DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB02/26/1997VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB04/04/2024FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35489286Z ISSUED ON 12/1/2020, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2). AN ACCEPTABLE CERTIFNothing owed — awaiting certificate of correction
ECB12/01/2020WORK WITHOUT A PERMIT. WORK NOTED: ERECTED FULL HEIGHT PARTITIONS AT 1ST FLOOR MASSAGE PARLOR "LILY AROMA SPA" TO CREATE 2 MASSAGE ROOMS. REEMDY: OBTAIN PERMITSNothing owed — awaiting certificate of correction