ECB07/09/2025ATOI OBSERVED NO ACTIVE CONSTRUCTION IS ON GOING AT THE PROPERTY. HOWEVER, NOTICED THROUGH THE GLASS DOOR GUT RENOVATED THE ENTIRE 1ST FLOOR OF THE PROPERTY. INSTALLED NEW 2X4 FRAMINGS FOR THE NEW PARTITION WAL$2K due
ECB07/09/2025ATOI AT 9:00 AM OBSERVED ELECTRICAL WORK BEING DONE IN THE PROPERTY. BRAND NEW LIGHT FIXTURES WERE INSTALLED AT THE CEILING. AND NEW BX WIRES AND BOXES INSTALLED AT THE CELLAR AS WELL. ALSO NOTICED A NEW AC UNI$2K due
ECB07/09/2025ATOI OBSERVED NO ACTIVE CONSTRUCTION IS IN PROGRESS AT THE PROPERTY. HOWEVER, NOTICED A PLUMBING WORK AT THE CELLAR LEVEL. CAST IRON PIPE NOTICED LAYING DOWN THE GROUND. APPEARS TO BE A NEW BOILER WAS NEWLY INS$2K due
ECB07/09/2025ATOI OBSERVED NO ACTIVE CONSTRUCTION IS IN PROGRESS. NOTICED THEY DEMOED THE OLD PARTITION WALLS AND ERECTED A NEW 2X4 WOOD FRAMING AS A NEW PARTITION WALL IN THE PROPERTY. DEMOLITION WORK IS 100% COMPLETE. NO$5K due
Two stories - detached, small or mid-size · 3,600 sf lot · 0.52 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.