← Back
Zoned commercial or Manhattan residential
6 HAVEMEYER STREET
BROOKLYN · BIN 3061847
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M1-2/R6AZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: 6 HAVEMEYER STREET LLC · 1,676 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction41p · 7 filings · 20 docs
Floor 71p · 1 filing
Floor 6Under Construction16p · 4 filings · 12 docs
Floor 5Under Construction79p · 6 filings · 20 docs
Floor 4Under Construction86p · 6 filings · 20 docs
Floor 3Under Construction85p · 6 filings · 20 docs
Floor 2Under Construction80p · 6 filings · 20 docs
Floor 1Under Construction85p · 7 filings · 20 docs
MezzanineUnder Construction46p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOSKO REALTY1007/08/2026
6 HAVEMEYER1604/09/2026
HKS CONSTRUCTION CORP503/22/2026
6 HAVEMEYER STREET LLC203/22/2026
G S CONSTRUCTION203/22/2026
SUCCESS DEVELOPERS103/22/2026
6-8 HAVEMEYER REALTY1503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/20/2017$1.9M—Private party → 6-8 HAVEMEYER REALTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC1203/21/2026
ONE OF THE BEST, LLC203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
JAM CONSULTANTS, INC.203/21/2026
Rigid Structural Design, LLC203/21/2026
6 HAVEMEYER203/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUCCESS DEVELOPERS LLCGeneral Contractor1008/06/2026
CS BRIDGE CORPGeneral Contractor907/08/2026
PATOMA INCGeneral Contractor507/08/2026
HKS CONSTRUCTION CORPGeneral Contractor303/21/2026
TOVIA WERZBERGERElectrical203/21/2026
ARIEL SERVICES INCPlumbing107/08/2026
METFLOW FIRE CONTROL LLCFire Protection107/08/2026
BUSKO REALTY CORPGeneral Contractor107/08/2026
NOEL NASHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161205/12/2026
Building Lifecycle
All (172)Filed (23)Permit Issued (23)Signed Off (2)Violation (7)Inspection (10)Objection (77)Special Inspection (30)
08/26/2026
Signed off — Alteration
SOE FILED IN CONJUNCTION WITH NB #B00637089-I1.
B01052495-I1
08/05/2026
Permit issued — Structural
B00637089-S7-ST
07/20/2026
Permit issued — Mechanical Systems
B01057434-I1-MS
07/01/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/29/2026
Objection resolved — Addressed
06/17/2026
Objection raised — Scope
06/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/09/2026
Permit issued — General Construction
B00637089-I1-GC
06/01/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/22/2026
Objection raised — Scope
05/12/2026
Filed — New Building
SPRINKLER WORK TYPE FILED IN CONJUNCTION WITH NB #B00637089-I1
B00637089-P3
05/12/2026
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/07/2026
Filed — New Building
SPRINKLER WORK TYPE FILED IN CONJUNCTION WITH NB #B00637089-I1
B00637089-S7
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/07/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FAHAD FATEH
05/06/2026
Special inspection requirement — Final
FAHAD FATEH
04/07/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/07/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/07/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/07/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/07/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
04/07/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
04/07/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/07/2026
Special inspection requirement — Metering
FAHAD FATEH
04/07/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/07/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/07/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/20/2026
Objection raised — Scope
03/20/2026
Objection raised — Zoning
03/05/2026
Filed — New Building
SPRINKLER WORK TYPE FILED IN CONJUNCTION WITH NB #B00637089-I1
B00637089-P2
03/04/2026
Special inspection requirement — Insulation placement and R values
03/04/2026
Special inspection requirement — Exterior lighting power
03/04/2026
Special inspection requirement — Protection of exposed foundation insulation
03/04/2026
Special inspection requirement — Lighting in dwelling units
03/04/2026
Special inspection requirement — Maintenance information
03/04/2026
Special inspection requirement — Interior lighting power
03/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
02/04/2026
Permit issued — Protection and Mechanical Methods
B01183640-I1-PMM
02/03/2026
Objection resolved — Addressed
01/29/2026
Permit issued — Supported Scaffold
B01183540-I1-SF
01/26/2026
Objection raised — Scope
01/23/2026
Permit issued — Sidewalk Shed
B01183520-I1-SH
01/13/2026
