← Back
One family attached or semi-detached
60-03 146 STREET
QUEENS · Queensboro Hill · BIN 4140535
💬 Discuss this project
1940Year Built
1Stories
A5Building Class
R4Zoning
1,453 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,079 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC207/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAMES WALTERS ELECTLElectrical103/22/2026
JZ CONSTRUCTION GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449207/02/2024
Building Lifecycle
All (41)Filed (2)Permit Issued (1)Signed Off (1)Violation (30)Inspection (3)Objection (2)Special Inspection (2)
02/03/2026
Violation issued (ECB, closed)
Construction
12/24/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
B
11/04/2025
Violation issued (HPD, closed)
A
11/03/2025
Violation issued (HPD, closed)
I
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
C
10/31/2025
Violation issued (HPD, closed)
A
10/31/2025
Violation issued (HPD, closed)
C
02/27/2025
Violation issued (HPD, closed)
C
10/16/2024
Signed off — Alteration
File to address ECB violation #39108827X, remove illegal porch at partial basement and open space with windows and door. Restore back to legal condition as per plan. No change in use, egress, or occupancy.
Q01030702-I1
10/08/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/11/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/20/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/14/2024
Violation issued (HPD, closed)
C
08/14/2024
Violation issued (HPD, closed)
B
08/14/2024
Violation issued (HPD, closed)
B
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/05/2024
Violation issued (HPD, closed)
I
07/02/2024
Filed — Alteration
File to address ECB violation #39108827X, remove illegal porch at partial basement and open space with windows and door. Restore back to legal condition as per plan. No change in use, egress, or occupancy.
Q01030702-P1
07/02/2024
Violation issued (HPD, closed)
C
07/02/2024
Violation issued (HPD, closed)
C
07/02/2024
Violation issued (HPD, closed)
C
07/02/2024
Violation issued (HPD, closed)
C
06/05/2024
Permit issued — General Construction
Q01030702-I1-GC
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
04/30/2024
Objection resolved — Addressed
04/29/2024
Objection raised — Scope
04/10/2024
Filed — Alteration
File to address ECB violation #39108827X, remove illegal porch at partial basement and open space with windows and door. Restore back to legal condition as per plan. No change in use, egress, or occupancy.
Q01030702-I1
03/15/2024
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC06/05/2024
2 projects · most recent 08/22/2026
FiledStatusContractorScope
08/22/2026Permit IssuedTOWER FIRE & ELECT SVCS1 meters
03/02/2019Permit IssuedTOWER FIRE & ELECT SVCS1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/08/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/11/2024Fail-Final General Construction Non-Directive 14FailView ↗
08/20/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/11/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
06/05/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q01030702-P1Request digital key ↗
08/23/2026Q01030702-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01030702-I1Open ↗
08/13/2026Q01030702-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01030702-I1Open ↗
08/24/2026Q01030702-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01030702-I1Open ↗
08/13/2026Q01030702-P1Open ↗