← Back
Over six families without stores
60 BUCHANAN PLACE
BRONX · BIN 2014510
💬 Discuss this project
2024Year Built
4Stories
C1Building Class
R7-1Zoning
7,512 sfGross Floor Area
14Units
Rent Stabilized1 Open Violation ▸
Over six families without stores · Owner of record: 60 BUCHANAN PLACE, LLC · 2,900 sf lot · 2.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof13p · 2 filings · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHEKO3207/08/2026
60 BUCHANAN2407/08/2026
RELIABLE ENTERPRISES407/08/2026
61BUCHANANLLC303/22/2026
PEEPS SERVICES103/22/2026
60BUCHANANLLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/01/2023$765K—60 BUCHANAN, LLC → 60 BUCHANAN PLACE, LLC— not available
12/16/2021$630K—Private party → 60 BUCHANAN LLC— not available
11/15/2013$350K—R8 ASSETS INC. → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C2B ARCHITECTS PC1410/07/2025
MJE PROFESSIONAL SERVICES107/30/2024
WEST HUDSON ENGINEERING P.C.205/13/2024
SOUTH BAY ENGINEERING PLLC105/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FIORE ENGINEERING303/21/2026
JM CONSULTING ENGINEERS1403/21/2026
C2B ARCHITECTS403/21/2026
SNR EXPEDITING DESIGN203/21/2026
TREASURE BOX SERVICES203/21/2026
EXPEDITE DEM203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PEEPS SERVICES INCGeneral Contractor1607/08/2026
R & A REMODELING LLCGeneral Contractor203/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MARTINEZ ELECTRICAL CONTElectrical103/22/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC42881810/07/2025
ANTHONY CUCICH ARCHITECT6081401/06/2025
Building Lifecycle
All (138)Filed (18)Permit Issued (11)Signed Off (8)Violation (1)Inspection (15)Objection (52)Special Inspection (30)Tax Incentive (3)
11/20/2025
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM FOR 4 STORY NEW RESIDENTIAL BUILDING IN CONJUNCTION WITH NB#X00750879,
X00750879-I1
10/07/2025
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM FOR 4 STORY NEW RESIDENTIAL BUILDING IN CONJUNCTION WITH NB#X00750879,
X00750879-P7
10/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBERT DYER
10/07/2025
Special inspection requirement — Vestibules
SEBERT DYER
10/07/2025
Special inspection requirement — Insulation placement and R values
SEBERT DYER
10/07/2025
Special inspection requirement — Protection of exposed foundation insulation
SEBERT DYER
10/07/2025
Special inspection requirement — Lighting controls
SEBERT DYER
10/07/2025
Special inspection requirement — Exterior lighting power
SEBERT DYER
10/07/2025
Special inspection requirement — Maintenance information
SEBERT DYER
10/07/2025
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
10/07/2025
Special inspection requirement — Interior lighting power
SEBERT DYER
10/07/2025
Special inspection requirement — Metering
SEBERT DYER
10/07/2025
Special inspection requirement — Air barrier — testing
SEBERT DYER
10/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBERT DYER
10/07/2025
Special inspection requirement — Shutoff dampers
SEBERT DYER
10/07/2025
Special inspection requirement — Lighting in dwelling units
SEBERT DYER
10/07/2025
Special inspection requirement — Mechanical Systems
SEBERT DYER
10/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
SEBERT DYER
10/07/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SEBERT DYER
10/07/2025
Special inspection requirement — Masonry
SEBERT DYER
10/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBERT DYER
10/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
10/07/2025
Special inspection requirement — Final
SEBERT DYER
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
10/07/2025
Special inspection requirement — Fenestration air leakage
SEBERT DYER
10/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
SEBERT DYER
10/07/2025
Special inspection requirement — Fenestration areas
SEBERT DYER
10/07/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SEBERT DYER
10/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
SEBERT DYER
10/07/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SEBERT DYER
05/05/2025
Signed off — Alteration
PROPOSED FOUNDATION AND STRUCTURAL WORK IN CONNECTION WITH NB X00750879 as per submitted plans.
X00779582-I1
05/02/2025
Special inspection requirement — Structural Steel - Welding
SEBERT DYER
04/28/2025
Filed — Alteration
PROPOSED FOUNDATION AND STRUCTURAL WORK IN CONNECTION WITH NB X00750879 as per submitted plans.
