← Back
Walk-up cooperative
60-33 251 STREET
QUEENS · Douglaston-Little Neck · BIN 4459171
💬 Discuss this project
1952Year Built
2Stories
C6Building Class
R3-2Zoning
154,176 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized5 Open Violations ▸
Walk-up cooperative · Owner of record: DEEPDALE GARDENS SECOND CORPORATION · 315,154 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEEPDALE GARDENS CORPORATIONS1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT GERMAIN JR. PE709/18/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABILENE INCGeneral Contractor203/21/2026
NY CITY PLUMBER CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT F. GERMAIN JR. PE5100709/18/2023
Building Lifecycle
All (30)Filed (7)Permit Issued (3)Signed Off (3)Violation (5)Inspection (4)Special Inspection (8)
11/13/2023
Signed off — Alteration
RECONNECT EXISTING LOW PRESSURE GAS LINE. NEW GAS FIRED HOT WATER HEATER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784873-I1
11/13/2023
Signed off — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784863-I1
11/13/2023
Signed off — Alteration
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784893-I1
10/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2023
Filed — Alteration
RECONNECT EXISTING LOW PRESSURE GAS LINE. NEW GAS FIRED HOT WATER HEATER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784873-P2
05/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2023
Filed — Alteration
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784893-P1
03/29/2023
Filed — Alteration
RECONNECT EXISTING LOW PRESSURE GAS LINE. NEW GAS FIRED HOT WATER HEATER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784873-P1
03/29/2023
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784863-P1
03/29/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/29/2023
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
03/29/2023
Special inspection requirement — Final
Robert Germain Jr.
03/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
03/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
03/29/2023
Special inspection requirement — Maintenance information
Robert Germain Jr.
03/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2022
Permit issued — Plumbing
Q00784873-I1-PL
08/30/2022
Permit issued — General Construction
Q00784863-I1-GC
08/30/2022
Permit issued — Boiler Equipment
Q00784893-I1-BE
08/22/2022
Filed — Alteration
REPLACEMENT (1) NEW LOW PRESSURE BOILER AND (1) NEW COMBINATION GAS/OIL BURNER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784893-I1
08/19/2022
Filed — Alteration
RECONNECT EXISTING LOW PRESSURE GAS LINE. NEW GAS FIRED HOT WATER HEATER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784873-I1
08/19/2022
Filed — Alteration
NEW CHIMNEY LINER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
Q00784863-I1
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP08/30/2022
DOB NOWGeneral ConstructionSigned-offABILENE INC08/30/2022
DOB NOWBoiler EquipmentSigned-offABILENE, INC08/30/2022
BISFSISSUEDRICHARD MORTMAN07/09/1997
BISOTISSUEDR.D. MORTMAN AND CO INC08/08/1994
1 project · most recent 05/19/2023
Boiler Controls
FiledStatusContractorScope
05/19/2023CompleteABILENE ELECTRIC INCBoiler Controls
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/29/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/29/2023Chimneys and ventsRobert Germain Jr.special
03/29/2023FinalRobert Germain Jr.progress
03/29/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/29/2023HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
03/29/2023HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
03/29/2023Maintenance informationRobert Germain Jr.energy_progress
03/29/2023HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q00784873-I1Request digital key ↗
08/25/2026Q00784873-P2Request digital key ↗
08/25/2026Q00784873-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q00784873-P2Open ↗
08/25/2026Q00784873-P1Open ↗
08/25/2026Q00784873-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026Q00784893-I1Open ↗
09/23/2026Q00784893-I1Open ↗
09/23/2026Q00784893-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026Q00784893-I1Open ↗
08/26/2026Q00784863-I1Open ↗
08/26/2026Q00784863-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q00784873-P2Open ↗
08/25/2026Q00784873-P1Open ↗
08/25/2026Q00784873-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00784893-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00784893-I1Open ↗