← Back
Elevator cooperative
6 WEST 16 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1078648
💬 Discuss this project
1964Year Built
14Stories
D4Building Class
C6-2MZoning
403,741 sfGross Floor Area
483Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: AKAM ASSOCIATES · 45,223 sf lot · 8.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
PenthouseUnder Construction1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES3509/15/2026
KINGS GROUP NY CORP503/22/2026
16 STREET TENANTS303/21/2026
16TH STREET TENANTS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOHFAZ UDDIN PE PC707/17/2026
KN3 ENGINEERING LLC304/13/2026
THOMAS A FENNIMAN ARCHITECT208/01/2025
ROYAL ENGINEERING, P.C110/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPRING SCAFFOLDING LLC803/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor909/15/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
SKYLINE RESTORATION INCGeneral Contractor308/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481304/13/2026
ALAN MARGOLIN & ASSOC423208/01/2025
Building Lifecycle
All (89)Filed (13)Permit Issued (14)Signed Off (1)Facade (FISP) (12)Violation (30)Objection (4)Special Inspection (15)
09/14/2026
Permit issued — Protection and Mechanical Methods
M01233165-S2-PMM
08/20/2026
Permit issued — General Construction
M01230358-I1-GC
08/14/2026
Permit issued — Sidewalk Shed
M01233165-I1-SH
07/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE DEBRIS CHUTE TOP OF THE SIDEWALK SHED TO THE WEST 15TH STREET ELEVATION.
M01233165-P3
07/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE DEBRIS CHUTE TOP OF THE SIDEWALK SHED TO THE WEST 15TH STREET ELEVATION.
M01233165-P2
07/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE DEBRIS CHUTE TOP OF THE SIDEWALK SHED TO THE WEST 15TH STREET ELEVATION.
M01233165-S3
07/07/2026
Permit issued — Construction Fence
M01233165-S3-FN
07/06/2026
Permit issued — Suspended Scaffold
M01236826-I1-SC
06/20/2026
Violation issued (ECB, open)
Construction
06/20/2026
Violation issued (ECB, closed)
Construction
06/03/2026
Permit issued — Supported Scaffold
M01233165-S1-SF
05/28/2026
Permit issued — Sidewalk Shed
M01233165-I1-SH
04/14/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
04/14/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
04/13/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01236826-P2
04/13/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
04/13/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
04/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
03/03/2026
Permit issued — Sidewalk Shed
M01233165-I1-SH
09/24/2025
Permit issued — Protection and Mechanical Methods
M01233165-S2-PMM
09/23/2025
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE DEBRIS CHUTE TOP OF THE SIDEWALK SHED TO THE WEST 15TH STREET ELEVATION.
M01233165-S2
09/17/2025
Permit issued — General Construction
M01230358-I1-GC
08/01/2025
Filed — Alteration
M01263294-I1
07/31/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01236826-P1
07/30/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
07/30/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
07/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
07/01/2025
Permit issued — Suspended Scaffold
M01236826-I1-SC
07/01/2025
Objection resolved — Addressed
06/27/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Other
06/13/2025
Objection raised — Scope
06/10/2025
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE DEBRIS CHUTE TOP OF THE SIDEWALK SHED TO THE WEST 15TH STREET ELEVATION.
M01233165-P1
06/06/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01236826-I1
06/04/2025
Violation issued (HPD, closed)
A
06/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE DEBRIS CHUTE TOP OF THE SIDEWALK SHED TO THE WEST 15TH STREET ELEVATION.
M01233165-S1
06/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE DEBRIS CHUTE TOP OF THE SIDEWALK SHED TO THE WEST 15TH STREET ELEVATION.
M01233165-I1
06/03/2025
Permit issued — Supported Scaffold
M01233165-S1-SF
06/03/2025
Permit issued — Sidewalk Shed
M01233165-I1-SH
05/28/2025
Filed — Alteration
EXTERIOR FACADE REPAIRS & MAINTENANCE, INCLUDING REPLACEMENT OF PARAPET AT ROOF LEVEL. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK.
M01230358-I1
05/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
05/22/2025
Special inspection requirement — Final
Thomas Fenniman
05/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Thomas Fenniman
05/22/2025
Special inspection requirement — Post-installed Anchors
Young Suh
05/22/2025
Special inspection requirement — Masonry
Young Suh
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
11/22/2024
Violation issued (HPD, closed)
I
06/08/2024
Violation issued (HPD, open)
C
05/16/2024
Violation issued (ECB, closed)
Plumbing
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
09/15/2023
Signed off — Alteration
M00086906-I1
03/15/2023
Violation issued (HPD, closed)
A
01/03/2023
Cycle 9 facade report submitted
01/03/2023
Cycle 9 facade report signed — SWARMP
12/29/2022
Cycle 9 facade inspection completed
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC09/14/2026
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC08/20/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC08/14/2026
DOB NOWConstruction FencePermit IssuedSPRING SCAFFOLDING LLC07/07/2026
DOB NOWSuspended ScaffoldPermit IssuedMONROE CONSTRUCTION INC07/06/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC06/03/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC05/28/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC09/24/2025
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC09/17/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC07/01/2025
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC06/03/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC06/03/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/11/2018
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/26/2011
3 projects · most recent 10/07/2025
FiledStatusContractorScope
10/07/2025Permit IssuedJTE ELECTRICAL SERVICES—
06/13/2025Permit IssuedTOP SHELF ELECTRIC CORP—
10/10/2018Permit IssuedMEO ELECTRIC CORP—
1 project · most recent 07/17/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
07/17/2026Permit IssuedSPRING SCAFFOLDING LLCFence, Scaffold, Sidewalk Shed
1 project · most recent 04/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/13/2026Permit IssuedSKYLINE RESTORATION INCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/14/2026Post-installed AnchorsLeo Leespecial
04/14/2026Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/14/2026Structural Stability – Alterations of existing buildingsLeo Leespecial
04/13/2026Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/13/2026Post-installed AnchorsLeo Leespecial
04/13/2026Structural Stability – Alterations of existing buildingsLeo Leespecial
07/30/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
07/30/2025Post-installed AnchorsLeo Leespecial
07/30/2025Structural Stability – Alterations of existing buildingsLeo Leespecial
05/22/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
05/22/2025FinalThomas Fennimanprogress
05/22/2025Energy Code Compliance InspectionsThomas Fennimanprogress
05/22/2025Post-installed AnchorsYoung Suhspecial
05/22/2025MasonryYoung Suhspecial
05/22/2025Tenant Protection Plan ComplianceYoung Suhspecial
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/06/2026M00086906-I1Request digital key ↗
08/23/2026M01230358-I1Request digital key ↗
08/23/2026M01233165-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/27/2011120671772Open ↗
▸BISWORK PERMIT APPLICATION1
04/27/2011120671772Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/06/2026M00086906-I1Open ↗
08/23/2026M01230358-I1Open ↗
08/23/2026M01233165-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026M01236826-I1Open ↗
08/29/2026M01236826-I1Open ↗
08/24/2026M01236826-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/27/2011120671772Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/27/2011120671772Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/27/2011120671772Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M01230358-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/27/2011120671772Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026M01263294-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
04/27/2011120671772Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M01230358-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/27/2011120671772Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications4
08/22/2026M01236826-P2Open ↗
08/15/2026M01236826-I1Open ↗
08/13/2026M01236826-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/22/2026M01236826-P2Open ↗
08/15/2026M01236826-I1Open ↗
08/13/2026M01236826-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00086906-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01263294-I1Open ↗