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01183520-P1
01/13/2026
Objection resolved — Resolved
01/09/2026
Filed — New Building
SPRINKLER WORK TYPE FILED IN CONJUNCTION WITH NB #B00637089-I1
B00637089-P1
12/30/2025
Violation issued (ECB, closed)
Construction
12/15/2025
Permit issued — Construction Fence
B00635060-I1-FN
12/15/2025
Permit issued — Support of Excavation
B01052495-I1-SE
12/03/2025
Objection resolved — Resolved
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSUCCESS DEVELOPERS LLC08/05/2026
DOB NOWMechanical SystemsPermit IssuedSUCCESS DEVELOPERS LLC07/20/2026
DOB NOWGeneral ConstructionPermit IssuedSUCCESS DEVELOPERS LLC06/09/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCS BRIDGE CORP02/04/2026
DOB NOWSupported ScaffoldPermit IssuedCS BRIDGE CORP01/29/2026
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP01/23/2026
DOB NOWConstruction FencePermit IssuedSUCCESS DEVELOPERS LLC12/15/2025
DOB NOWSupport of ExcavationSigned-offSUCCESS DEVELOPERS LLC12/15/2025
DOB NOWFoundationPermit IssuedSUCCESS DEVELOPERS LLC11/03/2025
DOB NOWStructuralPermit IssuedSUCCESS DEVELOPERS LLC08/12/2025
DOB NOWSupported ScaffoldPermit IssuedCS BRIDGE CORP02/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCS BRIDGE CORP02/24/2025
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP02/21/2025
DOB NOWPlumbingPermit IssuedDG MECHANICAL HEATING INC02/18/2025
DOB NOWSprinklersPermit IssuedMETFLOW FIRE CONTROL LLC02/14/2025
DOB NOWSupport of ExcavationSigned-offSUCCESS DEVELOPERS LLC12/13/2024
DOB NOWConstruction FencePermit IssuedSUCCESS DEVELOPERS LLC12/10/2024
DOB NOWFoundationPermit IssuedSUCCESS DEVELOPERS LLC10/29/2024
DOB NOWConstruction FencePermit IssuedPATOMA INC02/08/2024
DOB NOWConstruction FencePermit IssuedPATOMA INC02/06/2023
DOB NOWConstruction FencePermit IssuedPATOMA INC09/07/2022
DOB NOWConstruction FencePermit IssuedBUSKO REALTY CORP11/30/2021
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP03/22/2018
BISEQISSUEDG & S CONSTRUCTION INC02/23/2018
BIS—ISSUEDG & S CONSTRUCTION INC02/23/2018
1 project · most recent 05/12/2026
Sprinkler System
FiledStatusContractorScope
05/12/2026Permit IssuedMETFLOW FIRE CONTROL LLCSprinkler System
4 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
03/25/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
03/03/2025Permit IssuedNASH ELECTRIC SERVICES IN—
03/19/2018Complete4000 ELECTRIC CORP—
4 projects · most recent 05/12/2026
Concrete Steel
FiledStatusContractorScope
05/12/2026Permit IssuedSUCCESS DEVELOPERS LLCConcrete
07/17/2025Permit IssuedSUCCESS DEVELOPERS LLC1 scope_items
05/20/2024Signed-offSUCCESS DEVELOPERS LLC1 scope_items
10/24/2022Permit IssuedSUCCESS DEVELOPERS LLCSteel, Concrete
1 project · most recent 01/13/2026
Sidewalk Shed
FiledStatusContractorScope
01/13/2026Permit IssuedCS BRIDGE CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/01/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/01/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/20/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/20/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/26/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
05/12/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/12/2026Sprinkler SystemsFAHAD FATEHspecial
05/07/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/07/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FAHAD FATEHspecial
05/06/2026FinalFAHAD FATEHprogress
04/07/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/07/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/07/2026Exterior lighting powerFAHAD FATEHenergy_progress
04/07/2026Lighting controlsFAHAD FATEHenergy_progress
04/07/2026MeteringFAHAD FATEHenergy_progress
04/07/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/07/2026Fenestration areasFAHAD FATEHenergy_progress
04/07/2026Maintenance informationFAHAD FATEHenergy_progress
04/07/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/07/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/07/2026Interior lighting powerFAHAD FATEHenergy_progress
04/07/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/07/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/07/2026Fenestration air leakageFAHAD FATEHenergy_progress
04/07/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/04/2026Lighting controls—energy_progress
03/04/2026Maintenance information—energy_progress
03/04/2026Exterior lighting power—energy_progress
03/04/2026Insulation placement and R values—energy_progress
03/04/2026Lighting in dwelling units—energy_progress
Latest 25 of 98.
