RoofUnder Construction14p · 7 filings · 20 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems
Structural modification taking place on floors 23-26 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 19TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 10 drawing sheets
MODIFICATIONS TAKING PLACE ON THE FACADE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 3 docs
Equipment
Suspended Scaffold as shown on plans
On file for this project
3 documents · 1 drawing sheet
Floor 5512p · 3 filings · 18 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
New sprinkler distribution per new architectural layout and new pantries and ADA bathrooms.
On file for this project
8 documents · 4 drawing sheets
Partial floor interior demolition and interior alteration consisted of private offices, open workstation areas and pantry. Project is professional self -certified. No change in use group, egress or occupancy.
On file for this project
6 documents · 5 drawing sheets
Distribution of underfloor air system off existing fan powered boxes. No change to use, egress or occupancy
On file for this project
4 documents · 3 drawing sheets
Floor 548p · 1 filing · 8 docs
ArchitectureGeneralOther
GENERAL CONSTRUCTION TAKING PLACE ON THE 54TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 8 drawing sheets
Floor 536p · 3 filings · 12 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
MECHANICAL MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 52Under Construction1p · 5 filings · 11 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
PLUMBING WORK TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
GENERAL CONSTRUCTION TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Project M01435760Permit Issued · 08/31/2026
MECHANICAL WORK TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents
Latest 3 of 5 filings on this floor.
Floor 515p · 5 filings · 20 docs
DMFire ProtectionMechanicalStructural
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications taking place on the 51st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 1 drawing sheet
General Construction taking place on the 51st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 5015p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
PLUMBING MODIFICATIONS TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 3 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4918p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 49TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 4 drawing sheets
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 49TH AND 50TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 49TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 48
Floor 472p · 1 filing · 6 docs
Mechanical
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 46TH AND 47TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Floor 462p · 1 filing · 6 docs
Mechanical
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 46TH AND 47TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Floor 45
Floor 4415p · 4 filings · 18 docs
ArchitectureFire ProtectionMechanicalPlumbing
General plumbing work taking place on the 44th floor as per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
General plumbing modifications taking place on the 44th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 4 drawing sheets
General sprinkler modifications taking place on the 44th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 431p · 1 filing · 8 docs
Mechanical
General mechanical work taking place on the 44th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Floor 42
Floor 4112p · 4 filings · 15 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 41ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 41ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 41ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 40
Floor 39
Floor 381p · 1 filing · 7 docs
Architecture
General Construction taking place on the 38th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 37
Floor 363p · 2 filings · 12 docs
MechanicalStructural
General mechanical modifications taking place on the 36th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
General sprinkler modifications taking place on the 36th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 35
Floor 341p · 1 filing · 4 docs
ArchitectureFire Protection
Sprinkler modifications taking place on the 34th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 33
Floor 32
Floor 3112p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbing
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 301p · 1 filing · 9 docs
ArchitectureDMFire ProtectionGeneral
General sprinkler work taking place on the 30th floor as per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 1 drawing sheet
Floor 294p · 2 filings · 15 docs
DMMechanicalStructural
Structural modifications taking place on the 27th and 28th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
7 documents · 2 drawing sheets
Floor 2817p · 5 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Sprinkler modifications taking place on the 27th and 28th floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 5 drawing sheets
General Construction taking place on the 27th and 28th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 2 drawing sheets
Mechanical modifications taking place on the 27th and 28th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 7 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 271p · 1 filing · 6 docs
Mechanical
General Construction taking place on the 27th and 28th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 265p · 3 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Mechanical modifications taking place on the 27th and 28th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 1 drawing sheet
Structural modifications taking place on the 25th and 26th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
11 documents · 3 drawing sheets
General Construction taking place on the 25th and 26th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
19 documents · 1 drawing sheet
Floor 25Under Construction25p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER WORK TAKING PLACE ON THE 25TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON THE 25TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 5 drawing sheets
MECHANICAL WORK TAKING PLACE ON THE 25TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2414p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
Sprinkler modifications taking place on the 23rd and 24th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 2 drawing sheets
Plumbing modifications taking places on floors 21, 22, 23 and 24 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 3 drawing sheets
Mechanical modifications taking place on Floors 23, 24 and Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2311p · 3 filings · 13 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
Sprinkler modifications taking place on the 23rd and 24th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 2 drawing sheets
Plumbing modifications taking places on floors 21, 22, 23 and 24 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 3 drawing sheets
