| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/18/2025 | Signed-off | NUCOR CONSTRUCTION CORP | Air Conditioning Systems, Ventilation Systems | Cooling Water Furnace V3AH048 46,300 BTU · Wshp ×1 Ventilation Greenheck CSP-A780 600 CFM · Exhaust Fan ×1 |
| 10/21/2024 | Signed-off | A.W. & S. CONSTRUCTION CO | Air Conditioning Systems, Ventilation Systems | Cooling Florida Heat Pump EC096 102,000 BTU · Wshp ×1 Ventilation |
| 10/21/2024 | Signed-off | A.W. & S. CONSTRUCTION CO | Air Conditioning Systems, Ventilation Systems | Cooling Ventilation |
| 06/18/2024 | Signed-off | A.W. & S. CONSTRUCTION CO | Ventilation Systems | Ventilation Greenheck SP-A390-VG 280 CFM · Exhaust Fan ×1 |
| 06/11/2024 | Signed-off | ALLERTONFOX CONSTRUCTION | Air Conditioning Systems, Ventilation Systems | Cooling Climatemaster TCH036AHN202CS3S 36,900 BTU · Heat Pump Outdoor ×1 TCH060AHP202T3S 53,000 BTU · Heat Pump Outdoor ×1 Ventilation Loren Cook 90SQN12D 400 CFM · Exhaust Fan ×1 |
| 06/11/2024 | Signed-off | A.W. & S. CONSTRUCTION CO | Air Conditioning Systems | Cooling Climatemaster TCH060AHB202TZS 59,400 BTU · Heat Pump Outdoor ×2 TCH030AHB40CTBS 24,200 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/17/2025 | Signed-off | ASHLAR MECHANICAL CORP | 28 heads |
| 06/18/2025 | Signed-off | SHAMROCK MECHANICAL INC | 168 heads |
| 10/21/2024 | Signed-off | A + SPRINKLER CORP | 120 heads |
| 10/21/2024 | Signed-off | A + SPRINKLER CORP | 119 heads |
| 06/18/2024 | Signed-off | A + SPRINKLER CORP | 186 heads |
| 06/11/2024 | Signed-off | STANDARD FIRE PROTECT LLC | 34 heads |
| 06/11/2024 | Signed-off | A + SPRINKLER CORP | 127 heads |
| 06/14/2022 | Signed-off | PSI PARTNERS, LLC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/17/2025 | — | — | — |
| 06/18/2025 | Signed-off | DV PLUMBING INC | Water/Sanitary |
| 10/21/2024 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 10/21/2024 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 09/10/2024 | — | — | Water/Sanitary |
| 06/18/2024 | Signed-off | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 06/11/2024 | Signed-off | STANDARD PLBG SVS LLC | Water/Sanitary |
| 06/11/2024 | Signed-off | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 07/09/2025 | Complete | COGEN ELEC'L SERVICES,INC | General Wiring |
| 06/13/2025 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 05/20/2025 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 10/07/2024 | Complete | COGEN ELEC'L SERVICES,INC | — |
| 06/05/2024 | Complete | MIKOMA ELECTRIC LLC | General Wiring |
| 06/04/2024 | Complete | QUEUE ELEC'L CONTRS, INC | — |
| 06/04/2024 | Complete | QUEUE ELEC'L CONTRS, INC | General Wiring |
| 04/14/2024 | Complete | LEBO ELECTRIC LLC | General Wiring |
| 04/01/2024 | Complete | ILLUMINOUS ELECTRIC CORP. | — |
| 02/14/2024 | Complete | COGEN ELEC'L SERVICES,INC | General Wiring |
| 02/14/2024 | Complete | COGEN ELEC'L SERVICES,INC | — |
| 01/23/2024 | Permit Issued | FREEDOM ELECTRIC & DATA | General Wiring |
| 11/18/2022 | Complete | NASH ELECTRIC SERVICES IN | — |
| 11/07/2022 | Complete | SOLEIRE ELECL SOLTNS CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Permit Issued | SATO CONSTRUCTION CO. INC | 1 scope_items |
| 07/21/2026 | Signed-off | W.J. REGAN & COMPANY LLC | Concrete |
| 04/01/2024 | Signed-off | J. CAIAZZO PLBG & HTG COR | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Permit Issued | SATO CONSTRUCTION CO. INC | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| PIEDMONT OFFICE REALTY TRUST | 95 | 09/13/2026 |
| PIEDMONT OFFICE MANAGEMENT | 228 | 07/08/2026 |
| PLATINUM SERVICES NY | 4 | 07/08/2026 |
| PLAZA CONSTRUCTION | 13 | 07/08/2026 |
| UPGRADE SERVICES | 8 | 04/09/2026 |
| SW CONTRACTING AND CONSULTING | 5 | 03/22/2026 |
| PIEDMONT 60 BROAD STREET, LLC | 48 | 03/22/2026 |
| WELLS 60 BROAD STREET | 142 | 03/22/2026 |
| PIEMONT 60 BROAD STREET,L | 1 | 03/22/2026 |
| CRG MANAGEMENT | 45 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MORRIS ADJMI ARCHITECTS | 8 | 07/21/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 12 | 12/22/2025 |
| JACK GREEN ASSOCIATES | 28 | 11/17/2025 |
| SKYLINE RIGGING | 2 | 05/21/2025 |
| DIAZ ARCHITECTS INC.,PA | 2 | 02/20/2025 |
| ZELTA DESIGN | 2 | 09/10/2024 |
| TULLER/MCNEALUS/FELD | 3 | 05/22/2024 |
| ASHRAF CORP | 1 | 04/02/2024 |
| LBI, LLC | 2 | 04/01/2024 |
| CORTLAND MORGAN, ARCHITECT, AIA | 1 | 04/01/2024 |
