← Back
BuildNYC
Unlicensed parking lot
60 CENTRAL AVENUE
BROOKLYN · BIN 3429928
💬 Discuss this project
0Year Built
—Stories
G7Building Class
M3-1Zoning
0 sfGross Floor Area
0Units
Unlicensed parking lot · Owner of record: Downtown Real Properties · 15,134 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofConvergent Energy & PowerUnder Construction2p · 1 filing · 20 docs
Floor 1Convergent Energy & PowerUnder Construction3 filings · 13 docs
Site & exteriorConvergent Energy & PowerUnder Construction40p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60 Central Energy Storage 2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants803/21/2026
K & M Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Grace IndustriesGeneral Contractor404/09/2026
Grace IndustriesScaffold104/09/2026
Welkin EnterprisesPlumbing106/28/2026
Welkin Fire ProtectionFire Protection108/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants2003403/30/2026
Gta Engineering Services2940212/15/2025
Building Lifecycle
All (67)Filed (12)Permit Issued (6)Inspection (1)Objection (21)Special Inspection (27)
07/07/2026
Permit issued — Sprinklers
B01340833-I1-EW-SP
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/05/2026
Special inspection requirement — Final
Christopher Drutjons
04/24/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Other
04/13/2026
Filed — Alteration
Electric Energy Storage Equipment filing related to NB application B01111425-I1.
B01241317-P1
04/06/2026
Special inspection requirement — Final
Christopher Drutjons
03/30/2026
Filed — Alteration
THE SCOPE OF WORK IS TO PROVIDE A MANUAL DRY OPEN NOZZLESYSTEM FOR THE ENERGY STORAGE SYSTEM AT 52 CENTRAL AVENUE
B01340833-I1
03/30/2026
Filed — Alteration
Curb Cut for battery energy storage system as per plans filed herewith.
B01366343-I1
03/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/24/2026
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-P3
01/15/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/06/2026
Permit issued — Structural
B01111425-S5-ST
12/30/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
12/24/2025
Special inspection requirement — Final
Christopher Drutjons
12/24/2025
Special inspection requirement — Footing and Foundation
Christopher Drutjons
12/24/2025
Special inspection requirement — Concrete - Cast-In-Place
Christopher Drutjons
12/24/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBERT DYKSTRA
12/23/2025
Permit issued — General Construction
B01111425-I1-GC
12/15/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-P2
12/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Christopher Drutjons
12/15/2025
Special inspection requirement — Air barrier - visual inspection
Christopher Drutjons
12/15/2025
Special inspection requirement — Fenestration areas
Christopher Drutjons
12/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Drutjons
12/15/2025
Special inspection requirement — Fenestration air leakage
Christopher Drutjons
12/15/2025
Special inspection requirement — Insulation placement and R values
Christopher Drutjons
12/12/2025
Objection resolved — Addressed
12/08/2025
Permit issued — Plumbing
B01111425-S6-PL
11/06/2025
Objection raised — Energy
11/05/2025
Permit issued — Construction Fence
B01294394-I1-FN
11/04/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-P1
11/04/2025
Filed — Alteration
B01294394-I1
10/30/2025
Special inspection requirement — Fenestration air leakage
Christopher Drutjons
10/30/2025
Special inspection requirement — Insulation placement and R values
Christopher Drutjons
10/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Christopher Drutjons
10/30/2025
Special inspection requirement — Air barrier - visual inspection
Christopher Drutjons
10/30/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
10/30/2025
Special inspection requirement — Fenestration areas
Christopher Drutjons
10/24/2025
Permit issued — Foundation
B01111425-S4-FO
10/20/2025
Objection resolved — Addressed
10/09/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-S5
10/09/2025
Special inspection requirement — Masonry
Christopher Drutjons
10/09/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Christopher Drutjons
10/09/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
10/08/2025
Filed — New Building
STRUCTURAL FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. NB APPLICATION #B01111425-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01111425-S6
10/08/2025
Special inspection requirement — Structural Cold-Formed Steel
Christopher Drutjons
10/08/2025
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/08/2025
Special inspection requirement — Final
Christopher Drutjons
08/13/2025
