Five to six families
The 60-64 Catalpa Condominium
60-64 CATALPA AVENUE · Ridgewood · BIN 4085188
💬 Discuss this project
1909Year Built
3Stories
C2Building Class
R5BZoning
5,100 sfGross Floor Area
6Units
Rent Stabilized9 Open Violations ▸
Five to six families · Owner of record: 60-64 CATALPA LLC · 2,521 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 1 filing · 20 docs
Floor 3Under Construction56p · 3 filings · 20 docs
Floor 2Under Construction55p · 3 filings · 20 docs
Floor 1Under Construction49p · 3 filings · 20 docs
CellarUnder Construction27p · 2 filings · 20 docs
Site & exteriorUnder Construction20p · 2 filings · 20 docs
Filed — no permit issued1p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60-64 CATALPA4210/01/2026
GSR CONTRACTOR104/09/2026
F I CONTRACTING103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/10/2025$1.4M—Private party → 60-64 CATALPA LLC$270/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JP ENGINEERING403/18/2026
IKRA CONSULTING LLC103/17/2026
ELCHERBINI ARCHITECT P.C.802/04/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ELCHERBINI ARCHITECTS P.C.2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
F I CONTRACTING CORPGeneral Contractor1710/01/2026
ATN ELECTRIC CORPElectrical103/22/2026
HV ELECTRIC CORPElectrical103/22/2026
GSR CONTRACTOR INCGeneral Contractor104/09/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355303/18/2026
Building Lifecycle
All (135)Filed (13)Permit Issued (15)Signed Off (1)Violation (60)Inspection (9)Objection (8)Special Inspection (29)
09/30/2026
Permit issued — Mechanical Systems
Q01228137-S1-MS
09/25/2026
Permit issued — Structural
Q01224511-S1-GC
05/23/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01372354-I1
05/07/2026
Violation issued (HPD, open)
A
04/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Violation issued (ECB, open)
Construction
04/08/2026
Violation issued (ECB, open)
Unknown
03/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/23/2026
Permit issued — General Construction
Q01212112-I1-GC
03/23/2026
Permit issued — Mechanical Systems
Q01228137-S1-MS
03/23/2026
Permit issued — Sidewalk Shed
Q01372354-I1-SH
03/18/2026
Filed — Alteration
Mechanical filing associated with interior renovation filing. All as per plans and applications. No change in use, egress or occupancy.
Q01228137-P2
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
03/18/2026
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
03/17/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01372354-I1
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
03/13/2026
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
02/24/2026
Special inspection requirement — Final
ABDALLAH ELCHERBINI
02/17/2026
Permit issued — Mechanical Systems
Q01228137-S1-MS
02/04/2026
Filed — Alteration
Interior renovation of residential units, removal of non-load bearing partitions, erection of new non-load bearing partitions, painting and finishes work.
Q01212112-P2
02/04/2026
Special inspection requirement — Final
ABDALLAH ELCHERBINI
01/26/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/28/2025
Filed — Alteration
HEREWITH FILING TEMP. 8'-0" HIGH CONSTRUCTION FENCE. ALL AS PER PLANS AND APPLICATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01340304-I1
12/16/2025
Permit issued — Structural
Q01224511-S1-GC
12/15/2025
Permit issued — General Construction
Q01224511-S1-ST
12/05/2025
Filed — Alteration
Q01224511-P3
11/25/2025
Violation issued (ECB, open)
Unknown
11/25/2025
Violation issued (ECB, open)
Unknown
11/25/2025
Violation issued (ECB, open)
Construction
11/25/2025
Violation issued (ECB, open)
Site Safety
11/25/2025
Violation issued (ECB, open)
Unknown
11/21/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/21/2025
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
11/18/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/24/2025
Filed — Alteration
Mechanical filing associated with interior renovation filing. All as per plans and applications. No change in use, egress or occupancy.
Q01228137-S1
10/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Interior lighting power
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Lighting controls
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Permanent certificate
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Metering
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Electrical motors and elevators
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Ventilation and air distribution system
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Maintenance information
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
ABDALLAH ELCHERBINI
10/21/2025
Permit issued — Plumbing
Q01228137-I1-PL
10/15/2025
Filed — Alteration
Q01224511-P1
10/15/2025
Filed — Alteration
Mechanical filing associated with interior renovation filing. All as per plans and applications. No change in use, egress or occupancy.
