← Back
BuildNYC
Parochial school, yeshiva
Jewish Institute of Queens
60-05 WOODHAVEN BOULEVARD · Name © OpenStreetMap contributors · Rego Park · BIN 4072178
💬 Discuss this project
1956Year Built
6Stories
W2Building Class
R5Zoning
71,944 sfGross Floor Area
0Units
LL97 Covered0 Active Violations
Parochial school, yeshiva · Owner of record: Ohr Avner Foundation · 19,370 sf lot · 3.71 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 31 filing
Floor 2
Floor 12 filings
Cellar2 filings
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The New York Association303/22/2026
Biaritz Construction NY Associates103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sharon Associates111/05/2026
Konoski Engineering109/30/2026
Structural Engineering Integrated312/11/2025
Brad E. Cohen, PE101/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
2020 Group Service603/21/2026
BMG Group USA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.A.M.C.N.YGeneral Contractor110/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Konoski Engineering9111109/30/2026
Building Lifecycle
All (159)Filed (6)Permit Issued (2)Signed Off (1)Violation (122)Special Inspection (14)
11/05/2026
Filed — Alteration
Propose structure for new exterior steel mechanical platform located in the rear yard.
Q01474505-I1
10/14/2026
Special inspection requirement — Structural Steel - Welding
10/14/2026
Special inspection requirement — Final
10/14/2026
Special inspection requirement — Post-installed Anchors
10/14/2026
Special inspection requirement — Structural Steel - Details
10/14/2026
Special inspection requirement — Structural Steel - High Strength Bolting
10/13/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/02/2026
Permit issued — Mechanical Systems
Q01464842-I1-MS
09/30/2026
Filed — Alteration
Filing herewith for installation of HVAC equipment
Q01464842-I1
09/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
christopher konoski
09/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
christopher konoski
09/23/2026
Special inspection requirement — Ventilation and air distribution system
christopher konoski
09/23/2026
Special inspection requirement — Mechanical Systems
christopher konoski
09/23/2026
Special inspection requirement — Final
christopher konoski
09/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
christopher konoski
09/23/2026
Special inspection requirement — Maintenance information
christopher konoski
06/11/2026
Closed: Failure to file 2024 external low pressure inspection
DOB violation · closed on the city's record
06/11/2026
Closed: Failure to file 2023 external low pressure inspection
DOB violation · closed on the city's record
06/03/2026
Elevator Category 1 inspection report filed
02/19/2026
Signed off — Alteration
Q00450770-I1
12/31/2025
Special inspection requirement — Public Assembly Emergency Lighting
Chris Yiu
12/11/2025
Filed — No Work
Q01011058-P1
12/05/2025
Special inspection requirement — Public Assembly Emergency Lighting
Chris Yiu
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · closed
09/19/2025
Boiler inspection report filed
Initial · no defects · Accepted
09/23/2024
Failure to file 2023 external low pressure inspection
DOB violation · closed
05/21/2024
Boiler inspection report filed
Initial · no defects · Accepted
05/03/2024
Closed: Failure to perform category 5 inspection
DOB violation · closed on the city's record
04/12/2024
Elevator Category 5 inspection report filed
03/15/2024
Filed — No Work
Q01015319-I1
02/28/2024
Filed — No Work
Q01011058-I1
02/06/2024
Closed: Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed on the city's record
12/13/2023
Elevator Category 1 inspection report filed
12/12/2023
Closed: Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
DOB violation · closed on the city's record
12/08/2023
Closed: Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · closed on the city's record
12/08/2023
Closed: Violation issued for failure to file annual boiler 2016 inspection report
DOB violation · closed on the city's record
12/08/2023
Closed: Violation issued for failure to file annual boiler 2015 inspection report
DOB violation · closed on the city's record
12/08/2023
Closed: Violation issued for failure to file annual boiler 2013 inspection report
DOB violation · closed on the city's record
12/02/2023
Closed: Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · closed on the city's record
09/01/2023
Closed: Violation issued to elevator - failure to file category 1 2017 inspection/test
DOB violation · closed on the city's record
09/01/2023
Closed: Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
DOB violation · closed on the city's record
09/01/2023
Closed: Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
DOB violation · closed on the city's record
09/01/2023
Closed: Violation issued to elevator-failure to file category 1 2014 inspection/test
DOB violation · closed on the city's record
07/12/2023
Boiler inspection report filed
Initial · no defects · Accepted
05/09/2023
