← Back
BuildNYC
Three families
6 PAERDEGAT 12 STREET
BROOKLYN · Canarsie · BIN 3227107
💬 Discuss this project
1965Year Built
3Stories
C0Building Class
R5Zoning
3,480 sfGross Floor Area
3Units
Three families · 2,800 sf lot · 1.24 FAR built · Flood zone X500
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof mount solar array installation1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect110/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Voltaic SolaireGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854110/25/2025
Building Lifecycle
04/21/2026
Signed off — Alteration
Installation of PV system on existing roof no change to egress or use of occupancy
B01306738-I1
10/30/2025
Permit issued — Solar
B01306738-I1-SL
10/25/2025
Filed — Alteration
Installation of PV system on existing roof no change to egress or use of occupancy
B01306738-I1
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
10/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offVoltaic Solaire10/30/2025
BIS—ISSUEDSB Construction07/12/2002
2 projects · most recent 12/05/2025
FiledStatusContractorScope
12/05/2025CompleteBerger Quality Electrical Con—
10/12/2025CompleteBerger Quality Electrical Con—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/22/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
10/22/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
10/22/2025Energy Code Compliance InspectionsTOM PETERSENprogress
10/22/2025FinalTOM PETERSENprogress
10/22/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account