| NEW AGE ENGINEERING PLLC | 1 | 02/06/2024 |
| AMM ENGINEERING PC | 2 | 02/14/2023 |
| SYSKA HENNESSY GROUP | 13 | 10/25/2022 |
| GILSANZ MURRAY STEFICEK LLP | 9 | 06/14/2022 |
| ROBERT DERECTOR ASSOCIATES | 7 | 06/14/2022 |
| MARCY ENGINEERING, PLLC | 1 | 12/03/2021 |
| GREEN DESIGN | 2 | 04/21/2021 |
| GENSLER | 2 | 11/19/2020 |
| NEWTEC ENGINEERING | 1 | 10/16/2020 |
| VALERIO ASSOCIATES P.C. | 1 | 04/20/2020 |
| ASIF JAMIL, RA | 2 | 02/12/2020 |
| LILKER ASSOCIATES CONSULTING ENGINE | 3 | 12/20/2019 |
| PATUXENT ENGINEERING LLC | 1 | 11/11/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| JM ZONING, LLC. | 16 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 22 | 03/21/2026 |
| EA DESIGN GROUP | 42 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 8 | 03/21/2026 |
| MBE CODE & ZONING LLC | 2 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 6 | 03/21/2026 |
| SATO CONSTRUCTION | 6 | 03/21/2026 |
| EPAC BUILDING CONSULTING INC | 4 | 03/21/2026 |
| RIGGING CONSULTANTS | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 56 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PLAZA CONSTRUCTION LLC | General Contractor | 20 | 07/08/2026 |
| ALLERTONFOX CONSTRUCTION | General Contractor | 13 | 07/08/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 11 | 07/08/2026 |
| CORE FOUR CONSTRUCTION IN | General Contractor | 8 | 07/08/2026 |
| METROCITY GROUP,INC | Plumbing | 8 | 07/08/2026 |
| TRISTATE AIR CONDITIONING | General Contractor | 6 | 03/21/2026 |
| METRO FIRE PROTECTION INC | Fire Protection | 6 | 07/08/2026 |
| STANDARD FIRE SUPP CORP | Fire Protection | 5 | 07/08/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 5 | 04/09/2026 |
| GEORGE BRESLAW PLBNG LLC | Plumbing | 4 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 4 | 07/08/2026 |
| A + SPRINKLER CORP | Fire Protection | 4 | 07/08/2026 |
| W.J. REGAN & COMPANY LLC | General Contractor | 3 | 07/08/2026 |
| STANDARD FIRE PROTECT LLC | Fire Protection | 3 | 07/08/2026 |
| TOM RECTENWALD CONSTRUCTI | General Contractor | 3 | 07/08/2026 |
| SW CONTRACTING AND CONSUL | General Contractor | 3 | 03/21/2026 |
| WILLIAM C. GERAKARIS P&H | Plumbing | 3 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 2 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 07/08/2026 |
| SATO CONSTRUCTION CO.INC | General Contractor | 2 | 03/21/2026 |
| UPGRADE SERVICES LLC | General Contractor | 2 | 03/21/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 2 | 07/08/2026 |
| MATTHEW DETORE | Electrical | 2 | 03/21/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PROJECT TACTICAL SOLUTION | 5859 | 2 | 07/21/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 4 | 12/22/2025 |
| JACK GREEN ASSOCIATES | 422 | 34 | 11/17/2025 |
| SKYLINE RIGGING | 7880 | 1 | 05/21/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 2 | 02/20/2025 |
| FRAMEWORK ENGINEERING PC | 8217 | 4 | 09/19/2024 |
| ZELTA INSPECT LLC | 7764 | 1 | 09/10/2024 |
| RYAN SPECIAL ENGINEERING | 2018 | 2 | 04/01/2024 |
| NEW AGE ENGINEERING PLLC | 7746 | 1 | 02/06/2024 |
| SPECIAL INSPECTION SERVIC | 1200 | 24 | 10/25/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | SATO CONSTRUCTION CO. INC | 08/14/2026 |
| DOB NOW | General Construction | Signed-off | W.J. REGAN & COMPANY LLC | 01/26/2026 |
| DOB NOW | Structural | Signed-off | W.J. REGAN & COMPANY LLC | 01/23/2026 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 12/30/2025 |
| DOB NOW | Sprinklers | Permit Issued | SKH MECHANICAL CORP | 12/29/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | NUCOR CONSTRUCTION CORP | 12/24/2025 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 12/24/2025 |
| DOB NOW | Sprinklers | Signed-off | SHAMROCK MECHANICAL INC | 07/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | NUCOR CONSTRUCTION CORP | 06/30/2025 |
| DOB NOW | Plumbing | Signed-off | DV PLUMBING INC | 06/24/2025 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 06/16/2025 |
| DOB NOW | Plumbing | Signed-off | A + SPRINKLER CORP | 06/16/2025 |
| DOB NOW | General Construction | Signed-off | NUCOR CONSTRUCTION CORP | 06/05/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | UPGRADE SERVICES LLC | 05/21/2025 |
| DOB NOW | General Construction | Signed-off | W.J. REGAN & COMPANY LLC | 01/23/2025 |