X00779582-P5
04/16/2025
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM FOR 4 STORY NEW RESIDENTIAL BUILDING IN CONJUNCTION WITH NB#X00750879,
X00750879-S2
04/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/21/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/14/2025
Signed off — New Building
INSTALL NEW SPRINKLER SYSTEM FOR 4 STORY NEW RESIDENTIAL BUILDING IN CONJUNCTION WITH NB#X00750879,
X00750879-S1
03/12/2025
Permit issued — Plumbing
X00750879-S2-PL
03/12/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/04/2025
485-x construction completed
03/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/21/2025
Objection resolved — Addressed
01/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/10/2025
Objection raised — Admin
01/06/2025
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM FOR 4 STORY NEW RESIDENTIAL BUILDING IN CONJUNCTION WITH NB#X00750879,
X00750879-P6
01/06/2025
Filed — Alteration
PROPOSED FOUNDATION AND STRUCTURAL WORK IN CONNECTION WITH NB X00750879 as per submitted plans.
X00779582-P2
01/06/2025
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM FOR 4 STORY NEW RESIDENTIAL BUILDING IN CONJUNCTION WITH NB#X00750879,
X00750879-P4
01/02/2025
Signed off — Alteration
APPLICATION FILED FOR EARTHWORK IN CONJUCTION WITH NEW BUILDING APPLICATION #X00750879.
X01045915-I1
01/02/2025
Signed off — Alteration
APPLICATION FILED FOR EARTHWORK IN CONJUCTION WITH NEW BUILDING APPLICATION #X00750879.
X01045915-S2
01/02/2025
Filed — New Building
INSTALL NEW SPRINKLER SYSTEM FOR 4 STORY NEW RESIDENTIAL BUILDING IN CONJUNCTION WITH NB#X00750879,
X00750879-P5
12/19/2024
Signed off — Alteration
X00876052-I1
12/19/2024
Permit issued — General Construction
X00750879-I1-GC-CX
11/08/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01087685-I1
11/07/2024
485-x registration filed
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT03/12/2025
DOB NOWGeneral ConstructionPermit IssuedR A REMODELING12/19/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC10/01/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC08/13/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC07/31/2024
DOB NOWMechanical SystemsPermit IssuedPEEPS SERVICES INC07/24/2024
DOB NOWGeneral ConstructionSigned-offPEEPS SERVICES INC07/24/2024
DOB NOWEarth WorkSigned-offPEEPS SERVICES INC05/28/2024
DOB NOWSupport of ExcavationSigned-offPEEPS SERVICES INC05/16/2024
DOB NOWConstruction FenceSigned-offPEEPS SERVICES INC05/16/2024
DOB NOWConstruction FenceSigned-offPEEPS SERVICES INC05/23/2023
BISEQISSUEDPEEPS SERVICES INC05/30/2023
BIS—ISSUEDPEEPS SERVICES INC05/30/2023
1 job · most recent 10/07/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/07/2025Permit IssuedR & A REMODELING LLCHeating and Air Conditioning Systems
Heat / Cool
Gree MODEL #3V1R12HP230V1B0 12,000 BTU · Split System ×45
MODEL #3V1R12HP230V1AO 15,013 BTU · Split System ×13
MULTI24HP230V1A 24,000 BTU · Split System ×1
Model # MULTI24HP230V1A 15,013 BTU · Vrf Outdoor ×1
1 job · most recent 10/07/2025
Sprinkler System
FiledStatusContractorScope
10/07/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 job · most recent 10/07/2025
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
10/07/2025Signed-offHORBRIDGE PLUMBING & HEATPlumbing-Sprinkler, Storm, Water/Sanitary
3 jobs · most recent 02/19/2025
General Wiring
FiledStatusContractorScope
02/19/2025CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
08/30/2024CompleteMARTINEZ ELECTRICAL CONT—
07/30/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/12/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/29/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/28/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
10/07/2025Fire-Resistant Penetrations and JointsSEBERT DYERspecial
10/07/2025Fenestration areasSEBERT DYERenergy_progress
10/07/2025HVAC-R and service water heating system controlsSEBERT DYERenergy_progress
10/07/2025Fire-Resistance Rated ConstructionSEBERT DYERprogress
10/07/2025FinalSEBERT DYERprogress
10/07/2025Energy Code Compliance InspectionsSEBERT DYERprogress
10/07/2025Structural Stability – Alterations of existing buildingsSEBERT DYERspecial
10/07/2025Mechanical SystemsSEBERT DYERspecial
10/07/2025Mastic and Intumescent Fire-resistant CoatingsSEBERT DYERspecial
10/07/2025MasonrySEBERT DYERspecial
10/07/2025Duct leakage testing, insulation and designSEBERT DYERenergy_progress
10/07/2025Exterior Insulation and Finish Systems (EIFS)SEBERT DYERspecial
10/07/2025Construction Operations Influencing Adjacent StructuresSEBERT DYERspecial
10/07/2025VestibulesSEBERT DYERenergy_progress
10/07/2025Exterior lighting powerSEBERT DYERenergy_progress