Mechanical modifications taking place on Floors 23, 24 and Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 6 drawing sheets
Floor 228p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Plumbing modifications taking places on floors 21, 22, 23 and 24 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 218p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Structural modifications taking place on the 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2032p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler modifications taking place on the 20th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 3 drawing sheets
Plumbing modifications taking place on the 20th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 2 drawing sheets
General Construction taking place on the 18th, 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 19 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1933p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Standpipe modifications taking place on the 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
10 documents · 2 drawing sheets
Plumbing modifications taking place on the 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
General Construction taking place on the 18th, 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 17 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1813p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 17TH AND 18TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
General Construction taking place on the 18th, 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 6 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 178p · 6 filings · 11 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
Sprinkler modifications taking place on the 17th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 2 drawing sheets
Plumbing modifications taking place on the 17th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 168p · 4 filings · 15 docs
Fire ProtectionMechanicalPlumbing
General Mechanical work taking place on the 16th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 4 drawing sheets
General sprinkler work taking place on the 16th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 2 drawing sheets
General plumbing work taking place on the 16th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 15Under Construction20p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
GENERAL CONSTRUCTION TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents · 4 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 145p · 3 filings · 11 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Sprinkler modifications taking place on the 14th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 2 drawing sheets
Plumbing modifications taking place on the 14th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 2 drawing sheets
Mechanical modifications taking place on the 6th, 7th, 8th, 9th, 12th, 14th, 17th, 30th, 33rd, 34th, 37th, 45th and 52nd Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 1312p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 1210p · 6 filings · 11 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on the 12th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1113p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 3 drawing sheets
General construction modifications taking place on the 11th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1019p · 8 filings · 20 docs
CivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Sprinkler modifications taking place on the 10th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
1 document · 3 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Plumbing modifications taking place on the 10th floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 98p · 6 filings · 11 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 81p · 1 filing · 7 docs
ArchitectureDMMechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications taking place on the 6th, 7th, 8th, 9th, 12th, 14th, 17th, 30th, 33rd, 34th, 37th, 45th and 52nd Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 73p · 5 filings · 14 docs
ArchitectureDMElectricalMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
General Construction Demo work taking place on the 7th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents
General Construction taking place on the 51st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 614p · 7 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Mechanical modifications taking place on the 6th, 7th, 8th, 9th, 12th, 14th, 17th, 30th, 33rd, 34th, 37th, 45th and 52nd Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
7 documents · 1 drawing sheet
General plumbing modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 3 drawing sheets
General sprinkler modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 5Under Construction4p · 7 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
General Construction taking place on the 4th and 5th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on the 4th and 5th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 7 filings on this floor.
Floor 4Under Construction3p · 7 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
General Construction taking place on the 4th and 5th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on the 4th and 5th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 3Under Construction5p · 6 filings · 20 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural
MECHANICAL WORK TAKING PLACE IN CELLAR AND ON FLOORS 1-5 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
STRUCTURAL WORK TAKING PLACE ON 1ST, 3RD, AND 4TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
General mechanical work taking place on the 1st through 3rd floors as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
13 documents
Latest 3 of 6 filings on this floor.
Floor 25p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
General sprinkler work taking place on the 1st and 2nd floors as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
General standpipe work taking place on the 2nd floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on the 14th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1Under Construction8p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
GENERAL CONSTRUCTION TAKING PLACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 3 drawing sheets
General sprinkler work taking place on the 1st and 2nd floors as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
General mechanical work taking place on the 1st through 3rd floors as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
CellarUnder Construction3p · 5 filings · 14 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
PLUMBING WORK TAKING PLACE IN CELLAR AND ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL WORK TAKING PLACE IN CELLAR AND ON FLOORS 1-5 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
General Construction work taking place on the 1st and 2nd floors as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Basement2p · 1 filing · 2 docs
ArchitectureDM
No filed description on record for this project.
On file for this project
2 documents · 2 drawing sheets