← Back
BuildNYC
Two family brick
60-10 CATALPA AVENUE
QUEENS · Ridgewood · BIN 4084326
💬 Discuss this project
1909Year Built
2Stories
B1Building Class
R5BZoning
3,492 sfGross Floor Area
2Units
Rent Stabilized7 Active Violations ▸
Two family brick · 2,017 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar electric generating system installation8p · 4 filings · 20 docs
Floor 2Sprinkler system installation33p · 3 filings · 20 docs
Floor 1Sprinkler system installation32p · 3 filings · 20 docs
BasementSprinkler system installation13p · 2 filings · 20 docs
Sub-BasementPlumbing Work and Specifications30p · 3 filings · 20 docs
Site & exteriorPlumbing Work and Specifications8p · 1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2023$1.3M—6010 CATALPA LLC → Private party$359/sf building
06/03/2021$880K—Private party → 6010 CATALPA LLC$252/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kaijin Liang111/20/2025
Steel Core Engineering604/09/2025
Satwin Architect410/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Satwin Architect2003/21/2026
Kamtech Restoration203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Poler ContractingGeneral Contractor107/08/2026
Coolquest Mechanicalspecialty_contractor107/08/2026
Kamtech Restorationspecialty_contractor104/09/2026
Dynamic Plumbing & SprinklerFire Protection107/08/2026
L&J PLG & Heating Co of NYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sq. Arch4802111/20/2025
Steel Core Engineering1098904/09/2025
Building Lifecycle
02/24/2026
Signed off — Alteration
Q01322188-I1
12/05/2025
Permit issued — Solar
Q01322188-I1-SL
12/05/2025
Closed: Landmark (DOB violation)
DOB violation · closed on the city's record
11/25/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
11/20/2025
Filed — Alteration
Q01322188-I1
96 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKamtech Restoration12/05/2025
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY06/11/2024
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler06/05/2024
DOB NOWGeneral ConstructionPermit IssuedPoler Contracting05/31/2024
DOB NOWMechanical SystemsSigned-offCoolquest Mechanical05/22/2024
1 project · most recent 10/28/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/28/2024Signed-offL&J PLG & Heating Co of NYGas, Storm, Water/Sanitary
2 projects · most recent 05/06/2025
General Wiring
FiledStatusContractorScope
05/06/2025CompleteBerger Quality Electrical—
01/10/2024Permit IssuedElpo Electrical ContgGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/04/2024No Access-Final SP - Up to 3 Requested FloorsNo AccessView ↗
09/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/23/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/11/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/25/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
04/23/2025Sprinkler SystemsAlexander Sheymanspecial
04/23/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
01/30/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
01/30/2025Sprinkler SystemsAlexander Sheymanspecial
11/06/2024HVAC-R and service water piping design and insulationMarta Satwin-Rambergenergy_progress
11/06/2024Sprinkler SystemsAlexander Sheymanspecial
11/06/2024Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
11/06/2024Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
11/06/2024Energy Code Compliance InspectionsMarta Satwin-Rambergprogress
10/02/2024Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
10/02/2024HVAC-R and service water piping design and insulationMarta Satwin-Rambergenergy_progress
10/02/2024Energy Code Compliance InspectionsMarta Satwin-Rambergprogress
08/14/2024Structural Stability – Alterations of existing buildingsAlexander Sheymanspecial
08/14/2024Energy Code Compliance InspectionsMarta Satwin-Rambergprogress
08/14/2024Fire-Resistance Rated ConstructionMarta Satwin-Rambergprogress
08/14/2024Fenestration areasMarta Satwin-Rambergenergy_progress
08/14/2024Air barrier - visual inspectionMarta Satwin-Rambergenergy_progress
08/14/2024Fenestration and door U-factor and product ratingsMarta Satwin-Rambergenergy_progress
08/14/2024Insulation placement and R valuesMarta Satwin-Rambergenergy_progress
08/14/2024Interior lighting powerMarta Satwin-Rambergenergy_progress
08/14/2024Fenestration air leakageMarta Satwin-Rambergenergy_progress
08/14/2024MeteringMarta Satwin-Rambergenergy_progress
08/14/2024Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
10/21/2023Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
10/21/2023Heating SystemsAlexander Sheymanspecial
Latest 25 of 38.
63 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account