Office, 20+ stories, with or without commercial
One Grand Central Place
60 EAST 42 STREET · Midtown-Times Square · BIN 1035335
💬 Discuss this project
1929Year Built
55Stories
O4Building Class
C5-3Zoning
1,150,564 sfGross Floor Area
363Units
LL97 Covered5 Open Violations ▸FISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: ESRT ONE GRAND CENTRAL PLACE, L.L.C. · 42,050 sf lot · 27.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 7 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 3 docs
Floor 5512p · 3 filings · 18 docs
Floor 548p · 1 filing · 8 docs
Floor 536p · 3 filings · 12 docs
Floor 52Under Construction1p · 5 filings · 11 docs
Floor 515p · 5 filings · 20 docs
Floor 5015p · 8 filings · 20 docs
Floor 4918p · 7 filings · 20 docs
Floor 48
Floor 472p · 1 filing · 6 docs
Floor 462p · 1 filing · 6 docs
Floor 45
Floor 4415p · 4 filings · 18 docs
Floor 431p · 1 filing · 8 docs
Floor 42
Floor 4112p · 4 filings · 15 docs
Floor 40
Floor 39
Floor 381p · 1 filing · 7 docs
Floor 37
Floor 363p · 2 filings · 12 docs
Floor 35
Floor 341p · 1 filing · 4 docs
Floor 33
Floor 32
Floor 3112p · 7 filings · 20 docs
Floor 301p · 1 filing · 9 docs
Floor 294p · 2 filings · 15 docs
Floor 2817p · 5 filings · 20 docs
Floor 271p · 1 filing · 6 docs
Floor 265p · 3 filings · 20 docs
Floor 25Under Construction25p · 7 filings · 20 docs
Floor 2414p · 7 filings · 20 docs
Floor 2311p · 3 filings · 13 docs
Floor 228p · 7 filings · 20 docs
Floor 218p · 5 filings · 20 docs
Floor 2032p · 8 filings · 20 docs
Floor 1933p · 8 filings · 20 docs
Floor 1813p · 6 filings · 20 docs
Floor 178p · 6 filings · 11 docs
Floor 168p · 4 filings · 15 docs
Floor 15Under Construction20p · 8 filings · 20 docs
Floor 145p · 3 filings · 11 docs
Floor 1312p · 7 filings · 20 docs
Floor 1210p · 6 filings · 11 docs
Floor 1113p · 8 filings · 20 docs
Floor 1019p · 8 filings · 20 docs
Floor 98p · 6 filings · 11 docs
Floor 81p · 1 filing · 7 docs
Floor 73p · 5 filings · 14 docs
Floor 614p · 7 filings · 20 docs
Floor 5Under Construction4p · 7 filings · 20 docs
Floor 4Under Construction3p · 7 filings · 20 docs
Floor 3Under Construction5p · 6 filings · 20 docs
Floor 25p · 8 filings · 20 docs
Floor 1Under Construction8p · 8 filings · 20 docs
CellarUnder Construction3p · 5 filings · 14 docs
Basement2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ESRT76609/15/2026
PHOENIX SUTTON STR INC407/08/2026
ACE GROUP NY107/08/2026
EMPIRE STATE REALITY TRUST64207/08/2026
SPRING SCAFFOLDING LLC1007/08/2026
ESRT ONE GRAND CENTRAL PLACE, L.L.C.903/22/2026
TITAN CONSTRUCTION SERVIC203/22/2026
60 E 42 ST ASSOC203/22/2026
NEW MARIS REAL ESTATE INC203/22/2026
HELMSLEY SPEAR1803/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.A. JENNINGS, INCGeneral Contractor8707/08/2026
FOLOR INCGeneral Contractor7209/01/2026
RINNOVO CONSTRUCTION, LLCGeneral Contractor4407/08/2026
A&A PLUMBING CORPPlumbing2909/15/2026
ICON INTERIORS INCGeneral Contractor2607/08/2026
TITAN CONSTRUCTION SERVICGeneral Contractor2407/08/2026
DENKO MECHANICAL INCFire Protection2407/15/2026
FINALY GENL CONTR CORPGeneral Contractor2207/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor1607/08/2026
CROSS MANAGEMENT CORPGeneral Contractor1607/08/2026
PETRETTI & ASSOCIATES LLCGeneral Contractor1503/21/2026
UNITY CONSTRUCTION GROUPGeneral Contractor1107/08/2026
TRISTATE PLBG SVCS CORPPlumbing907/08/2026
TRISTATE PLBG SVCS CORPFire Protection907/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection707/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection607/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection607/08/2026
PREMIER ELECTRIC, INCElectrical603/22/2026
EMPIRE STATE ELEC MAINT &Electrical603/22/2026
PSI PARTNERS, LLCFire Protection607/08/2026
CORE FOUR CONSTRUCTION INGeneral Contractor603/21/2026
CROSSLAND MECHANICAL INCGeneral Contractor507/08/2026
A.W. & S. CONSTRUCTION COGeneral Contractor507/08/2026
DEPENDABLE MECHANICAL CORFire Protection507/08/2026
KG SPRINKLER CORPFire Protection507/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN51026308/27/2026
MEP INSPECTIONS, INC1102205/12/2026
MILROSE CONSULTANTS LLC2003410/30/2024
KZ ENGINEERING, P.C.4665112/01/2023
PCS ENGINEERING3745103/21/2023
CANY ARCHITECTURE & ENGIN1125102/21/2023
FOCAL POINT ARCHITECTURE/787212/27/2022
TOHFAZ UDDIN P.E.2001106/10/2022
CHEN ENGINEERING SERVICES1826311/08/2021