Q01228137-P1
10/15/2025
Filed — Alteration
Interior renovation of residential units, removal of non-load bearing partitions, erection of new non-load bearing partitions, painting and finishes work.
Q01212112-P1
10/15/2025
Special inspection requirement — Post-installed Anchors
10/15/2025
Special inspection requirement — Final
ABDALLAH ELCHERBINI
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/09/2025
Special inspection requirement — Final
ABDALLAH ELCHERBINI
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedF I CONTRACTING CORP09/30/2026
DOB NOWStructuralSigned-offF I CONTRACTING CORP09/25/2026
DOB NOWGeneral ConstructionSigned-offF I CONTRACTING CORP03/23/2026
DOB NOWMechanical SystemsPermit IssuedF I CONTRACTING CORP03/23/2026
DOB NOWSidewalk ShedSigned-offGSR CONTRACTOR INC03/23/2026
DOB NOWMechanical SystemsPermit IssuedF I CONTRACTING CORP02/17/2026
DOB NOWStructuralSigned-offF I CONTRACTING CORP12/16/2025
DOB NOWGeneral ConstructionSigned-offF I CONTRACTING CORP12/15/2025
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP10/21/2025
DOB NOWGeneral ConstructionSigned-offF I CONTRACTING CORP09/22/2025
DOB NOWGeneral ConstructionSigned-offF I CONTRACTING CORP09/22/2025
DOB NOWGeneral ConstructionSigned-offF I CONTRACTING CORP09/22/2025
DOB NOWStructuralSigned-offF I CONTRACTING CORP09/22/2025
DOB NOWGeneral ConstructionSigned-offF I CONTRACTING CORP07/29/2025
DOB NOWGeneral ConstructionSigned-offF I CONTRACTING CORP06/11/2025
BISPLISSUEDOLYMPIA PLBING & HTG CORP09/19/2019
BISOTISSUEDJ.S. IMPROVEMENT LLC05/16/2016
BISBLISSUEDJAMES SIMPSON & SON INC08/25/2015
BISPLISSUEDJAMES SIMPSON & SON INC08/25/2015
BISOTISSUEDJ.S. IMPROVEMENT LLC08/05/2015
BISOTISSUEDANDRA'S K. CONSTRUCTION C11/27/2013
1 project · most recent 03/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/18/2026Permit IssuedF I CONTRACTING CORPHeating and Air Conditioning Systems
Heat / Cool
Lg ZRUM036GSSO 3 tons · Vrf Outdoor ×4
ZRUM060GSSO 5 tons · Vrf Outdoor ×2
1 project · most recent 03/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/18/2026Permit IssuedSIGNORE & SONS PLBG CORPGas, Water/Sanitary
3 projects · most recent 03/21/2026
General Wiring
FiledStatusContractorScope
03/21/2026Permit IssuedRICHARD NEU—
11/03/2025Permit IssuedHV ELECTRIC CORPGeneral Wiring
11/01/2019CompleteATN ELECTRIC CORPGeneral Wiring
2 projects · most recent 03/17/2026
Sidewalk Shed Fence
FiledStatusContractorScope
03/17/2026Signed-offGSR CONTRACTOR INCSidewalk Shed
12/28/2025——Fence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/26/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/21/2025Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
11/18/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/18/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
03/18/2026Post-installed AnchorsABDALLAH ELCHERBINIspecial
03/13/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
03/13/2026Post-installed AnchorsABDALLAH ELCHERBINIspecial
02/24/2026FinalABDALLAH ELCHERBINIprogress
02/04/2026FinalABDALLAH ELCHERBINIprogress
10/24/2025Fire-Resistance Rated ConstructionABDALLAH ELCHERBINIprogress
10/24/2025Interior lighting powerABDALLAH ELCHERBINIenergy_progress
10/24/2025Duct leakage testing, insulation and designABDALLAH ELCHERBINIenergy_progress
10/24/2025Lighting controlsABDALLAH ELCHERBINIenergy_progress
10/24/2025Permanent certificateABDALLAH ELCHERBINIenergy_progress
10/24/2025MeteringABDALLAH ELCHERBINIenergy_progress
10/24/2025Electrical motors and elevatorsABDALLAH ELCHERBINIenergy_progress
10/24/2025Ventilation and air distribution systemABDALLAH ELCHERBINIenergy_progress
10/24/2025Maintenance informationABDALLAH ELCHERBINIenergy_progress
10/24/2025Exhaust and Vent Systems in Plenums and DuctsABDALLAH ELCHERBINIspecial
10/24/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
10/24/2025Heating SystemsABDALLAH ELCHERBINIspecial
10/24/2025Post-installed AnchorsABDALLAH ELCHERBINIspecial
10/24/2025Energy Code Compliance InspectionsABDALLAH ELCHERBINIprogress
10/15/2025Post-installed Anchors—special
10/15/2025FinalABDALLAH ELCHERBINIprogress
10/15/2025Fire-Resistant Penetrations and Joints—special
10/09/2025FinalABDALLAH ELCHERBINIprogress
