| Owner | Filings | Most Recent |
|---|---|---|
| BROOKDALE HOSPITAL MEDICAL CENTER | 5 | 09/13/2026 |
| HDRG | 5 | 09/13/2026 |
| ROCK GROUP NY | 19 | 07/08/2026 |
| APEX BUILDING | 11 | 04/09/2026 |
| VIK XS SERVICES INC | 5 | 03/22/2026 |
| L M BUILDERS GROUP | 8 | 03/22/2026 |
| PLATINUM SERVICES NY | 1 | 03/22/2026 |
| VBK C1 OWNER LC | 1 | 03/22/2026 |
| STB OWNERS | 2 | 03/21/2026 |
| VBK C1 OWNER | 14 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RICHARD WAINER ARCHITECT, PLLC | 1 | 05/27/2026 |
| COSENTINI ASSOCIATES | 14 | 04/28/2026 |
| DATTNER ARCHITECTS | 1 | 03/31/2026 |
| GREGORY RALPH, ARCHITECT | 2 | 03/25/2026 |
| ANDREW ZAKI | 2 | 03/20/2026 |
| OSPINO ENGINEERING PLLC | 1 | 09/24/2024 |
| FL&M ENGINEERING DESIGN &INSPECTION | 3 | 07/18/2023 |
| TOHFAZ UDDIN PE PC | 4 | 04/12/2023 |
| GACE DPC | 7 | 01/09/2023 |
| ASHRAF CORP | 2 | 11/16/2022 |
| BLUESHORE ENGINEERING LLC | 2 | 10/20/2022 |
| GEODESIGN INC. PC | 2 | 10/12/2022 |
| MEP GEOTHERMAL ENGINEERING, PLLC | 1 | 08/08/2022 |
| STEVEN CAPRI,PE CONSULTING ENGINEER | 2 | 08/04/2022 |
| ANCORA ENGINEERING, PLLC | 2 | 01/07/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| EXPEDITE DEM | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 03/21/2026 |
| DVA Advisors | 21 | 03/21/2026 |
| AO CONSULTING AND DRAFTING | 2 | 03/21/2026 |
| KD DESIGNS | 4 | 03/21/2026 |
| THE GREEN STUDIO | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 4 | 03/21/2026 |
| PLATINUM SERVICES NY | 4 | 03/21/2026 |
| Rigid Structural Design, LLC | 1 | 03/21/2026 |
| MILLENNIUM DESIGNS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| L & M BUILDERS GROUP LLC | General Contractor | 30 | 07/08/2026 |
| ROCK GROUP NY CORP | General Contractor | 6 | 07/08/2026 |
| BLETSAS PLBNG & HTG CORP | Plumbing | 6 | 07/08/2026 |
| BLETSAS PLBNG & HTG CORP | Fire Protection | 6 | 07/08/2026 |
| AURA PLUMBING INC | Fire Protection | 3 | 07/08/2026 |
| MICHELLE KUO CORP | General Contractor | 2 | 04/09/2026 |
| UNITY CONSTR. SVCS INC | General Contractor | 2 | 07/23/2026 |
| VICTORIAN FENCE INC | General Contractor | 2 | 07/08/2026 |
| FDL MANAGEMENT CORP | General Contractor | 2 | 07/08/2026 |
| ANTHONY CERRITO | Electrical | 1 | 03/21/2026 |
| TEE BEE SIGN INST | Scaffold | 1 | 07/08/2026 |
| DIFAZIO ELECTRIC NY, INC | Electrical | 1 | 03/22/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 1 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 1 | 04/09/2026 |
| TRI BOROUGH SCAFFOLDING | General Contractor | 1 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 1 | 07/28/2026 |
| FLINT MECHANICAL CORP | Plumbing | 1 | 07/03/2026 |
| PANILI PLUMBING & HTG LLC | Plumbing | 1 | 07/03/2026 |
| ROCK E SMALL PLBG&HTG INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AMERICAN CONSTRUCTION TES | 9731 | 4 | 04/28/2026 |
| GRA DESIGN STUDIO | 9854 | 1 | 03/25/2026 |
| MJ ENGINEERING & DESIGN | 5546 | 4 | 03/25/2026 |
| VIBRANALYSIS INC., DBA VT | 6864 | 16 | 10/09/2024 |
| GEODESIGN, INC., P.C. | 627 | 4 | 01/09/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | ALLIANCE PLUMBING CORP | 07/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | UNITY CONSTR. SVCS INC | 07/22/2026 |
| DOB NOW | Plumbing | Permit Issued | FLINT MECHANICAL CORP | 07/01/2026 |
| DOB NOW | Sign | Signed-off | L.S. SIGN CO., INC | 06/04/2026 |
| DOB NOW | General Construction | Permit Issued | UNITY CONSTR. SVCS INC | 05/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 05/04/2026 |
| DOB NOW | Plumbing | Permit Issued | ROCK E SMALL PLBG&HTG INC | 04/06/2026 |
| DOB NOW | General Construction | Permit Issued | 18-15 REALTY LLC | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | 18-15 REALTY LLC | 04/01/2026 |
| DOB NOW | Support of Excavation | Permit Issued | L & M BUILDERS GROUP LLC | 05/16/2025 |
| DOB NOW | Sprinklers | Signed-off | AURA PLUMBING INC | 12/31/2024 |
| DOB NOW | Standpipe | Signed-off | AURA PLUMBING INC | 12/31/2024 |
| DOB NOW | Standpipe | Signed-off | AURA PLUMBING INC | 12/31/2024 |
| DOB NOW | Plumbing | Permit Issued | PANILI PLUMBING & HTG LLC | 12/31/2024 |