Objection raised — Admin
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedWelkin Fire Protection07/07/2026
DOB NOWStructuralPermit IssuedGrace Industries01/06/2026
DOB NOWGeneral ConstructionPermit IssuedGrace Industries12/23/2025
DOB NOWPlumbingPermit IssuedWelkin Enterprises12/08/2025
DOB NOWConstruction FencePermit IssuedGrace Industries11/05/2025
DOB NOWFoundationPermit IssuedGrace Industries10/24/2025
1 project · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026Permit IssuedWelkin Fire Protection32 heads
2 projects · most recent 03/30/2026
Storm
FiledStatusContractorScope
03/30/2026———
02/24/2026Permit IssuedWelkin EnterprisesStorm
1 project · most recent 12/29/2025
General Wiring
FiledStatusContractorScope
12/29/2025Permit IssuedHaugland Energy GroupGeneral Wiring
2 projects · most recent 04/13/2026
Steel Masonry
FiledStatusContractorScope
04/13/2026——2 scope_items
02/24/2026Permit IssuedGrace IndustriesSteel, Masonry
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/05/2026FinalChristopher Drutjonsprogress
04/06/2026FinalChristopher Drutjonsprogress
03/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/15/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
12/30/2025Sprinkler SystemsChristopher Drutjonsspecial
12/24/2025FinalChristopher Drutjonsprogress
12/24/2025Footing and FoundationChristopher Drutjonsprogress
12/24/2025Concrete - Cast-In-PlaceChristopher Drutjonsspecial
12/24/2025Subsurface Conditions – Fill Placement & In-Place DensityROBERT DYKSTRAspecial
12/15/2025Alternative Materials - OTCR Buildings Bulletin NumberChristopher Drutjonsspecial
12/15/2025Air barrier - visual inspectionChristopher Drutjonsenergy_progress
12/15/2025Fenestration areasChristopher Drutjonsenergy_progress
12/15/2025Fenestration and door U-factor and product ratingsChristopher Drutjonsenergy_progress
12/15/2025Fenestration air leakageChristopher Drutjonsenergy_progress
12/15/2025Insulation placement and R valuesChristopher Drutjonsenergy_progress
10/30/2025Fenestration air leakageChristopher Drutjonsenergy_progress
10/30/2025Insulation placement and R valuesChristopher Drutjonsenergy_progress
10/30/2025Fenestration and door U-factor and product ratingsChristopher Drutjonsenergy_progress
10/30/2025Air barrier - visual inspectionChristopher Drutjonsenergy_progress
10/30/2025Alternative Materials - OTCR Buildings Bulletin Number—special
10/30/2025Fenestration areasChristopher Drutjonsenergy_progress
10/09/2025MasonryChristopher Drutjonsspecial
10/09/2025Structural Steel - High Strength BoltingChristopher Drutjonsspecial
10/09/2025Post-installed AnchorsChristopher Drutjonsspecial
10/08/2025Structural Cold-Formed SteelChristopher Drutjonsspecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Convergent Energy & PowerIndustrial / WarehouseFloor 1
Project B01340833 Alteration · Permit Entire · 03/30/2026
Project B01366343 Alteration · Objections · 03/30/2026
Project B01241317 Alteration · Approved · 08/01/2025
Project B01111425 New Building · Permit Entire · 11/19/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026B01241317-P1Request digital key ↗
08/21/2026B01241317-I1Request digital key ↗
08/20/2026B01111425-S5Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
02/17/2026322122868Open ↗
06/03/2025322121388Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
11/26/2025322122868Open ↗
05/20/2025322121388Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01111425-I1Open ↗
08/13/2026B01111425-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01111425-P1Open ↗
08/13/2026B01111425-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026B01241317-P1Open ↗
08/20/2026B01111425-I1Open ↗
08/20/2026B01111425-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01111425-S4Open ↗
09/02/2026B01111425-S4Open ↗
09/01/2026B01111425-S5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B01111425-S4Open ↗
09/01/2026B01111425-S5Open ↗
08/31/2026B01241317-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01111425-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01111425-I1Open ↗
08/13/2026B01111425-P1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWOTCR Letter of Conditional Acceptance1
08/13/2026B01241317-I1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/21/2026B01241317-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/20/2025322121388Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026B01111425-P1Open ↗
08/13/2026B01111425-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026B01111425-P1Open ↗
08/20/2026B01111425-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01111425-I1Open ↗
08/13/2026B01111425-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01111425-I1Open ↗