andrew Goodrich, P.E., PL965109/21/2023
B2 Engineering5433208/16/2022
Gilsanz Murray Steficek240105/04/2022
Katz Engineering238104/21/2022
Building Lifecycle
All (116)Filed (11)Permit Issued (13)Signed Off (7)Facade (FISP) (3)Violation (60)Inspection (6)Objection (2)Special Inspection (14)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, closed)
A
04/30/2025
Permit issued — Sidewalk Shed
M01216541-I1-SF
04/30/2025
Permit issued — Sidewalk Shed
M01216541-I1-SH
04/29/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING, HEAVY DUTY SIDEWALK SHED, AND ROOF PROTECTION AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01216541-I1
04/25/2024
Signed off — Alteration
INSTALL 4 NEW HVAC OUTDOOR UNITS ON ROOF, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00915512-I1
04/01/2024
Violation issued (HPD, closed)
A
02/15/2024
Cycle 9 facade report submitted
02/15/2024
Cycle 9 facade report signed — SWARMP
02/02/2024
Cycle 9 facade inspection completed
01/08/2024
Permit issued — Mechanical Systems
M00915512-I1-MS
11/15/2023
Violation issued (HPD, closed)
I
10/13/2023
Signed off — Alteration
Installation of new support beam below existing deck and new offset posts. Structural work. No change in use, occupancy or egress.
M00719365-I1
09/26/2023
Permit issued — Mechanical Systems
M00915512-I1-MS
09/21/2023
Filed — Alteration
INSTALL 4 NEW HVAC OUTDOOR UNITS ON ROOF, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00915512-I1
09/21/2023
Special inspection requirement — Maintenance information
ANDREW GOODRICH
09/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ANDREW GOODRICH
09/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
ANDREW GOODRICH
09/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
ANDREW GOODRICH
09/21/2023
Special inspection requirement — Lighting in dwelling units
ANDREW GOODRICH
08/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
ANDREW GOODRICH
08/07/2023
Special inspection requirement — Mechanical Systems
ANDREW GOODRICH
08/07/2023
Special inspection requirement — Final
ANDREW GOODRICH
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/2023
Signed off — Alteration
M00719025-I1
05/02/2023
Signed off — Alteration
Installation, replacement and relocation of plumbing fixtures on the 6th, 7th floor and roof. Plumbing work. No change in use, occupancy or egress.
M00719116-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2023
Signed off — Alteration
M00719304-I1
04/11/2023
Permit issued — Mechanical Systems
M00719304-I1-MS
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/21/2023
Signed off — Alteration
Installation of sprinkler heads on the 7th floor of existing apartment PHA. Sprinkler work. No change in use, occupancy or egress.
M00789931-I1
03/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/15/2023
Filed — Alteration
Installation, replacement and relocation of plumbing fixtures on the 6th, 7th floor and roof. Plumbing work. No change in use, occupancy or egress.
M00719116-P3
02/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/19/2023
Permit issued — Plumbing
M00719116-I1-PL
01/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2022
Objection raised — Scope
11/28/2022
Objection resolved — Addressed
11/23/2022
Filed — Alteration
Installation, replacement and relocation of plumbing fixtures on the 6th, 7th floor and roof. Plumbing work. No change in use, occupancy or egress.
M00719116-P2
11/01/2022
Permit issued — Sprinklers
M00789931-I1-EW-SP
10/20/2022
Permit issued — Structural
M00719365-I1-ST
09/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/16/2022
Filed — Alteration
Installation of sprinkler heads on the 7th floor of existing apartment PHA. Sprinkler work. No change in use, occupancy or egress.
M00789931-I1
08/16/2022
Filed — Alteration
Installation, replacement and relocation of plumbing fixtures on the 6th, 7th floor and roof. Plumbing work. No change in use, occupancy or egress.
M00719116-P1
07/25/2022
Signed off — Alteration
M00650687-I1
06/07/2022
Permit issued — Supported Scaffold
M00650687-I1-SF
05/24/2022
Permit issued — Plumbing
M00719116-I1-PL
05/19/2022
Filed — Alteration
Installation, replacement and relocation of plumbing fixtures on the 6th, 7th floor and roof. Plumbing work. No change in use, occupancy or egress.
M00719116-I1
05/17/2022
Permit issued — General Construction
M00719025-I1-GC
05/04/2022
Filed — Alteration
Installation of new support beam below existing deck and new offset posts. Structural work. No change in use, occupancy or egress.
