ECB07/18/2019AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR WAS NOT FOLLOWING APPROVED PLANS A-002.00. OBSERVED A ROOM THAT WAS BEING BUILT IN THE CELLAR, STEPS GOING TO 1ST FLOOR FROM CELLAR FROM EXP. 3 INTE$6K due
ECB07/18/2019ELECTRICAL WORK WITHOUT A PERMIT. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR WAS DOING ELECTRICAL WORK IN THE CELLAR. OBSERVED OPEN ELECTRICAL PANELS AND NEW WIRING IN NEW ADDITION ROOMS., OB$8K due
ECB07/18/2019WORKING WITHOUT A PERMIT. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE CONTRACTOR WAS DOING PLUMBING WORK IN THE CELLAR WITHOUT A PERMIT., OBTAIN PERMIT$12K due
One story - permanent living quarter · 1,600 sf lot · 0.81 FAR built · Flood zone X