← Back
BuildNYC
Elevator apt, fireproof with stores
Stuy Town Peter Cooper Village
6 PETER COOPER ROAD · BIN 1083697
💬 Discuss this project
1947Year Built
15Stories
D6Building Class
R7-2Zoning
3,122,165 sfGross Floor Area
2,498Units
LL97 CoveredRent Stabilized37 Active Violations 36 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: BPP PCV Owner · 828,650 sf lot · 3.77 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLintel and caulking alterations for residential building3p · 1 filing · 12 docs
BulkheadBpp St Owner LLC3p · 2 filings · 20 docs
Floor 15Unit 14F4p · 2 filings · 7 docs
Floor 14
Floor 13Unit 12H6p · 2 filings · 16 docs
Floor 12
Floor 11
Floor 10Unit 9BUnder Construction6p · 1 filing · 12 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorBpp Pcv Owner LLC33p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BPP PCV Owner10910/17/2026
Tishman/Speyer PCVST Management2403/21/2026
Rose Associates Inc Manager2303/21/2026
Metropolitan Life Insurance Co1103/21/2026
Met Life Ins Co203/21/2026
Blackstone Developers103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$1.3B—PCVST-DIL LLC → BPP PCV Owner$431/sf building
06/03/2014$1.1B—— → —$356/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Building Studio Architects709/21/2026
Sandeep Gunnala Engineering210/13/2025
HC Pec406/30/2025
Paul Perdek, Prof. Engineering105/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sandeep Gunnala Engineering403/21/2026
Beam Living703/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Super G ConstructionGeneral Contractor510/03/2026
Niche Waterproofingspecialty_contractor404/09/2026
Metropolitan Life Ins. CoElectrical303/21/2026
Northeast Plumbing & HeatingPlumbing310/17/2026
Millennium Maintenance & ElectricalElectrical303/21/2026
VTL Electric CoElectrical203/21/2026
PJP InstallersScaffold204/09/2026
K & M Electrical Contng IElectrical103/21/2026
Core Scaffold SystemsScaffold107/08/2026
AP Plumbing & HVACPlumbing107/08/2026
Atlas-Acon Electric ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Building Studio Architect592709/21/2026
Sandeep Gunnala Engineering8482410/13/2025
Building Lifecycle
All (134)Filed (16)Permit Issued (13)Signed Off (9)Facade (FISP) (18)Violation (40)Inspection (10)Objection (2)Special Inspection (26)
10/16/2026
Permit issued — Plumbing
M01447028-S1-PL
10/02/2026
Permit issued — General Construction
M01447028-I1-GC
09/21/2026
Filed — Alteration
Plumbing modifications for interior renovation of Apartment 9B on the 10th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
M01447028-S1
09/21/2026
Filed — Alteration
Plumbing modifications for interior renovation of Apartment 9B on the 10th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
M01447028-I1
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
John Field
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
09/21/2026
Special inspection requirement — Lighting in dwelling units
John Field
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
John Field
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
John Field
09/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Field
09/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Field
09/09/2026
Special inspection requirement — Final
John Field
03/20/2026
Cycle 10 facade report submitted
03/20/2026
Cycle 10 facade report signed — SAFE
03/13/2026
Cycle 10 facade inspection completed
12/30/2025
Signed off — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW 11 MASONRY FAADE REPAIR.
M01183710-I1
12/04/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218232-I1
12/04/2025
Signed off — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01223279-I1
12/03/2025
Cycle 9 facade report signed — SAFE
11/03/2025
Signed off — Alteration
M01163870-I1
11/03/2025
Cycle 9 facade report submitted
10/23/2025
Cycle 9 facade inspection completed
10/15/2025
Special inspection requirement — Masonry
Sandeep Gunnala
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
10/15/2025
Special inspection requirement — Final
Sandeep Gunnala
10/13/2025
Filed — Alteration
M01163870-P1
10/02/2025
Special inspection requirement — Final
Sandeep Gunnala
10/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
10/02/2025
Special inspection requirement — Masonry
Sandeep Gunnala
09/29/2025
Violation issued (ECB, closed)
Elevators
09/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01219862-I1
08/18/2025
Signed off — Alteration
Plumbing modifications for interior renovation of Apartment 14F on the 15th floor as shown on drawings filed herewith. OT filed separately under M08038919-I1. No change in use, egress or occupancy.
M08038936-I1
06/30/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218232-P1
06/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/30/2025
Filed — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01223279-P1
05/23/2025
Permit issued — General Construction
M01163870-I1-GC
05/15/2025
Permit issued — Plumbing
M08038936-I1-PL
05/14/2025
Filed — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01223279-I1
05/14/2025
Permit issued — Protection and Mechanical Methods
M01223279-I1-PMM
05/12/2025
Permit issued — General Construction
M01163870-I1-GC
05/05/2025
Permit issued — Suspended Scaffold
M01183710-I1-SC
05/05/2025
Permit issued — Sidewalk Shed
M01219862-I1-SH
05/02/2025
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218232-I1
05/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01219862-I1
05/02/2025
Permit issued — Sidewalk Shed
M01218232-I1-SH
03/27/2025
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
03/20/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW 11 MASONRY FAADE REPAIR.