| DOB NOW | Boiler Equipment | Signed-off | STUART N SCHWARTZ | 10/15/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | VIK XS SERVICES INC | 09/24/2024 |
| DOB NOW | Boiler Equipment | Signed-off | STUART N SCHWARTZ | 08/12/2024 |
| DOB NOW | Standpipe | Signed-off | BLETSAS PLBNG & HTG CORP | 07/16/2024 |
| DOB NOW | Standpipe | Signed-off | BLETSAS PLBNG & HTG CORP | 07/12/2024 |
| DOB NOW | Plumbing | Permit Issued | BLETSAS PLBNG & HTG CORP | 07/12/2024 |
| DOB NOW | Curb Cut | Signed-off | L & M BUILDERS GROUP LLC | 07/02/2024 |
| DOB NOW | Mechanical Systems | Signed-off | L & M BUILDERS GROUP LLC | 05/13/2024 |
| DOB NOW | Mechanical Systems | Signed-off | L & M BUILDERS GROUP LLC | 05/07/2024 |
| DOB NOW | Earth Work | Signed-off | L & M BUILDERS GROUP LLC | 05/07/2024 |
| DOB NOW | Support of Excavation | Permit Issued | L & M BUILDERS GROUP LLC | 05/07/2024 |
| DOB NOW | Construction Fence | Signed-off | L & M BUILDERS GROUP LLC | 05/07/2024 |
| DOB NOW | Foundation | Signed-off | L & M BUILDERS GROUP LLC | 05/07/2024 |
| DOB NOW | Standpipe | Signed-off | BLETSAS PLBNG & HTG CORP | 04/18/2024 |
| DOB NOW | Mechanical Systems | Signed-off | L & M BUILDERS GROUP LLC | 03/11/2024 |
| DOB NOW | Structural | Signed-off | L & M BUILDERS GROUP LLC | 02/12/2024 |
| DOB NOW | Construction Fence | Signed-off | L & M BUILDERS GROUP LLC | 02/07/2024 |
| DOB NOW | Foundation | Signed-off | L & M BUILDERS GROUP LLC | 02/07/2024 |
| DOB NOW | Support of Excavation | Permit Issued | L & M BUILDERS GROUP LLC | 02/07/2024 |
| DOB NOW | Earth Work | Signed-off | L & M BUILDERS GROUP LLC | 02/07/2024 |
| DOB NOW | General Construction | Signed-off | L & M BUILDERS GROUP LLC | 02/07/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ROCK GROUP NY CORP | 09/28/2023 |
| DOB NOW | Sprinklers | Signed-off | BLETSAS PLBNG & HTG CORP | 07/18/2023 |
| DOB NOW | Standpipe | Signed-off | BLETSAS PLBNG & HTG CORP | 07/18/2023 |
| DOB NOW | Plumbing | Permit Issued | BLETSAS PLBNG & HTG CORP | 07/18/2023 |
| DOB NOW | Supported Scaffold | Signed-off | MC SUPERSTRUCTURE INC | 07/10/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/28/2026 | Permit Issued | UNITY CONSTR. SVCS INC | Air Conditioning Systems | — |
| 03/25/2026 | Permit Issued | MICHELLE KUO CORP | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Carrier 50PTH064 2,000 CFM · Ahu ×2 Ventilation Captiveaire A1-D.500-150 1,600 CFM · Makeup Air ×1 |
| 10/09/2024 | Permit Issued | L & M BUILDERS GROUP LLC | Associated Ducts and Piping, Heating and Air Conditioning Systems, Others, Ventilation Systems | Heat / Cool Trane TPVFYP036AM141A 34,838 BTU · Vrf Indoor ×12 TPKA0A0241KA70A 23,732 BTU · Fan Coil Indoor ×9 TRUZA0241HA70NA 23,732 BTU · Condensing Unit ×9 TRUZA0181KA70NA 16,912 BTU · Condensing Unit ×6 TUHYP0963AN40AN 92,267 BTU · Condensing Unit ×6 TPEADA0181AA70A 16,912 BTU · Fan Coil Indoor ×3 TPKFYP018LM140A 18,028 BTU · Vrf Indoor ×3 TPKFYP024KM142A 22,464 BTU · Vrf Indoor ×3 TPLA0A0181EA70B 16,036 BTU · Fan Coil Indoor ×3 Climatemaster TCH-012 9,500 BTU · Heat Pump Outdoor ×3 TEH-026 20,500 BTU · Heat Pump Outdoor ×3 TEH-038 32,400 BTU · Heat Pump Outdoor ×3 TEH-049 40,800 BTU · Heat Pump Outdoor ×3 TSM-09 7,000 BTU · Heat Pump Outdoor ×3 TSM-12 8,900 BTU · Heat Pump Outdoor ×3 TSM-15 10,100 BTU · Heat Pump Outdoor ×3 TSM-18 11,200 BTU · Heat Pump Outdoor ×3 Aaon SA-060 634,250 BTU · Wshp ×3 Ventilation Renewaire HE/LE-XINH 2,020 CFM · Erv ×6 Other N/A N/A 1 BTU · Ductwork ×1 Ducts & Piping N/A N/A Ductwork ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/28/2026 | — | — | Sprinkler System |
| 10/09/2024 | Signed-off | AURA PLUMBING INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/28/2026 | Permit Issued | CARDOZA PLUMBING CORP | Water/Sanitary |
| 10/09/2024 | Permit Issued | BLETSAS P&H CORP | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/13/2026 | Permit Issued | COGEN ELEC'L SERVICES,INC | — |
| 06/16/2026 | Permit Issued | AL-LECTRIC ELECT'L CONTRG | General Wiring |
| 06/11/2026 | Permit Issued | AURORA ELECL CONTG INC | — |
| 04/22/2026 | Permit Issued | EMPIRE LIC ELECL CONTRS | General Wiring |