10/07/2025Shutoff dampersSEBERT DYERenergy_progress
10/07/2025Lighting controlsSEBERT DYERenergy_progress
10/07/2025HVAC-R and service water piping design and insulationSEBERT DYERenergy_progress
10/07/2025Fenestration and door U-factor and product ratingsSEBERT DYERenergy_progress
10/07/2025Protection of exposed foundation insulationSEBERT DYERenergy_progress
10/07/2025MeteringSEBERT DYERenergy_progress
10/07/2025Interior lighting powerSEBERT DYERenergy_progress
10/07/2025Insulation placement and R valuesSEBERT DYERenergy_progress
10/07/2025Air barrier - visual inspectionSEBERT DYERenergy_progress
10/07/2025Maintenance informationSEBERT DYERenergy_progress
Latest 25 of 123.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/23/2026X00876052-I1Request digital key ↗
08/21/2026X00779582-P5Request digital key ↗
08/21/2026X00779582-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
04/15/2025240361103Open ↗
03/08/2022220741525Open ↗
▸BISWORK PERMIT APPLICATION2
06/02/2023220741525Open ↗
06/02/2023220741525Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00750879-I1Open ↗
08/13/2026X00750879-P4Open ↗
08/13/2026X00750879-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00750879-I1Open ↗
▸Seals & Professional Certifications126
▸DOB NOWSpecial Inspector Seal & Signature53
09/18/2026X00779582-P2Open ↗
09/18/2026X00779582-P2Open ↗
09/18/2026X00779582-P2Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature53
09/18/2026X00779582-P2Open ↗
09/18/2026X00779582-P2Open ↗
09/18/2026X00779582-P2Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/23/2026X00876052-I1Open ↗
08/21/2026X00779582-I1Open ↗
08/21/2026X00779582-P5Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/15/2025240361103Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/02/2023220741525Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00750879-I1Open ↗
08/13/2026X00750879-P4Open ↗
08/13/2026X00750879-P7Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRIC CUT-OFF1
06/02/2023220741525Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
06/02/2023220741525Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/13/2026X00750879-P1Open ↗
08/13/2026X00750879-I1Open ↗
08/13/2026X00750879-P7Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/05/2023220741525Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/02/2023220741525Open ↗
▸BISSTREET TREE CHECKLIST1
04/15/2025240361103Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/02/2023220741525Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00750879-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00750879-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00750879-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/02/2023220741525Open ↗
▸BISRODENT CONTROL1
06/02/2023220741525Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00750879-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/13/2026X00779582-I1Open ↗
08/13/2026X00779582-P5Open ↗
08/13/2026X00779582-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/15/2025240361103Open ↗
04/15/2025240361103Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00779582-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/05/2023220741525Open ↗
06/05/2023220741525Open ↗
06/05/2023220741525Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/18/2025240361103Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/02/2023220741525Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
06/02/2023220741525Open ↗
03/08/2022220741525Open ↗
▸BISEFILING COVER SHEET1
03/08/2022220741525Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/15/2025240361103Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial4
08/13/2026X00750879-P4Open ↗
08/13/2026X00750879-P7Open ↗
08/13/2026X00750879-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00750879-I1Open ↗
08/13/2026X00750879-P1Open ↗
08/13/2026X00750879-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026X00750879-P7Open ↗
08/21/2026X00750879-P4Open ↗
08/21/2026X00750879-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01045915-S2Open ↗
08/13/2026X01045915-I1Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
04/15/2025240361103Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
04/15/2025240361103Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
06/05/2023220741525Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/15/2025240361103Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/15/2025240361103Open ↗
▸BISBPP: FILING REQUIRED1
04/15/2025240361103Open ↗
▸BISBPP: NOTES REQUIRED ON PLAN1
04/15/2025240361103Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00750879-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X01045915-I1Open ↗