M01183710-P1
03/17/2025
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
03/03/2025
Objection resolved — Addressed
02/27/2025
Objection raised — Admin
02/26/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW 11 MASONRY FAADE REPAIR.
M01183710-I1
01/26/2025
Filed — Alteration
M01163870-I1
09/24/2024
Violation issued (HPD, closed)
A
07/10/2024
Signed off — Alteration
Plumbing modifications for interior renovation of Apartment 12H on the 13th floor as shown on drawings filed herewith. OT filed separately under M01014753-I1. No change in use, egress or occupancy.
M01014851-I1
07/08/2024
Signed off — Alteration
M01014753-I1
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNortheast Plumbing & Heating10/16/2026
DOB NOWGeneral ConstructionPermit IssuedSuper G Construction10/02/2026
DOB NOWGeneral ConstructionSigned-offNiche Waterproofing05/23/2025
DOB NOWPlumbingSigned-offNortheast Plumbing & Heating05/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offPJP Installers05/14/2025
DOB NOWGeneral ConstructionSigned-offNiche Waterproofing05/12/2025
DOB NOWSuspended ScaffoldSigned-offJC Santana Contracting Co05/05/2025
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/05/2025
DOB NOWSidewalk ShedSigned-offPJP Installers05/02/2025
DOB NOWPlumbingSigned-offNortheast Plumbing & Heating04/03/2024
DOB NOWGeneral ConstructionSigned-offSuper G Construction03/27/2024
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating01/12/2023
DOB NOWGeneral ConstructionSigned-offSuper G Construction11/29/2022
BISOTISSUEDCrre Town and Village09/25/2025
BISOTISSUEDCrre Town and Village09/26/2024
BISOTISSUEDCrre Town and Village09/26/2023
BISOTISSUEDCrre Town and Village09/30/2022
BISOTISSUEDCrre Town and Village10/08/2021
BISOTISSUEDCrre Town and Village09/25/2020
BISOTISSUEDCrre Town and Village06/15/2020
BISOTISSUEDSuper G Construction04/18/2019
BISPLISSUEDPace Plumbing03/22/2019
BISPLISSUEDPace Plumbing03/13/2019
BISPLISSUEDPace Plumbing03/13/2019
BISOTISSUEDSuper G Construction03/05/2019
BISOTISSUEDCVM Construction03/01/2019
BISOTISSUEDCVM Construction02/12/2019
BISPLISSUEDPace Plumbing02/11/2019
BISOTISSUEDCrre Town and Village01/14/2019
BISOTISSUEDCrre Town and Village01/04/2019
BISPLISSUEDPace Plumbing09/04/2018
BISOTISSUEDCrre Town and Village08/22/2018
BISOTISSUEDSolar Energy Systems08/11/2018
BISOTISSUEDCrre Town and Village12/21/2017
BISPLISSUEDPace Plumbing10/16/2017
BISOTISSUEDEmpire Core Group09/22/2017
BISOTISSUEDEmpire Core Group07/24/2017
BISPLISSUEDPace Plumbing07/19/2017
BISOTISSUEDEmpire Core Group07/12/2017
BISPLISSUEDPace Plumbing05/04/2017
+ 23 more permits on file
1 project · most recent 09/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/21/2026Permit IssuedNortheast Plumbing & HeatingGas, Water/Sanitary
21 projects · most recent 08/03/2026
General Wiring Lighting
FiledStatusContractorScope
08/03/2026Permit IssuedElectrical SolutionsGeneral Wiring
04/22/2026Permit IssuedElectrical SolutionsGeneral Wiring
05/10/2025CompleteWCK Electric—
05/08/2025CompleteSolas Electrical—
02/19/2025CompleteGRX Euro Electric—
04/10/2024CompleteElectrical SolutionsGeneral Wiring
09/06/2023CompleteAtlas-Acon Electric Service—
02/14/2023CompleteElectrical SolutionsGeneral Wiring
02/10/2023CompleteElectrical SolutionsGeneral Wiring
11/22/2022CompleteElectrical SolutionsGeneral Wiring
05/09/2022Permit IssuedVertex ElectricGeneral Wiring
10/12/2021CompleteElectrical SolutionsGeneral Wiring
07/22/2021CompleteElectrical SolutionsGeneral Wiring
06/27/2019CompletePower Surge ElectricGeneral Wiring
05/29/2019CompletePower Surge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/21/2026Energy Code Compliance InspectionsJohn Fieldprogress
09/21/2026Fire-Resistant Penetrations and JointsJohn Fieldspecial
09/21/2026Fire-Resistant Penetrations and JointsJohn Fieldspecial
09/21/2026Lighting in dwelling unitsJohn Fieldenergy_progress
09/21/2026HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
09/21/2026Energy Code Compliance InspectionsJohn Fieldprogress
09/21/2026Tenant Protection Plan ComplianceJohn Fieldspecial
09/18/2026Tenant Protection Plan ComplianceJohn Fieldspecial
09/09/2026FinalJohn Fieldprogress
10/15/2025MasonrySandeep Gunnalaspecial
10/15/2025Tenant Protection Plan ComplianceSandeep Gunnalaspecial
10/15/2025FinalSandeep Gunnalaprogress
10/02/2025FinalSandeep Gunnalaprogress
10/02/2025Tenant Protection Plan ComplianceSandeep Gunnalaspecial
10/02/2025MasonrySandeep Gunnalaspecial
03/27/2025Post-installed AnchorsSandeep Gunnalaspecial
03/17/2025Post-installed AnchorsSandeep Gunnalaspecial
06/06/2024Fire-Resistant Penetrations and JointsJohn Fieldspecial
06/06/2024Tenant Protection Plan ComplianceJohn Fieldspecial
06/06/2024Energy Code Compliance InspectionsJohn Fieldprogress
06/06/2024HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
06/04/2024HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
06/04/2024Fire-Resistant Penetrations and JointsJohn Fieldspecial
06/04/2024Tenant Protection Plan Compliance—special
06/04/2024Energy Code Compliance InspectionsJohn Fieldprogress
Latest 25 of 26.
