← Back
BuildNYC
Five to six families
60-62 CATALPA AVENUE
QUEENS · Ridgewood · BIN 4085187
💬 Discuss this project
1909Year Built
3Stories
C2Building Class
R5BZoning
5,100 sfGross Floor Area
6Units
Rent Stabilized26 Active Violations 25 unresolved · 1 paperwork only 1 old, status unconfirmed ▸
Five to six families · Owner of record: Aba Future · 2,521 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorHeavy duty sidewalk shed5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development303/22/2026
Aba Future103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arquitectura Varela108/24/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Safeway ContractingScaffold303/21/2026
Building Lifecycle
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
01/16/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/16/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
HPD violation · closed
11/16/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC FIXTURES AT CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st…
HPD violation · open
11/16/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st…
HPD violation · open
52 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offNew Safeway Contracting08/25/2021
BISOTISSUEDRVF Contracting08/24/2020
2 projects · most recent 11/19/2021
General Wiring
FiledStatusContractorScope
11/19/2021Permit IssuedWCK Electric—
08/31/2020CompleteAtn ElectricGeneral Wiring
Nothing on file for this building.
14 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account