ECB11/19/2020AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS NEW GAS PIPING INSTALLED WITHOUT A PERMIT. UTILITY COMPANY LOCKED 1ST FLOOR GAS METER., OBTAIN PERMIT$2K due
ECB11/19/2020AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS NEW GAS PIPING INSTALLED THAT HAS NOT BEEN TESTED. UTILITY COMPANY LOCKED 1ST FLOOR GAS METER., PERFORM TEST$2K due
ECB11/19/2020AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS, GAS BEING SUPPLIED TO THE BUILDING WITHOUT DOB AUTHORIZATION AFTER NEW GAS PIPING WAS INSTALLED WITHOUT A PERMIT. UTILITY COMPANY LOCKED THE$5K due
ECB11/19/2020AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS A GAS FLEX HOSE USED TO BYPASS THE GAS FROM 1 GAS METER TO ANOTHER THAT IS LOCKED THAT IS NOT CODE COMPLIANT. UTILITY COMPANY LOCKED THE 1ST F$1K due
ECB05/20/2019AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS NEW GAS PIPING INSTALLED WITHOUT A PERMIT. UTILITY COMPANY LOCKED 1ST FLOOR GAS METER., OBTAIN PERMIT$12K due
ECB05/20/2019AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS NEW GAS PIPING INSTALLED THAT HAS NOT BEEN TESTED. UTILITY COMPANY LOCKED 1ST FLOOR GAS METER., PERFORM TEST$12K due
ECB05/20/2019AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS, GAS BEING SUPPLIED TO THE BUILDING WITHOUT DOB AUTHORIZATION AFTER NEW GAS PIPING WAS INSTALLED WITHOUT A PERMIT. UTILITY COMPANY LOCKED THE$25K due
ECB05/20/2019AT TIME OF MY INSPECTION I OBSERVED IN THE CELLAR BY THE GAS METERS A GAS FLEX HOSE USED TO BYPASS THE GAS FROM 1 GAS METER TO ANOTHER THAT IS LOCKED THAT IS NOT CODE COMPLIANT. UTILITY COMPANY LOCKED THE 1ST F$6K due