← Back
Unlicensed parking lot
CENTRAL AVENUE
BROOKLYN · BIN 3429928
💬 Discuss this project
0Year Built
—Stories
G7Building Class
M3-1Zoning
0 sfGross Floor Area
0Units
Unlicensed parking lot · Owner of record: DOWNTOWN REAL PROPERTIES LLC · 15,134 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
Floor 1Under Construction1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60 CENTRAL ENERGY STORAGE 2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.803/21/2026
JAM CONSULTANTS, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRACE INDUSTRIES LLCGeneral Contractor504/09/2026
WELKIN FIRE PROTECTION LLFire Protection108/10/2026
WELKIN ENTERPRISES,LLCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003403/30/2026
GTA ENGINEERING SERVICES2940212/15/2025
Building Lifecycle
All (70)Filed (12)Permit Issued (6)Inspection (4)Objection (21)Special Inspection (27)
07/07/2026
Permit issued — Sprinklers
B01340833-I1-EW-SP
06/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/05/2026
Special inspection requirement — Final
Christopher Drutjons
04/24/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/13/2026
Filed — Alteration
Electric Energy Storage Equipment filing related to NB application B01111425-I1.
B01241317-P1
04/06/2026
Special inspection requirement — Final
Christopher Drutjons
03/30/2026
Filed — Alteration
THE SCOPE OF WORK IS TO PROVIDE A MANUAL DRY OPEN NOZZLESYSTEM FOR THE ENERGY STORAGE SYSTEM AT 52 CENTRAL AVENUE
B01340833-I1
03/30/2026
Filed — Alteration
Curb Cut for battery energy storage system as per plans filed herewith.
B01366343-I1
03/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/24/2026
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-P3
01/15/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/06/2026
Permit issued — Structural
B01111425-S5-ST
12/30/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
12/24/2025
Special inspection requirement — Footing and Foundation
Christopher Drutjons
12/24/2025
Special inspection requirement — Concrete - Cast-In-Place
Christopher Drutjons
12/24/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBERT DYKSTRA
12/24/2025
Special inspection requirement — Final
Christopher Drutjons
12/23/2025
Permit issued — General Construction
B01111425-I1-GC
12/15/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-P2
12/15/2025
Special inspection requirement — Insulation placement and R values
Christopher Drutjons
12/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Christopher Drutjons
12/15/2025
Special inspection requirement — Air barrier - visual inspection
Christopher Drutjons
12/15/2025
Special inspection requirement — Fenestration areas
Christopher Drutjons
12/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Drutjons
12/15/2025
Special inspection requirement — Fenestration air leakage
Christopher Drutjons
12/12/2025
Objection resolved — Addressed
12/08/2025
Permit issued — Plumbing
B01111425-S6-PL
11/06/2025
Objection raised — Energy
11/05/2025
Permit issued — Construction Fence
B01294394-I1-FN
11/04/2025
Filed — Alteration
B01294394-I1
11/04/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-P1
10/30/2025
Special inspection requirement — Fenestration air leakage
Christopher Drutjons
10/30/2025
Special inspection requirement — Fenestration areas
Christopher Drutjons
10/30/2025
Special inspection requirement — Air barrier - visual inspection
Christopher Drutjons
10/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Drutjons
10/30/2025
Special inspection requirement — Insulation placement and R values
Christopher Drutjons
10/30/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
10/24/2025
Permit issued — Foundation
B01111425-S4-FO
10/20/2025
Objection resolved — Addressed
10/09/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-S5
10/09/2025
Special inspection requirement — Masonry
Christopher Drutjons
10/09/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Christopher Drutjons
10/09/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
10/08/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-S6
10/08/2025
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
10/08/2025
Special inspection requirement — Structural Cold-Formed Steel
Christopher Drutjons
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedWELKIN FIRE PROTECTION LL07/07/2026
