← Back
Primarily 2 family with 1 store or office
60-01 70 AVENUE
QUEENS · BIN 4084420
💬 Discuss this project
1908Year Built
3Stories
S2Building Class
R5BZoning
4,800 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸
Primarily 2 family with 1 store or office · 2,017 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
Structural
Roof2p · 1 filing · 8 docs
2 jobs · most recent 11/27/2018
General Wiring
FiledStatusContractorScope
11/27/2018CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
11/06/2018CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
Building Lifecycle
All (71)Filed (4)Permit Issued (2)Signed Off (2)Violation (40)Objection (8)Special Inspection (15)
08/20/2025
Violation issued (ECB, open)
Construction
08/20/2025
Violation issued (ECB, closed)
Construction
12/04/2024
Violation issued (HPD, closed)
I
10/24/2024
Violation issued (ECB, closed)
Boilers
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/2024
Filed — No Work
Q00151367-P1
05/11/2024
Special inspection requirement — Public Assembly Emergency Lighting
ERIC WORCESTER
11/29/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2022
Violation issued (HPD, closed)
I
04/25/2022
Signed off — Alteration
Installation of (3) new VRF air cooled heat pump systems together with backup hydronic heat and related ductwork.
Q00589496-I1
04/20/2022
Signed off — Alteration
PROPOSED ROOF REPLACEMENT WITH NEW CONCRETE METAL DECK AND C JOIST AND INSTALLATION OF ROOFTOP DUNNAGE. First floor to replace window lintels.
Q00620344-I1
04/01/2022
Permit issued — Mechanical Systems
Q00589496-I1-MS
02/22/2022
Objection raised — Scope
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Scope
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Energy
02/22/2022
Objection resolved — Addressed
02/15/2022
Filed — Alteration
Installation of (3) new VRF air cooled heat pump systems together with backup hydronic heat and related ductwork.
Q00589496-I1
01/27/2022
Special inspection requirement — Shutoff dampers
Gregory Singer
01/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Singer
01/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Singer
01/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Singer
01/27/2022
Special inspection requirement — Maintenance information
Gregory Singer
01/27/2022
Special inspection requirement — Permanent certificate
Gregory Singer
01/27/2022
Special inspection requirement — Ventilation and air distribution system
Gregory Singer
01/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Gregory Singer
01/20/2022
Permit issued — Structural
Q00620344-I1-ST
11/19/2021
Objection raised — Admin
11/19/2021
Objection resolved — Addressed
11/16/2021
Filed — Alteration
PROPOSED ROOF REPLACEMENT WITH NEW CONCRETE METAL DECK AND C JOIST AND INSTALLATION OF ROOFTOP DUNNAGE. First floor to replace window lintels.
Q00620344-I1
11/16/2021
Special inspection requirement — Structural Cold-Formed Steel
Jeffrey Stones
11/10/2021
Special inspection requirement — Structural Steel - Details
Jeffrey Stones
11/10/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
10/27/2021
Special inspection requirement — Final
Jeffrey Stones
09/07/2021
Special inspection requirement — Mechanical Systems
Gregory Singer
09/07/2021
Special inspection requirement — Final
Gregory Singer
11/27/2019
Violation issued (ECB, closed)
Construction
09/24/2019
Filed — No Work
Q00151367-I1
11/05/2018
Violation issued (ECB, closed)
Unknown
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 71 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RIGHT CHOICE CONSTRUCTION1803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/15/2018$2.0M—— → —$417/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERIC WORCESTER ARCHITECT205/22/2024
GREGORY L SINGER, PE, PLLC102/15/2022
TAREK M. ZEID, PE, PLLC111/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGHT CHOICE CONSTRUCTIONGeneral Contractor603/21/2026
A ELECTRICAL MAIN SVC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY L. SINGER, PE, PL2455102/15/2022
MACIA INSPECTION & TESTIN402111/16/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRIGHT CHOICE CONSTRUCTION04/01/2022
DOB NOWStructuralSigned-offRIGHT CHOICE CONSTRUCTION01/20/2022
BISPLISSUEDWATERMARK PLUMBING CORP01/19/2022
BISPLISSUEDWATERMARK PLUMBING CORP06/18/2021
BISPLISSUEDDAVID JABLON11/18/2020
BISOTISSUEDRIGHT CHOICE CONSTRUCTION10/07/2020
BISPLISSUEDDAVID JABLON07/15/2020
BISPLISSUEDDAVID JABLON01/10/2019
BISOTISSUEDRIGHT CHOICE CONSTRUCTION01/04/2019
