← Back
Office with commercial, 1-6 stories
6 EAST 46 STREET
MANHATTAN · BIN 1035399
💬 Discuss this project
1948Year Built
6Stories
O5Building Class
C5-2.5Zoning
22,350 sfGross Floor Area
7Units
2 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: 6 EAST 46 · 4,083 sf lot · 5.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction16p · 2 filings · 20 docs
Floor 1Under Construction1 filing · 12 docs
2 jobs · most recent 05/08/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026Permit IssuedPOLAR MECHANICAL CORPHeating and Air Conditioning Systems
Heat / Cool
Samsung AM060FCMDCG/AA 66,000 BTU · Vrf Outdoor ×2
AM060FEZDCG/AA 66,000 BTU · Vrf Outdoor ×2
03/12/2022——Air Conditioning Systems
Cooling
Daikin DAT09043A 90,000 BTU · Fan Coil Indoor ×1
2 jobs · most recent 09/16/2026
Water/Sanitary
FiledStatusContractorScope
09/16/2026Permit IssuedAMERICAN STANDARD P&H CORWater/Sanitary
06/24/2022Signed-offP.S.I. MECHANICALWater/Sanitary
1 job · most recent 11/30/2022
General Wiring
FiledStatusContractorScope
11/30/2022CompleteP & Z ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (60)Filed (6)Permit Issued (5)Violation (17)Inspection (2)Special Inspection (30)
09/21/2026
Permit issued — Plumbing
M01459449-S1-PL
09/18/2026
Permit issued — General Construction
M01459449-I1-GC
09/16/2026
Filed — Alteration
PROPOSED PLUMBING WORK AS PER PLANS AT EXISTING FIRST FLOOR COMMERCIAL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01459449-I1
09/14/2026
Special inspection requirement — Interior lighting power
Yuxuan Liu
09/14/2026
Special inspection requirement — Final
Yuxuan Liu
09/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Yuxuan Liu
09/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Yuxuan Liu
09/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yuxuan Liu
05/08/2026
Filed — Alteration
Ventilation work, HVAC units installation and duct distribution as per plans filed herewith. No change to use, egress or occupancy.
M00752427-P1
05/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
05/08/2026
Special inspection requirement — Mechanical Systems
JACK GREEN
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
05/08/2026
Special inspection requirement — Final
JACK GREEN
05/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/08/2026
Special inspection requirement — Maintenance information
04/06/2026
Special inspection requirement — Final
JACK GREEN
04/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/06/2026
Special inspection requirement — Maintenance information
04/06/2026
Special inspection requirement — Mechanical Systems
JACK GREEN
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
03/27/2026
Permit issued — Mechanical Systems
M00752427-I1-MS
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/21/2022
Permit issued — Plumbing
M00752425-I1-PL
11/17/2022
Permit issued — General Construction
M00752417-I1-GC
06/24/2022
Filed — Alteration
Ventilation work, HVAC units installation and duct distribution as per plans filed herewith. No change to use, egress or occupancy.
M00752427-I1
06/24/2022
Filed — Alteration
Installation of plumbing fixtures as per plans filed herewith.
M00752425-I1
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
06/21/2022
Filed — Alteration
M00752417-I1
06/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
06/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
JACK GREEN
06/09/2022
Special inspection requirement — Final
Frank Loffredo
03/12/2022
Filed — Alteration
Installation of mechanical units as per plans filed herewith, no change to use, egress or occupancy.