DOB NOWStructuralPermit IssuedGRACE INDUSTRIES LLC01/06/2026
DOB NOWGeneral ConstructionPermit IssuedGRACE INDUSTRIES LLC12/23/2025
DOB NOWPlumbingPermit IssuedWELKIN ENTERPRISES,LLC12/08/2025
DOB NOWConstruction FencePermit IssuedGRACE INDUSTRIES LLC11/05/2025
DOB NOWFoundationPermit IssuedGRACE INDUSTRIES LLC10/24/2025
1 project · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026Permit IssuedWELKIN FIRE PROTECTION LL32 heads
2 projects · most recent 03/30/2026
Storm
FiledStatusContractorScope
03/30/2026———
02/24/2026Permit IssuedWELKIN ENTERPRISES,LLCStorm
1 project · most recent 12/29/2025
General Wiring
FiledStatusContractorScope
12/29/2025Permit IssuedHAUGLAND ENERGY GROUP LLCGeneral Wiring
2 projects · most recent 04/13/2026
Steel Masonry
FiledStatusContractorScope
04/13/2026——2 scope_items
02/24/2026Permit IssuedGRACE INDUSTRIES LLCSteel, Masonry
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/05/2026FinalChristopher Drutjonsprogress
04/06/2026FinalChristopher Drutjonsprogress
03/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/15/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
12/30/2025Sprinkler SystemsChristopher Drutjonsspecial
12/24/2025Footing and FoundationChristopher Drutjonsprogress
12/24/2025Concrete - Cast-In-PlaceChristopher Drutjonsspecial
12/24/2025Subsurface Conditions – Fill Placement & In-Place DensityROBERT DYKSTRAspecial
12/24/2025FinalChristopher Drutjonsprogress
12/15/2025Insulation placement and R valuesChristopher Drutjonsenergy_progress
12/15/2025Alternative Materials - OTCR Buildings Bulletin NumberChristopher Drutjonsspecial
12/15/2025Air barrier - visual inspectionChristopher Drutjonsenergy_progress
12/15/2025Fenestration areasChristopher Drutjonsenergy_progress
12/15/2025Fenestration and door U-factor and product ratingsChristopher Drutjonsenergy_progress
12/15/2025Fenestration air leakageChristopher Drutjonsenergy_progress
10/30/2025Fenestration air leakageChristopher Drutjonsenergy_progress
10/30/2025Fenestration areasChristopher Drutjonsenergy_progress
10/30/2025Air barrier - visual inspectionChristopher Drutjonsenergy_progress
10/30/2025Fenestration and door U-factor and product ratingsChristopher Drutjonsenergy_progress
10/30/2025Insulation placement and R valuesChristopher Drutjonsenergy_progress
10/30/2025Alternative Materials - OTCR Buildings Bulletin Number—special
10/09/2025MasonryChristopher Drutjonsspecial
10/09/2025Structural Steel - High Strength BoltingChristopher Drutjonsspecial
10/09/2025Post-installed AnchorsChristopher Drutjonsspecial
10/08/2025Structural Steel - DetailsChristopher Drutjonsspecial
Latest 25 of 27.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026B01241317-I1Request digital key ↗
08/21/2026B01241317-P1Request digital key ↗
08/20/2026B01111425-S6Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
02/17/2026322122868Open ↗
06/03/2025322121388Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
11/26/2025322122868Open ↗
05/20/2025322121388Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01111425-P1Open ↗
08/13/2026B01111425-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01111425-P1Open ↗
08/13/2026B01111425-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026B01241317-P1Open ↗
08/20/2026B01111425-I1Open ↗
08/20/2026B01111425-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01111425-S4Open ↗
09/02/2026B01111425-S4Open ↗
09/01/2026B01111425-S5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B01111425-S4Open ↗
09/01/2026B01111425-S5Open ↗
08/31/2026B01241317-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01111425-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01111425-P1Open ↗
08/13/2026B01111425-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWOTCR Letter of Conditional Acceptance1
08/13/2026B01241317-I1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/21/2026B01241317-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/20/2025322121388Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026B01111425-I1Open ↗
08/13/2026B01111425-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026B01111425-P1Open ↗
08/20/2026B01111425-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01111425-I1Open ↗
08/13/2026B01111425-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01111425-I1Open ↗