M00719365-I1
05/04/2022
Special inspection requirement — Structural Steel - Welding
Gary Steficek
05/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Gary Steficek
05/04/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Gary Steficek
05/04/2022
Special inspection requirement — Structural Steel - Details
Gary Steficek
05/03/2022
Filed — Alteration
M00719304-I1
04/21/2022
Filed — Alteration
M00719025-I1
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedTopline NYC04/30/2025
DOB NOWSidewalk ShedPermit IssuedTopline NYC04/30/2025
DOB NOWMechanical SystemsSigned-offJC HI Tech01/08/2024
DOB NOWMechanical SystemsSigned-offJC HI Tech09/26/2023
DOB NOWMechanical SystemsSigned-offKLDNY04/11/2023
DOB NOWPlumbingSigned-offSuper Plumbers01/19/2023
DOB NOWSprinklersSigned-offOrbit Sprinkler11/01/2022
DOB NOWStructuralSigned-offKLDNY10/20/2022
DOB NOWSupported ScaffoldSigned-offApple Restoration & Water06/07/2022
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp05/24/2022
DOB NOWGeneral ConstructionSigned-offKLDNY05/17/2022
DOB NOWSupported ScaffoldSigned-offApple Restoration & Water02/22/2022
DOB NOWSupported ScaffoldSigned-offApple Restoration & Water12/23/2021
BISOTISSUEDThe Martin Group New York03/13/2023
BISPLISSUEDNew Era Mechanical Services11/29/2017
BISBLISSUEDPeter Miceli Plumbing06/01/2017
BISBLISSUEDPeter Miceli Plumbing03/24/2017
BISBLISSUEDComfort Tech Mechanical02/28/2017
BIS—ISSUEDThe Martin Group New York12/27/2016
BISMHISSUEDThe Martin Group New York12/09/2016
BISOTISSUEDThe Martin Group New York12/09/2016
BISOTISSUEDThe Martin Group New York12/09/2016
BISPLISSUEDNew Era Mechanical Services11/29/2016
BISPLISSUEDNew Era Mechanical Services11/04/2016
BISSDISSUEDAllstate Sprinkler09/26/2016
BISSPISSUEDAllstate Sprinkler09/26/2016
BISSDISSUEDAllstate Sprinkler09/26/2016
BISEQISSUEDSteel Systems09/13/2016
BISEQISSUEDSteel Systems08/25/2016
BISSDISSUEDDPH Plumbing & Heating04/27/2016
BISEQISSUEDPhoenix Sutton STR04/14/2016
BISSPISSUEDVip Fire Sprinkler04/08/2016
BISPLISSUEDDPH Plumbing & Heating04/04/2016
BISEQISSUEDSteel Systems12/28/2015
BISEQISSUEDSteel Systems12/07/2015
BISSDISSUEDTW Plumbing & Heating12/04/2015
BISOTISSUEDThe Martin Group New York12/04/2015
BIS—ISSUEDThe Martin Group New York12/04/2015
BISMHISSUEDThe Martin Group New York12/04/2015
BISOTISSUEDThe Martin Group New York12/04/2015
+ 23 more permits on file
6 projects · most recent 05/07/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
05/07/2025Permit IssuedRichard Neu—
10/12/2023CompleteR & T Electrical—
10/02/2023CompleteA Electrical Main ServiceHVAC Wiring
04/02/2023CompleteCavan ElectricGeneral Wiring
03/02/2023CompleteTop Notch ElectricGeneral Wiring
11/25/2019CompleteMontgomery Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
09/21/2023Maintenance informationANDREW GOODRICHenergy_progress
09/21/2023HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
09/21/2023HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
09/21/2023HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
09/21/2023Lighting in dwelling unitsANDREW GOODRICHenergy_progress
08/31/2023Tenant Protection Plan ComplianceANDREW GOODRICHspecial
08/07/2023Mechanical SystemsANDREW GOODRICHspecial
08/07/2023FinalANDREW GOODRICHprogress
05/04/2022Structural Steel - WeldingGary Steficekspecial
05/04/2022Structural Stability – Alterations of existing buildingsGary Steficekspecial
05/04/2022Structural Steel - High Strength BoltingGary Steficekspecial
05/04/2022Structural Steel - DetailsGary Steficekspecial
04/14/2022FinalGary Steficekprogress
12/20/2021FinalKarol Zdancewiczprogress
▾Documents — 593 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026M00719025-I1Request digital key ↗
09/02/2026M00719304-I1Request digital key ↗
09/02/2026M00719365-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits127
▸BISPLAN / WORK APPROVAL APPLICATION62
07/16/2024121998188Open ↗
01/23/2023121519589Open ↗
01/23/2023122563859Open ↗
Showing 3 of 62 on file for this type
▸BISWORK PERMIT APPLICATION53
03/13/2023122068350Open ↗
06/09/2017140605502Open ↗
Showing 2 of 53 on file for this type
▸DOB NOWLPC Approval/Permit8
