← Back
Two family frame
60-44 59 ROAD
QUEENS · BIN 4060917
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
R4-1Zoning
1,880 sfGross Floor Area
2Units
Two family frame · 3,000 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/14/2021$980K—— → —$521/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC712/12/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor903/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506212/12/2022
BRIAN ILL DEVELOPMENT LLC1402612/12/2022
Building Lifecycle
All (45)Filed (7)Permit Issued (4)Signed Off (3)Inspection (4)Special Inspection (27)
12/22/2022
Signed off — Alteration
SMALL VERTICAL AND HORIZONTAL EXTENSION TO EXISTING 2 FAMILY DWELLING UNITS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00702328-I1
12/22/2022
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB # Q00695648
Q00695648-I1
12/14/2022
Signed off — Alteration
Q00712270-I1
12/14/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2022
Filed — Alteration
SMALL VERTICAL AND HORIZONTAL EXTENSION TO EXISTING 2 FAMILY DWELLING UNITS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00702328-P1
12/12/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB # Q00695648
Q00695648-P3
12/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
12/12/2022
Special inspection requirement — Heating Systems
BRIAN ILL
12/12/2022
Special inspection requirement — Masonry
BRIAN ILL
12/12/2022
Special inspection requirement — Mechanical Systems
BRIAN ILL
12/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ILL
12/12/2022
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
12/12/2022
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
12/12/2022
Special inspection requirement — Final
BRIAN ILL
12/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
12/12/2022
Special inspection requirement — Footing and Foundation
BRIAN ILL
12/12/2022
Special inspection requirement — Interior lighting power
BRIAN ILL
12/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
12/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
12/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
12/12/2022
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
12/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
12/12/2022
Special inspection requirement — Maintenance information
BRIAN ILL
12/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
12/12/2022
Special inspection requirement — Concrete - Cast-In-Place
BRIAN ILL
12/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB # Q00695648
Q00695648-P2
08/23/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB # Q00695648
Q00695648-P1
08/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
08/23/2022
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/23/2022
Special inspection requirement — Maintenance information
BRIAN ILL
08/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
08/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
08/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
06/28/2022
Permit issued — General Construction
Q00702328-I1-GC-CX
04/25/2022
Permit issued — Plumbing
Q00695648-I1-PL
04/19/2022
Permit issued — General Construction
Q00702328-I1-GC-CX
04/16/2022
Permit issued — Construction Fence
Q00712270-I1-FN
04/07/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB # Q00695648
Q00695648-I1
04/06/2022
Filed — Alteration
Q00712270-I1
04/04/2022
Filed — Alteration
SMALL VERTICAL AND HORIZONTAL EXTENSION TO EXISTING 2 FAMILY DWELLING UNITS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00702328-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC06/28/2022
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG04/25/2022
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC04/19/2022
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC04/16/2022
1 project · most recent 08/22/2022
General Wiring
FiledStatusContractorScope
08/22/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/14/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
12/12/2022HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
12/12/2022Fire-Resistant Penetrations and JointsBRIAN ILLspecial
12/12/2022Heating SystemsBRIAN ILLspecial
12/12/2022MasonryBRIAN ILLspecial
12/12/2022Mechanical SystemsBRIAN ILLspecial
12/12/2022Structural Stability – Alterations of existing buildingsBRIAN ILLspecial
12/12/2022Subgrade InspectionsXIAOHONG ZHAOspecial
12/12/2022Energy Code Compliance InspectionsBRIAN ILLprogress
12/12/2022FinalBRIAN ILLprogress
12/12/2022Fire-Resistance Rated ConstructionBRIAN ILLprogress
12/12/2022Footing and FoundationBRIAN ILLprogress
12/12/2022Interior lighting powerBRIAN ILLenergy_progress
12/12/2022HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
12/12/2022HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
12/12/2022HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
12/12/2022Fire-Resistant Penetrations and JointsBRIAN ILLspecial
12/12/2022Energy Code Compliance InspectionsBRIAN ILLprogress
12/12/2022HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
12/12/2022Maintenance informationBRIAN ILLenergy_progress
12/12/2022HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
12/12/2022Concrete - Cast-In-PlaceBRIAN ILLspecial
08/23/2022Fire-Resistant Penetrations and JointsBRIAN ILLspecial
08/23/2022Energy Code Compliance InspectionsBRIAN ILLprogress
08/23/2022Maintenance informationBRIAN ILLenergy_progress
08/23/2022HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
Latest 25 of 27.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00702328-I1Request digital key ↗
08/26/2026Q00702328-P1Request digital key ↗
08/26/2026Q00712270-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/26/2026Q00702328-I1Open ↗
08/13/2026Q00702328-P1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature12
09/25/2026Q00702328-P1Open ↗
09/25/2026Q00702328-P1Open ↗
08/23/2026Q00695648-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00702328-I1Open ↗
08/26/2026Q00712270-I1Open ↗
08/13/2026Q00695648-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026Q00702328-P1Open ↗
09/25/2026Q00702328-P1Open ↗
08/23/2026Q00695648-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00702328-I1Open ↗
08/13/2026Q00702328-P1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00695648-I1Open ↗
08/13/2026Q00702328-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/26/2026Q00702328-I1Open ↗
08/13/2026Q00702328-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/26/2026Q00702328-I1Open ↗
08/13/2026Q00702328-P1Open ↗
▸DOB NOWPlot Diagram2
08/26/2026Q00702328-I1Open ↗
08/13/2026Q00702328-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00702328-I1Open ↗