← Back
Large suburban residence
60 COPPERFLAGG LANE
💬 Discuss this project
1986Year Built
2Stories
A3Building Class
R1-1Zoning
4,666 sfGross Floor Area
1Units
Large suburban residence · 12,154 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS, LLP407/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R.S.F. PLBG & HTG CORP.Plumbing207/08/2026
FICHERA ELECTRIC, INCElectrical103/22/2026
RSF BUILDING CORPGeneral Contractor107/08/2026
Building Lifecycle
All (13)Filed (4)Permit Issued (3)Signed Off (2)Inspection (4)
08/22/2023
Signed off — Alteration
residential gas fired back up generator.
S00820240-I1
08/22/2023
Signed off — Alteration
plumbing work filed in conjunction with residential gas fired back up generator.
S00820241-I1
08/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/12/2023
Filed — Alteration
plumbing work filed in conjunction with residential gas fired back up generator.
S00820241-P2
06/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/14/2023
Permit issued — Plumbing
S00820241-I1-PL
06/13/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/17/2023
Filed — Alteration
plumbing work filed in conjunction with residential gas fired back up generator.
S00820241-P1
03/17/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/02/2023
Permit issued — Plumbing
S00820241-I1-PL
03/02/2023
Permit issued — General Construction
S00820240-I1-GC
02/08/2023
Filed — Alteration
residential gas fired back up generator.
S00820240-I1
02/08/2023
Filed — Alteration
plumbing work filed in conjunction with residential gas fired back up generator.
S00820241-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offR.S.F. PLBG & HTG CORP.06/14/2023
DOB NOWPlumbingSigned-offR.S.F. PLBG & HTG CORP.03/02/2023
DOB NOWGeneral ConstructionSigned-offRSF BUILDING CORP03/02/2023
1 project · most recent 10/27/2022
General Wiring
FiledStatusContractorScope
10/27/2022CompleteFICHERA ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/17/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00820240-I1Request digital key ↗
08/23/2026S00820241-I1Request digital key ↗
08/23/2026S00820241-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00820240-I1Open ↗
08/23/2026S00820241-P1Open ↗
08/23/2026S00820241-P2Open ↗
Showing 3 of 4 on file for this type