08/13/2026M00719116-I1Open ↗
08/13/2026M00719116-P3Open ↗
08/13/2026M00719304-I1Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS2
08/19/2024121998188Open ↗
06/11/2024122563859Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
11/04/2022121519589Open ↗
▸Seals & Professional Certifications109
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION52
06/19/2018121519589Open ↗
06/19/2018121519589Open ↗
06/19/2018121519589Open ↗
Showing 3 of 52 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026M00719025-I1Open ↗
09/02/2026M00719304-I1Open ↗
08/31/2026M00719116-P3Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M00650687-I1Open ↗
09/01/2026M00719365-I1Open ↗
08/27/2026M00915512-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00719365-I1Open ↗
09/01/2026M00719365-I1Open ↗
09/01/2026M00719365-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment32
▸BISEQUIPMENT USE PERMITS10
02/09/2018140303767Open ↗
02/09/2018140303767Open ↗
02/09/2018140303767Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
08/11/2017140303767Open ↗
08/10/2017140303767Open ↗
Showing 2 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
02/09/2018140303767Open ↗
10/31/2017140303767Open ↗
10/31/2017140303767Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
07/09/2018122003438Open ↗
04/17/2018121519589Open ↗
Showing 2 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection7
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSTREET TREE SIGNOFF1
04/15/2024121519589Open ↗
▸Environmental & Asbestos19
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
06/19/2018121519589Open ↗
08/03/2017140605502Open ↗
07/06/2017140303767Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
06/19/2018121519589Open ↗
04/09/2018140605502Open ↗
02/09/2018140303767Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION4
06/19/2018121519589Open ↗
06/19/2018121519589Open ↗
06/19/2018121519589Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/08/2018121519589Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT2
08/19/2024121998188Open ↗
06/11/2024122563859Open ↗
▸BISBPP: FIELD INSPECTION2
08/19/2024121998188Open ↗
06/11/2024122563859Open ↗
▸Approvals, Objections & Sign-offs103
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST43
01/31/2025121998188Open ↗
09/20/2024122563859Open ↗
03/13/2023122068350Open ↗
Showing 3 of 43 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION23
06/19/2018121519589Open ↗
04/09/2018140605502Open ↗
02/09/2018140303767Open ↗
Showing 3 of 23 on file for this type
▸BISLANDMARKS APPROVAL16
06/19/2018121519589Open ↗
02/09/2018140303767Open ↗
05/09/2017121956473Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE8
04/06/2018121519589Open ↗
03/15/2018121519589Open ↗
02/07/2018121519589Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS SIGNOFF3
04/18/2024121998188Open ↗
09/21/2023121519589Open ↗
05/09/2017122426678Open ↗
▸BISBPP: FINAL SIGNOFF2
01/31/2025121998188Open ↗
09/20/2024122563859Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT29
08/14/2018122003438Open ↗
06/19/2018121519589Open ↗
04/09/2018140605502Open ↗
Showing 3 of 29 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP: ENGINEERS AFFIDAVIT2
08/19/2024121998188Open ↗
06/11/2024122563859Open ↗
▸Filing & Intake Forms80
▸BISEFILING COVER SHEET25
08/24/2018123559363Open ↗
Showing 1 of 25 on file for this type
▸BISADDITIONAL INFORMATION24
08/27/2018123559363Open ↗
08/27/2018123559363Open ↗
09/13/2017122563859Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM23
03/02/2020121519589Open ↗
12/18/2019121519589Open ↗
10/03/2019121519589Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building6
08/13/2026M00719116-I1Open ↗
08/13/2026M00719116-P1Open ↗
08/13/2026M00719116-P2Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
08/27/2018121519589Open ↗
08/27/2018123559363Open ↗
09/13/2017122563859Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-PARKS: PLANT NEW TREE2
09/20/2024122563859Open ↗
08/19/2024121998188Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS2
08/19/2024121998188Open ↗
06/11/2024122563859Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type