← Back
Over six families without stores
60 CLARK STREET
BROOKLYN · Brooklyn Heights · BIN 3001860
💬 Discuss this project
1836Year Built
4Stories
C1Building Class
R7-1Zoning
6,942 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: CD VALENTINE ASSOCIATES LLC · 3,093 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CD VALENTINE ASSOCIATES LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.201/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R. BARONE PLUMBINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947201/27/2021
Building Lifecycle
All (25)Filed (2)Permit Issued (2)Signed Off (2)Violation (7)Special Inspection (12)
06/09/2025
Violation issued (HPD, closed)
A
08/11/2021
Signed off — Alteration
REPLACE TWO (2) BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00448044-I1
08/11/2021
Signed off — Alteration
REGISTER TWO (2) HOT WATER HEATERS AND CONNECT GAS LINE TO HOT WATER HEATERS AND BOILERS. BOILERS FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00449063-I1
02/08/2021
Permit issued — Boiler Equipment
B00448044-I1-BE
02/08/2021
Permit issued — Plumbing
B00449063-I1-PL
01/27/2021
Filed — Alteration
REPLACE TWO (2) BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00448044-I1
01/26/2021
Filed — Alteration
REGISTER TWO (2) HOT WATER HEATERS AND CONNECT GAS LINE TO HOT WATER HEATERS AND BOILERS. BOILERS FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00449063-I1
01/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
01/07/2021
Special inspection requirement — Heating Systems
Gregory Perotto
01/07/2021
Special inspection requirement — Lowest Floor Elevation
Gregory Perotto
01/07/2021
Special inspection requirement — Maintenance information
Gregory Perotto
01/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
01/07/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
01/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
01/07/2021
Special inspection requirement — Energy Code Compliance
Gregory Perotto
01/07/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
01/07/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
01/07/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
01/07/2021
Special inspection requirement — Maintenance information
Gregory Perotto
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offR. BARONE PLUMBING02/08/2021
DOB NOWPlumbingSigned-offR. BARONE PLUMBING02/08/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
01/07/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
01/07/2021Heating SystemsGregory Perottospecial
01/07/2021Lowest Floor ElevationGregory Perottoprogress
01/07/2021Maintenance informationGregory Perottoenergy_progress
01/07/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
01/07/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
01/07/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
01/07/2021Energy Code ComplianceGregory Perottoprogress
01/07/2021HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
01/07/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
01/07/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
01/07/2021Maintenance informationGregory Perottoenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00449063-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/01/2026B00448044-I1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00448044-I1Open ↗
09/23/2026B00448044-I1Open ↗
09/23/2026B00448044-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00448044-I1Open ↗
09/23/2026B00448044-I1Open ↗
08/22/2026B00449063-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00449063-I1Open ↗
09/01/2026B00448044-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00449063-I1Open ↗
09/01/2026B00448044-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00449063-I1Open ↗
09/01/2026B00448044-I1Open ↗