BISOTISSUEDRIGHT CHOICE CONSTRUCTION01/03/2019
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
05/11/2024Public Assembly Emergency LightingERIC WORCESTERprogress
01/27/2022Shutoff dampersGregory Singerenergy_progress
01/27/2022HVAC-R and service water heating equipmentGregory Singerenergy_progress
01/27/2022HVAC-R and service water piping design and insulationGregory Singerenergy_progress
01/27/2022HVAC-R and service water heating system controlsGregory Singerenergy_progress
01/27/2022Maintenance informationGregory Singerenergy_progress
01/27/2022Permanent certificateGregory Singerenergy_progress
01/27/2022Ventilation and air distribution systemGregory Singerenergy_progress
01/27/2022Energy Code Compliance InspectionsGregory Singerprogress
11/16/2021Structural Cold-Formed SteelJeffrey Stonesspecial
11/10/2021Structural Steel - DetailsJeffrey Stonesspecial
11/10/2021Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
10/27/2021FinalJeffrey Stonesprogress
09/07/2021Mechanical SystemsGregory Singerspecial
09/07/2021FinalGregory Singerprogress
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Place of Assembly2
08/22/2026Q00151367-I1Request digital key ↗
08/22/2026Q00151367-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/14/2026Q00620344-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION23
02/26/2026421685616Open ↗
09/30/2025421685616Open ↗
02/24/2023421685616Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION6
05/26/2022421685616Open ↗
07/21/2021421717547Open ↗
11/18/2020421717547Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY3
04/02/2024421326746Open ↗
11/21/2016421326746Open ↗
05/20/2016421326746Open ↗
▸DOB NOWLPC Approval/Permit2
08/13/2026Q00620344-I1Open ↗
08/13/2026Q00589496-I1Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/25/2019421728278Open ↗
04/23/2019421886356Open ↗
01/16/2019421722960Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/12/2026Q00151367-P1Open ↗
08/26/2026Q00620344-I1Open ↗
08/25/2026Q00589496-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026Q00620344-I1Open ↗
08/26/2026Q00620344-I1Open ↗
08/26/2026Q00620344-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00620344-I1Open ↗
08/22/2026Q00151367-I1Open ↗
08/22/2026Q00151367-P1Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
01/11/2019421717547Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/11/2019421717547Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING6
12/06/2021421717547Open ↗
11/24/2021421717547Open ↗
08/31/2021421717547Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
07/19/2019421685616Open ↗
05/10/2019421685616Open ↗
01/11/2019421717547Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/20/2022421717547Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
04/23/2019421886356Open ↗
01/16/2019421722960Open ↗
11/08/2018421685616Open ↗
▸BISTenant Protection Plan and Notes2
04/23/2019421886356Open ↗
11/08/2018421685616Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/01/2020421728278Open ↗
06/25/2019421728278Open ↗
01/16/2019421722960Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026Q00620344-I1Open ↗
08/13/2026Q00589496-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/25/2019421728278Open ↗
04/23/2019421886356Open ↗
01/16/2019421722960Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/28/2021421685616Open ↗
10/28/2021421685616Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/28/2021421685616Open ↗
10/28/2021421685616Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00589496-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/01/2022421685616Open ↗
12/28/2021421685616Open ↗
10/28/2021421685616Open ↗
▸BISFINAL INSPECTION2
12/01/2025421685616Open ↗
11/26/2025421685616Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
09/10/2025421685616Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION5
01/11/2019421717547Open ↗
06/20/2018421326746Open ↗
06/11/2018421326746Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER2
05/26/2022421685616Open ↗
07/21/2021421717547Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
12/28/2021421685616Open ↗
10/28/2021421685616Open ↗
06/25/2019421728278Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION14
04/02/2024421685616Open ↗
04/02/2024421685616Open ↗
06/01/2022421717547Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET5
06/25/2019421728278Open ↗
04/23/2019421886356Open ↗
01/16/2019421722960Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
05/26/2022421685616Open ↗
07/21/2021421717547Open ↗