▾Documents — 182 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch22
09/03/2026B00025500-I1Request digital key ↗
08/31/2026B00635060-I1Request digital key ↗
08/27/2026B00805686-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00191110-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION8
05/30/2024340911044Open ↗
11/14/2019321564080Open ↗
09/11/2019321564080Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/29/2018321619977Open ↗
01/29/2018321619977Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026B00998736-I1Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026B00637089-I1Open ↗
08/15/2026B00637089-P2Open ↗
08/13/2026B00637089-P2Open ↗
Showing 3 of 5 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
09/04/2019321564080Open ↗
09/04/2019321564080Open ↗
12/13/2017321564080Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00637089-P2Open ↗
08/13/2026B00637089-P1Open ↗
08/13/2026B00637089-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00637089-P2Open ↗
08/13/2026B00637089-P1Open ↗
08/13/2026B00637089-I1Open ↗
▸BISZONING DIAGRAM1
10/29/2019321564080Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/09/2019321564080Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00637089-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026B00025500-I1Open ↗
08/31/2026B00635060-I1Open ↗
08/27/2026B00805686-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B01052495-I1Open ↗
09/02/2026B01052495-I1Open ↗
09/02/2026B01052495-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026B01057434-I1Open ↗
08/28/2026B01057434-I1Open ↗
08/26/2026B00637089-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/02/2019321974191Open ↗
05/17/2018321629056Open ↗
03/16/2018321564080Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/30/2024340911044Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/02/2019321974191Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/02/2019321974191Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/15/2019321564080Open ↗
07/02/2019321974191Open ↗
12/13/2017321564080Open ↗
▸BISGAS CUT-OFF1
02/26/2018321629056Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
02/26/2018321629056Open ↗
▸BISWATER CUT-OFF1
02/26/2018321629056Open ↗
▸BISELECTRIC CUT-OFF1
02/26/2018321629056Open ↗
▸Safety & Tenant Protection20
▸BISANTI-HARASSMENT CHECKLIST4
07/02/2019321974191Open ↗
02/26/2018321629056Open ↗
12/13/2017321564080Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist3
08/17/2026B00637089-I1Open ↗
08/15/2026B00637089-P1Open ↗
08/15/2026B00637089-P2Open ↗
▸DOB NOWHPD-1: Anti-Harassment Area Checklist3
08/13/2026B00025500-I1Open ↗
08/13/2026B00635060-I1Open ↗
08/13/2026B00191110-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
02/26/2018321629056Open ↗
07/27/2017321629056Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
02/26/2018321629056Open ↗
02/26/2018321629056Open ↗
▸BISTenant Protection Plan and Notes2
07/02/2019321974191Open ↗
12/13/2017321564080Open ↗
▸BISSTREET TREE CHECKLIST2
01/29/2018321619977Open ↗
12/13/2017321564080Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/04/2019321564080Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B00637089-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/26/2018321629056Open ↗
07/27/2017321629056Open ↗
▸BISRODENT CONTROL1
02/26/2018321629056Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/07/2020321564080Open ↗
12/13/2017321564080Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/30/2024340911044Open ↗
▸Inspections & Test Reports4
▸DOB NOWSoil Report2
08/13/2026B01019301-I1Open ↗
08/13/2026B01052495-I1Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/16/2018321564080Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01052495-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE3
09/11/2019321564080Open ↗
08/15/2019321564080Open ↗
12/13/2017321564080Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/19/2019321564080Open ↗
07/09/2019321564080Open ↗
▸BISLANDMARKS APPROVAL1
02/26/2018321629056Open ↗
▸BISACPE Objection Review Request1
01/07/2020321564080Open ↗
▸Cost, Insurance & Ownership3
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
02/26/2018321629056Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/26/2018321629056Open ↗
▸BISCOST AFFIDAVIT1
07/02/2019321974191Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
07/03/2019321974191Open ↗
03/16/2018321564080Open ↗
01/25/2018321619977Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
12/05/2019321564080Open ↗
11/19/2019321564080Open ↗
11/19/2019321564080Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/30/2024340911044Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial4
08/13/2026B00998736-I1Open ↗
08/13/2026B00637089-P2Open ↗
08/13/2026B00637089-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00998736-I1Open ↗
08/13/2026B00637089-P1Open ↗
08/13/2026B00637089-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/17/2026B00637089-I1Open ↗
08/15/2026B00637089-P1Open ↗
08/15/2026B00637089-P2Open ↗
▸BISPLOT DIAGRAM2
09/04/2019321564080Open ↗
12/13/2017321564080Open ↗
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION1
11/17/2017321629056Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
11/19/2019321564080Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00025500-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026B00025500-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/17/2026B00637089-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026B00025500-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01052495-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00637089-I1Open ↗