| 08/21/2025 | Complete | A & R ELEC'L MAINT. INC. | General Wiring |
| 02/11/2025 | Cancelled | AMBER LITE ELECTRIC CORP. | 1 meters, 1 new_meters |
| 08/01/2024 | Complete | SUNKEEPER SOLAR LLC | — |
| 07/22/2024 | Cancelled | A & R ELEC'L MAINT. INC. | General Wiring |
| 06/20/2024 | Cancelled | WINDSOR ELEC CONT'G INC. | General Wiring |
| 03/28/2024 | Complete | A & R ELEC'L MAINT. INC. | 1 meters, 1 new_meters |
| 09/26/2023 | Complete | A & R ELEC'L MAINT. INC. | — |
| 08/11/2023 | Complete | DIFAZIO ELECTRIC NY, INC | General Wiring |
| 08/11/2023 | Complete | DIFAZIO ELECTRIC NY, INC | General Wiring |
| 04/19/2023 | Complete | ILLUMINOUS ELECTRIC CORP. | — |
| 08/22/2022 | Complete | A & R ELEC'L MAINT. INC. | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2024 | Permit Issued | BLETSAS P&H CORP | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/09/2024 | Permit Issued | BLETSAS P&H CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/19/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 07/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/18/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/25/2024 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 11/25/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/22/2024 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 11/21/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/15/2024 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 10/10/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 09/23/2024 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 09/19/2024 | Fail-Final SD - Fire Pump | Fail | View ↗ |
| 08/27/2024 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/27/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/02/2023 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 01/18/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 01/18/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/27/2022 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/27/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/22/2026 | Final | Richard Wainer | progress |
| 03/25/2026 | Maintenance information | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | Metering | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | Electrical motors and elevators | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | Lighting controls | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | Interior lighting power | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | Electrical motors and elevators | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | HVAC-R and service water heating system controls | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | Duct leakage testing, insulation and design | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | Ventilation and air distribution system | EDWIN HOPKINS | energy_progress |
| 03/25/2026 | HVAC-R and service water piping design and insulation | EDWIN HOPKINS | energy_progress |
| 03/24/2026 | Tenant Protection Plan Compliance | EDWIN HOPKINS | special |
| 03/24/2026 | Tenant Protection Plan Compliance | EDWIN HOPKINS | special |
| 03/24/2026 | Tenant Protection Plan Compliance | EDWIN HOPKINS | special |
| 03/20/2026 | Tenant Protection Plan Compliance | Gregory Ralph | special |
| 03/20/2026 | Fire-Resistant Penetrations and Joints | Magdy Youssef | special |
| 03/20/2026 | Sprinkler Systems | Magdy Youssef | special |
| 03/20/2026 | Post-installed Anchors | Magdy Youssef | special |
| 03/19/2026 | Post-installed Anchors | EDWIN HOPKINS | special |
| 03/19/2026 | Fire-Resistant Penetrations and Joints | EDWIN HOPKINS | special |
| 03/19/2026 | HVAC-R and service water heating equipment | EDWIN HOPKINS | energy_progress |
| 03/19/2026 | Tenant Protection Plan Compliance | Magdy Youssef | special |
| 03/19/2026 | Energy Code Compliance Inspections | Magdy Youssef | progress |
| 03/19/2026 | HVAC-R and service water heating equipment | Magdy Youssef | energy_progress |
| 03/19/2026 | HVAC-R and service water piping design and insulation | Magdy Youssef | energy_progress |