← Back
BuildNYC
Two stories - detached, small or mid-size
6 MARGARETTA COURT
STATEN ISLAND · BIN 5010336
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R2Zoning
1,264 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed Interior Alteration and Enlargement1p · 1 filing · 15 docs
Floor 1Proposed Interior Alteration2p · 2 filings · 19 docs
Sub-BasementProposed Interior Alteration1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael Deruvo & Associates Architects405/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Michael Rowe Consulting and Expedit403/21/2026
Michael Deruvo & Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Avid ConstructionGeneral Contractor203/21/2026
Pat McCann P&HPlumbing207/08/2026
Berger Quality ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738203/17/2022
Building Lifecycle
06/02/2023
Signed off — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW 3/4 BATH AND RELOCATE RANGE, DISHWASHER AND RES. SINK AT FIRST FLOOR AND REMOVE 3 FIXTURE BATHROOM AT BASEMENT.
S00566867-I1
05/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW 3/4 BATH AND RELOCATE RANGE, DISHWASHER AND RES. SINK AT FIRST FLOOR AND REMOVE 3 FIXTURE BATHROOM AT BASEMENT.
S00566867-P1
05/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2023
Permit renewed — Plumbing
Renewed without changes
S00566867-I1-PL
30 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPat McCann P&H05/03/2023
DOB NOWPlumbingSigned-offPat McCann P&H02/14/2022
DOB NOWStructuralSigned-offAvid Construction01/03/2022
2 projects · most recent 05/14/2024
General Wiring
FiledStatusContractorScope
05/14/2024Permit IssuedBerger Quality Electrical—
01/24/2022CompleteK-10 ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/26/2022Concrete - Cast-In-Placeanthony santorospecial
04/26/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
04/26/2022Structural Stability – Alterations of existing buildingsanthony santorospecial
04/26/2022Subgrade Inspectionsanthony santorospecial
04/26/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
01/11/2022Energy Code Compliance InspectionsMICHAEL DERUVOprogress
01/11/2022FinalMICHAEL DERUVOprogress
01/11/2022Fire-Resistance Rated ConstructionMICHAEL DERUVOprogress
01/11/2022Structural Wood FrameMICHAEL DERUVOprogress
01/11/2022Fenestration air leakageMICHAEL DERUVOenergy_progress
01/11/2022Fenestration and door U-factor and product ratingsMICHAEL DERUVOenergy_progress
01/11/2022Fenestration areasMICHAEL DERUVOenergy_progress
01/11/2022Air barrier - visual inspectionMICHAEL DERUVOenergy_progress
01/11/2022Insulation placement and R valuesMICHAEL DERUVOenergy_progress
19 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account