Closed: Failure to perform category 5 inspection
DOB violation · closed on the city's record
05/09/2023
Closed: Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
DOB violation · closed on the city's record
05/09/2023
Closed: Violation issued to elevator-failure to file category 1 2012 inspection/test
DOB violation · closed on the city's record
04/27/2023
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
04/26/2023
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
12/16/2022
Closed: Elevator: elevatorrequired (DOB violation)
DOB violation · closed on the city's record
08/12/2022
Elevator Category 5 inspection report filed
06/20/2022
Boiler inspection report filed
Initial · no defects · Accepted
12/17/2021
Failure to perform category 5 inspection
DOB violation · closed · Issued 2021; DOB's record still lists it as active
04/28/2021
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2021; DOB's record still lists it as active
04/07/2021
Boiler inspection report filed
Initial · no defects · Accepted
02/17/2021
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2021; DOB's record still lists it as active
01/29/2021
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix K3 of the 2014 nycbc. This is a controller feature which…
ECB violation · closed
01/21/2021
Permit issued — Boiler Equipment
Q00450770-I1-BE
01/19/2021
Filed — Alteration
Q00450770-I1
12/07/2020
At the time of inspection keys was missing. Provide keys for a complete inspection.
ECB violation · closed
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—G.A.M.C.N.Y—
DOB NOW—Dennis Leduc—
BIS—Dynamic Plumbing & Sprinkler—
BIS—Dynamic Plumbing & Sprinkler—
BIS—Jewish Institute of Queens—
BIS—Fire Command Co—
BIS—Coastqal Combustion—
BIS—Lighthouse—
BIS—Cook & Krupa—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Place of Assembly3
08/23/2026Q01015319-I1Request the plans ↗
08/18/2026Q01011058-P1Request the plans ↗
08/18/2026Q01011058-I1Request the plans ↗
▸DOB NOWPlans/Sketch2
11/07/2026Q01474505-I1Request the plans ↗
10/04/2026Q01464842-I1Request the plans ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/27/2026Q00450770-I1Request the plans ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
09/18/2025420627067Open ↗
01/06/2025420627067Open ↗
01/03/2025420627067Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
10/31/2016421348900Open ↗
10/31/2016421348900Open ↗
02/01/2013420627067Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/22/2013420627067Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature6
11/07/2026Q01474505-I1Open ↗
10/03/2026Q01464842-I1Open ↗
08/27/2026Q00450770-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/03/2026Q01464842-I1Open ↗
10/03/2026Q01464842-I1Open ↗
09/01/2026Q01011058-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/18/2016421348900Open ↗
11/05/2012420627067Open ↗
12/20/2007410038908Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/18/2016421348900Open ↗
12/20/2007410038908Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/18/2016421348900Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/20/2007410038908Open ↗
▸BISPC FULL REPORT1
12/20/2007410038908Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
10/03/2026Q01464842-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/18/2016421348900Open ↗
▸Safety & Tenant Protection5
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist3
11/07/2026Q01474505-I1Open ↗
10/03/2026Q01464842-I1Open ↗
08/13/2026Q00450770-I1Open ↗
▸BISSTREET TREE CHECKLIST1
11/29/2012420627067Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/22/2016421348900Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
10/03/2026Q01464842-I1Open ↗
08/27/2026Q00450770-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/20/2007410038908Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/05/2012420627067Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/18/2016421348900Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/18/2016421348900Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00450770-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00450770-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸BISSCHEDULE A - OCCUPANCY / USE6
09/18/2025420627067Open ↗
01/06/2025420627067Open ↗
01/03/2025420627067Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
11/07/2026Q01474505-I1Open ↗
10/03/2026Q01464842-I1Open ↗
08/27/2026Q00450770-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
08/18/2016421348900Open ↗
10/01/2012420627067Open ↗
12/20/2007410038908Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/27/2013420627067Open ↗
12/03/2012420627067Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
08/18/2016421348900Open ↗
09/27/2013420627067Open ↗
11/05/2012420627067Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
08/18/2016421348900Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
11/06/2025420627067Open ↗
▸BISEFILING COVER SHEET1
08/18/2016421348900Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
11/05/2012420627067Open ↗