M00681661-I1
03/02/2022
Special inspection requirement — Maintenance information
Balser Richard
03/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Balser Richard
03/02/2022
Special inspection requirement — Energy Code Compliance Inspections
03/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
Balser Richard
03/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Balser Richard
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/28/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/08/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/21/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/07/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/19/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/04/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/08/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/19/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/1997
Violation issued (ECB, closed)
Construction
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VKW DESIGN309/23/2026
6 EAST 46503/22/2026
METROPOLITAN LIFE INS. CO103/22/2026
SILK & HALPERN REALTY103/21/2026
6 E 46 LLC C O NATIONWIDE MGMT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VKW DESIGN INC109/16/2026
JACK STONE ENGINEERS, PC405/08/2026
LOFFREDO BROOKS ARCHITECTS P.C.106/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIK RENOVATION INCGeneral Contractor303/21/2026
PARISI, DINOElectrical103/21/2026
NYC TRANSITElectrical103/21/2026
POLAR MECHANICAL CORPGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing109/22/2026
P.S.I. MECHANICALPlumbing107/08/2026
CUBE BUILD GROUPSGeneral Contractor109/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422405/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.09/21/2026
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILD GROUPS INC09/18/2026
DOB NOWMechanical SystemsPermit IssuedPOLAR MECHANICAL CORP03/27/2026
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL11/21/2022
DOB NOWGeneral ConstructionPermit IssuedAIK RENOVATION INC11/17/2022
BISOTISSUEDSUMMIT INTERIORS, INC09/04/2018
BISMHISSUEDERS SYSTEMS INC07/02/2018
BISMHISSUEDCOCOZZA GROUP LLC05/31/2017
BISOTISSUEDCOCOZZA GROUP LLC09/15/2016
BISMHISSUEDERS SYSTEMS INC09/15/2006
BISPLISSUEDPINNACLE PLBG & HTG CORP06/09/2006
BISMHISSUEDMICHELLE KUO CORP05/23/2006
BISMHISSUEDSILVER RAIL ASSOC INC06/22/2005
BISOTISSUEDSILVER RAIL ASSOC INC06/22/2005
BISMHISSUEDCONCEPT AIR CONDITIONING02/12/2004
BIS—ISSUEDCHIN ARCHIT,07/14/2003
BISOTISSUEDICON INTERIORS INC04/28/2003
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP11/28/2001
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR11/28/2001
BISMHISSUEDONE KEY CONSTRUCTION MNGNT * GEN11/16/2001
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
09/14/2026Interior lighting powerYuxuan Liuenergy_progress
09/14/2026FinalYuxuan Liuprogress
09/14/2026Fire-Resistance Rated ConstructionYuxuan Liuprogress
09/14/2026Energy Code Compliance InspectionsYuxuan Liuprogress
09/14/2026Fire-Resistant Penetrations and JointsYuxuan Liuspecial
05/08/2026Duct leakage testing, insulation and design—energy_progress
05/08/2026HVAC-R and service water heating system controls—energy_progress
05/08/2026HVAC-R and service water piping design and insulationJACK GREENenergy_progress
05/08/2026Mechanical SystemsJACK GREENspecial
05/08/2026Energy Code Compliance InspectionsJACK GREENprogress
05/08/2026FinalJACK GREENprogress
05/08/2026HVAC-R and service water heating equipment—energy_progress
05/08/2026Maintenance information—energy_progress
04/06/2026FinalJACK GREENprogress
04/06/2026Duct leakage testing, insulation and design—energy_progress
04/06/2026HVAC-R and service water piping design and insulationJACK GREENenergy_progress
04/06/2026HVAC-R and service water heating system controls—energy_progress
04/06/2026HVAC-R and service water heating equipment—energy_progress
04/06/2026Maintenance information—energy_progress
04/06/2026Mechanical SystemsJACK GREENspecial
04/06/2026Energy Code Compliance InspectionsJACK GREENprogress
06/22/2022Fire-Resistant Penetrations and JointsJACK GREENspecial
06/18/2022Fire-Resistant Penetrations and JointsJACK GREENspecial
06/18/2022Fire-Resistance Rated ConstructionJACK GREENprogress
06/09/2022FinalFrank Loffredoprogress
Latest 25 of 32.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/23/2026M01459449-I1Request digital key ↗
09/23/2026M01459449-S1Request digital key ↗
09/02/2026M00681661-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
06/05/2017123058163Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
09/05/2018123401327Open ↗
07/02/2018123586510Open ↗
06/05/2017123058163Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M01459449-S1Open ↗
09/23/2026M01459449-S1Open ↗
09/23/2026M01459449-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
02/08/2018123058163Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/19/2026M01459449-I1Open ↗
09/19/2026M01459449-S1Open ↗
09/02/2026M00752425-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M01459449-S1Open ↗
09/23/2026M01459449-I1Open ↗
09/02/2026M00752417-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
06/05/2017123058163Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
06/05/2017123058163Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸BISEQUIPMENT USE PERMITS3
02/02/2018123058163Open ↗
02/02/2018123058163Open ↗
02/02/2018123058163Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/15/2018123401327Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/02/2018123058163Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/19/2026M01459449-I1Open ↗
09/19/2026M01459449-S1Open ↗
09/02/2026M00752425-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
09/27/2016122886001Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
02/08/2018123058163Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/08/2018123058163Open ↗
05/22/2017122886001Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/08/2018123058163Open ↗
05/22/2017122886001Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
02/08/2018123058163Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
08/15/2018123401327Open ↗
06/11/2018123586510Open ↗
06/05/2017123058163Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
02/08/2018123058163Open ↗
▸BISADDITIONAL INFORMATION1
10/25/2016122886001Open ↗