| DOB NOW | General Construction | Signed-off | ALL AMERICAN CONSTRUCTION | 12/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 10/24/2024 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 10/24/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 10/23/2024 |
| DOB NOW | Sprinklers | Signed-off | A&A PLUMBING CORP | 10/21/2024 |
| DOB NOW | General Construction | Signed-off | PLAZA CONSTRUCTION LLC | 10/03/2024 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 10/01/2024 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 10/01/2024 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 10/01/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | SATO CONSTRUCTION CO. INC | 09/27/2024 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 08/29/2024 |
| DOB NOW | Plumbing | Signed-off | A + SPRINKLER CORP | 07/11/2024 |
| DOB NOW | Sprinklers | Signed-off | A&H PLUMBING,LLC | 07/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 06/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ALLERTONFOX CONSTRUCTION | 06/12/2024 |
| DOB NOW | Plumbing | Signed-off | STANDARD FIRE SUPP CORP | 06/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ALLERTONFOX CONSTRUCTION | 06/04/2024 |
| DOB NOW | General Construction | Permit Issued | ALLERTONFOX CONSTRUCTION | 06/04/2024 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 05/30/2024 |
| DOB NOW | General Construction | Signed-off | ALLERTONFOX CONSTRUCTION | 05/23/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | SATO CONSTRUCTION CO. INC | 05/23/2024 |
| DOB NOW | Plumbing | Signed-off | J. CAIAZZO PLBG & HTG COR | 05/03/2024 |
| DOB NOW | General Construction | Signed-off | SATO CONSTRUCTION CO.INC | 04/23/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | SATO CONSTRUCTION CO. INC | 04/16/2024 |
| DOB NOW | General Construction | Permit Issued | ARTUR HOME IMPROVEMENT | 04/05/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/07/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/01/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/27/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/05/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/19/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/17/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/01/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/01/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/29/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/31/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/29/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/07/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/06/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/13/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/25/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/10/2026 | Concrete - Cast-In-Place | Max Lee | special |
| 07/10/2026 | Structural Steel - Details | Max Lee | special |
| 07/10/2026 | Interior lighting power | Morris Adjmi | energy_progress |
| 07/10/2026 | Structural Steel - Welding | Max Lee | special |
| 07/10/2026 | Energy Code Compliance Inspections | Morris Adjmi | progress |
| 07/10/2026 | Final | Morris Adjmi | progress |
| 07/10/2026 | Fire-Resistance Rated Construction | Morris Adjmi | progress |
| 12/16/2025 | Duct leakage testing, insulation and design | JONAR MADRIAGA | energy_progress |
| 12/16/2025 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 12/16/2025 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 12/16/2025 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 12/12/2025 | Post-installed Anchors | JONAR MADRIAGA | special |
| 12/12/2025 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 12/11/2025 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 12/09/2025 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 12/09/2025 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 12/09/2025 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 12/09/2025 | Metering | JONAR MADRIAGA | energy_progress |
| 12/09/2025 | Final | JONAR MADRIAGA | progress |
| 12/04/2025 | Final | JONAR MADRIAGA | progress |
| 12/04/2025 | Mechanical Systems | JONAR MADRIAGA | special |
| 11/19/2025 | Sprinkler Systems | JACK GREEN | special |
| 11/19/2025 | Fire-Resistant Penetrations and Joints | JACK GREEN | special |
| 09/19/2025 | Maintenance information | JACK GREEN | energy_progress |
| 09/19/2025 | Duct leakage testing, insulation and design | JACK GREEN | energy_progress |