07/02/2025HVAC-R and service water heating equipmentABDALLAH ELCHERBINIenergy_progress
Latest 25 of 29.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/29/2026Q01372354-I1Request digital key ↗
08/18/2026Q01212112-P2Request digital key ↗
08/18/2026Q01212112-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits32
▸DOB NOWLPC Approval/Permit12
08/13/2026Q01228137-P1Open ↗
08/13/2026Q01212112-P2Open ↗
08/13/2026Q01228137-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
05/04/2019421892072Open ↗
04/12/2019421892072Open ↗
03/18/2019421892072Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
09/20/2019421892072Open ↗
08/19/2019421892072Open ↗
05/18/2016421270387Open ↗
Showing 3 of 7 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
04/03/2017421270387Open ↗
12/12/2016421078675Open ↗
03/21/2015420904267Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/03/2025421843839Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/29/2026Q01372354-I1Open ↗
08/18/2026Q01212112-P2Open ↗
08/18/2026Q01212112-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
02/12/2020421892072Open ↗
08/08/2019421892072Open ↗
02/28/2019421892072Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/27/2026Q01228137-P3Open ↗
09/27/2026Q01228137-P3Open ↗
09/23/2026Q01228137-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/12/2016421270387Open ↗
08/27/2015421078764Open ↗
06/09/2015421092908Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026Q01228137-P3Open ↗
09/23/2026Q01228137-S1Open ↗
09/01/2026Q01228137-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/12/2016421270387Open ↗
06/09/2015421092908Open ↗
02/06/2015421078675Open ↗
▸BISProfessional and Owner Certification (POC3)1
08/27/2015421078764Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/05/2013420904267Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/28/2019421892072Open ↗
08/27/2015421078764Open ↗
06/09/2015421092908Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
05/12/2016421270387Open ↗
08/27/2015421078764Open ↗
06/09/2015421092908Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
02/28/2019421892072Open ↗
▸BISST-1 Street Tree Checklist1
12/05/2013420904267Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/18/2026Q01212112-P1Open ↗
08/18/2026Q01212112-P2Open ↗
08/18/2026Q01228137-P2Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/12/2019421892072Open ↗
05/12/2016421270387Open ↗
02/06/2015421078675Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
12/05/2013420904267Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
02/12/2020421892072Open ↗
08/08/2019421892072Open ↗
02/28/2019421892072Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/19/2019421892072Open ↗
04/03/2017421270387Open ↗
12/12/2016421078675Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
12/05/2013420904267Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLETTERS - SUPPORTING DOCUMENTATION10
11/21/2025421843839Open ↗
11/03/2025421843839Open ↗
11/03/2025421843839Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/02/2020421892072Open ↗
02/25/2020421892072Open ↗
02/12/2020421892072Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/12/2016421270387Open ↗
08/27/2015421078764Open ↗
06/09/2015421092908Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL2
11/21/2025421843839Open ↗
02/12/2020421892072Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
12/19/2019421892072Open ↗
02/28/2019421892072Open ↗
04/03/2017421270387Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
12/05/2013420904267Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET6
02/28/2019421892072Open ↗
05/06/2016421270387Open ↗
08/27/2015421078764Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
08/12/2019421892072Open ↗
02/06/2017421270387Open ↗
12/12/2016421078675Open ↗
▸BISBOROUGH INTAKE FORM1
02/25/2020421892072Open ↗
▸Other Documents8
▸DOB NOWDHCR Document4
08/13/2026Q01212112-I1Open ↗
08/13/2026Q01212112-P1Open ↗
08/13/2026Q01212112-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR2
05/09/2016421270387Open ↗
03/21/2015421078675Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
11/21/2025421843839Open ↗
▸BISLL-2 6/04-31
08/11/2015421078675Open ↗