← Back
Five to six families
60-33 68 AVENUE
QUEENS · BIN 4084231
💬 Discuss this project
1899Year Built
3Stories
C2Building Class
R5BZoning
4,872 sfGross Floor Area
6Units
Rent Stabilized8 Open Violations ▸
Five to six families · Owner of record: 6033 RIDGEWOOD, LLC · 3,060 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6033 RIDGEWOOD, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2025$855K—— → —$175/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE STUDIO509/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALTO ELECTRIC INCElectrical103/22/2026
PUREWAL CONTRACTORS INCGeneral Contractor104/09/2026
NY METROPOLITAN P&H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURE STUDIO3777409/25/2025
Building Lifecycle
All (41)Filed (5)Permit Issued (2)Signed Off (2)Violation (9)Inspection (3)Objection (16)Special Inspection (4)
12/18/2025
Signed off — Alteration
Reconfigure and enlarge the bathroom, remodel the kitchen in Unit 3R, and relocate entry door for Unit 3R. Enclosing open room and adding new door, adding new door to master bedroom.
Q01209214-S1
12/18/2025
Signed off — Alteration
Reconfigure and enlarge the bathroom, remodel the kitchen in Unit 3R, and relocate entry door for Unit 3R. Enclosing open room and adding new door, adding new door to master bedroom.
Q01209214-I1
11/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Gati
10/14/2025
Objection resolved — Addressed
10/14/2025
Objection resolved — Addressed
10/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Gati
10/01/2025
Objection raised — Admin
09/30/2025
Objection raised — Admin
09/25/2025
Filed — Alteration
Reconfigure and enlarge the bathroom, remodel the kitchen in Unit 3R, and relocate entry door for Unit 3R. Enclosing open room and adding new door, adding new door to master bedroom.
Q01209214-P3
09/25/2025
Filed — Alteration
Reconfigure and enlarge the bathroom, remodel the kitchen in Unit 3R, and relocate entry door for Unit 3R. Enclosing open room and adding new door, adding new door to master bedroom.
Q01209214-P2
09/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Gati
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Gati
08/22/2025
Permit issued — Plumbing
Q01209214-S1-PL
08/07/2025
Permit issued — General Construction
Q01209214-I1-GC
07/22/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Admin
07/14/2025
Filed — Alteration
Reconfigure and enlarge the bathroom, remodel the kitchen in Unit 3R, and relocate entry door for Unit 3R. Enclosing open room and adding new door, adding new door to master bedroom.
Q01209214-P1
06/23/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Cost
06/02/2025
Objection raised — Energy
06/02/2025
Objection raised — Admin
06/02/2025
Objection raised — Admin
06/02/2025
Objection raised — Cost
05/23/2025
Filed — Alteration
Reconfigure and enlarge the bathroom, remodel the kitchen in Unit 3R, and relocate entry door for Unit 3R. Enclosing open room and adding new door, adding new door to master bedroom.
Q01209214-S1
05/23/2025
Filed — Alteration
Reconfigure and enlarge the bathroom, remodel the kitchen in Unit 3R, and relocate entry door for Unit 3R. Enclosing open room and adding new door, adding new door to master bedroom.
Q01209214-I1
11/17/2016
Violation issued (HPD, closed)
I
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/07/1989
Violation issued (HPD, open)
B
09/07/1989
Violation issued (HPD, open)
B
09/07/1989
Violation issued (HPD, open)
B
08/23/1989
Violation issued (HPD, open)
B
08/23/1989
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNY METROPOLITAN P&H INC08/22/2025
DOB NOWGeneral ConstructionSigned-offPUREWAL CONTRACTORS INC08/07/2025
1 job · most recent 08/12/2025
General Wiring
FiledStatusContractorScope
08/12/2025CompleteALTO ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/17/2025Fire-Resistant Penetrations and JointsWilliam Gatispecial
10/14/2025Structural Stability – Alterations of existing buildingsWilliam Gatispecial
09/18/2025Structural Stability – Alterations of existing buildingsWilliam Gatispecial
09/18/2025Fire-Resistant Penetrations and JointsWilliam Gatispecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026Q01209214-S1Request digital key ↗
08/18/2026Q01209214-P3Request digital key ↗
08/18/2026Q01209214-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/13/2026Q01209214-P2Open ↗
08/13/2026Q01209214-I1Open ↗
08/13/2026Q01209214-S1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q01209214-P1Open ↗
08/13/2026Q01209214-P3Open ↗
08/13/2026Q01209214-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01209214-S1Open ↗
08/28/2026Q01209214-I1Open ↗
08/26/2026Q01209214-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q01209214-P1Open ↗
08/13/2026Q01209214-S1Open ↗
08/13/2026Q01209214-P3Open ↗
Showing 3 of 5 on file for this type