▾Documents — 727 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
10/04/2026M01447028-S1Request digital key ↗
10/04/2026M01447028-I1Request digital key ↗
09/01/2026M08038936-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits130
▸BISPLAN / WORK APPROVAL APPLICATION76
12/31/2019102914802Open ↗
09/12/2019122735273Open ↗
08/21/2019102914802Open ↗
Showing 3 of 76 on file for this type
▸BISWORK PERMIT APPLICATION54
12/23/2019102914802Open ↗
05/01/2019123889006Open ↗
04/19/2019123889006Open ↗
Showing 3 of 54 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE COMPLIANCE1
07/26/2018140774865Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
07/26/2018140774865Open ↗
▸Seals & Professional Certifications200
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
09/13/2019123889006Open ↗
08/28/2019123754945Open ↗
08/13/2019123673471Open ↗
Showing 3 of 83 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST37
04/19/2019123889006Open ↗
03/06/2019123754945Open ↗
03/04/2019123673417Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
10/03/2026M01447028-I1Open ↗
10/03/2026M01447028-S1Open ↗
09/01/2026M08038936-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
04/19/2019123889006Open ↗
03/06/2019123754945Open ↗
03/04/2019123673417Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
10/03/2026M01447028-S1Open ↗
10/03/2026M01447028-I1Open ↗
10/03/2026M01447028-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/03/2026M01447028-I1Open ↗
10/03/2026M01447028-S1Open ↗
10/03/2026M01014851-P1Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/26/2018140774865Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/26/2018140774865Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
05/13/2019123754945Open ↗
05/09/2019123754945Open ↗
04/19/2019123889006Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes9
04/19/2019123889006Open ↗
03/06/2019123754945Open ↗
03/04/2019123673417Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos56
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
03/06/2019123754945Open ↗
03/04/2019123673417Open ↗
02/13/2019123673471Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
10/03/2026M01447028-I1Open ↗
10/03/2026M01447028-S1Open ↗
09/01/2026M08038936-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
09/13/2019123889006Open ↗
08/28/2019123754945Open ↗
08/13/2019123673471Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
07/07/2020122735273Open ↗
09/13/2019123889006Open ↗
08/28/2019123754945Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/07/2020122735273Open ↗
07/26/2018140774865Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/26/2018140774865Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/07/2020122735273Open ↗
07/26/2018140774865Open ↗
07/26/2018140774865Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
03/13/2019140774865Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
07/07/2020122735273Open ↗
09/13/2019123889006Open ↗
08/28/2019123754945Open ↗
Showing 3 of 35 on file for this type
▸BISADMINISTRATIVE OBJECTIONS26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership98
▸BISCOST AFFIDAVIT75
09/13/2019123889006Open ↗
08/28/2019123754945Open ↗
08/13/2019123673471Open ↗
Showing 3 of 75 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/07/2020122735273Open ↗
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET32
04/19/2019123889006Open ↗
03/06/2019123754945Open ↗
03/04/2019123673417Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM20
09/13/2019123889006Open ↗
08/28/2019123754945Open ↗
08/21/2019102914802Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION8
06/27/2019123673417Open ↗
05/13/2019123754945Open ↗
04/19/2019123889006Open ↗
Showing 3 of 8 on file for this type
▸BISeFiling Job Application Cover Sheet5
07/26/2018140774865Open ↗
Showing 1 of 5 on file for this type
▸Other Documents9
▸DOB NOWManufacturer's Specifications3
08/13/2026M01163870-S1Open ↗
08/13/2026M01183710-P1Open ↗
08/13/2026M01183710-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01183710-P1Open ↗
08/13/2026M01183710-I1Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
07/26/2018140774865Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/26/2018140774865Open ↗