WB ENGINEERING533607/14/2021
Building Lifecycle
All (300)Filed (65)Permit Issued (80)Signed Off (50)Facade (FISP) (3)Inspection (60)Objection (12)Special Inspection (30)
09/14/2026
Permit issued — Plumbing
M01435958-I1-PL
09/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2026
Permit issued — Plumbing
M01303956-I1-PL
09/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/02/2026
Permit issued — Sidewalk Shed
M01451596-I1-SF
09/02/2026
Permit issued — Supported Scaffold
M01451596-I1-SH
09/01/2026
Permit issued — General Construction
M01435754-I1-GC
08/31/2026
Permit issued — Mechanical Systems
M01435760-I1-MS
08/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/27/2026
Filed — Alteration
PLUMBING WORK TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01435958-I1
08/26/2026
Signed off — Alteration
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01023710-I1
08/26/2026
Filed — Alteration
M01451596-I1
08/26/2026
Signed off — Alteration
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00987211-I1
08/26/2026
Filed — Alteration
PLUMBING WORK TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01442177-I1
08/26/2026
Filed — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01435754-I1
08/26/2026
Filed — Alteration
SPRINKLER WORK TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01442412-I1
08/25/2026
Filed — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01442040-I1
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
08/21/2026
Signed off — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01269463-I1
08/20/2026
Signed off — Alteration
M01082976-I1
08/20/2026
Signed off — Alteration
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 19TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01081381-I1
08/20/2026
Signed off — Alteration
M01329496-I1
08/20/2026
Signed off — Alteration
M01066922-I1
08/20/2026
Signed off — Alteration
M00946774-I1
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
08/07/2026
Permit issued — General Construction
M01296718-I1-GC
08/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
08/06/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
James Sullivan Jr
08/06/2026
Special inspection requirement — Final
James Sullivan Jr
08/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
08/06/2026
Special inspection requirement — Sprinkler Systems
James Sullivan Jr
08/06/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
07/29/2026
Signed off — Alteration
M01329512-I1
07/29/2026
Signed off — Alteration
M01329450-I1
07/28/2026
Signed off — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01105508-I1
07/27/2026
Signed off — Alteration
M01105629-I1
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2026
Special inspection requirement — Final
James Sullivan Jr
07/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/16/2026
Permit issued — Plumbing
M01419145-I1-PL
07/14/2026
Permit issued — Sprinklers
M01419154-I1-EW-SP
07/10/2026
Permit issued — Mechanical Systems
M01419137-I1-MS
07/10/2026
Permit issued — General Construction
M01419100-I1-GC
07/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2026
Signed off — Alteration
M01106916-I1
07/07/2026
Filed — Alteration
SPRINKLER WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01419154-I1
07/07/2026
Filed — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01419100-I1
07/07/2026
Filed — Alteration
PLUMBING WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01419145-I1
07/07/2026
Filed — Alteration
MECHANICAL WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01419137-I1
07/07/2026
Permit issued — Sprinklers
M01399155-I1-EW-SP
07/06/2026
Permit issued — Mechanical Systems
M01310632-I1-MS
06/30/2026
Signed off — Alteration
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
M01360810-I1
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
06/24/2026
Signed off — Alteration
M01269789-I1
06/23/2026
Permit issued — Mechanical Systems
M01399141-I1-MS
06/23/2026
Permit issued — General Construction
M01399127-I1-GC
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP09/14/2026
DOB NOWPlumbingPermit IssuedWILLIAM C. GERAKARIS P&H09/08/2026
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING09/02/2026
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING09/02/2026
DOB NOWGeneral ConstructionPermit IssuedFOLOR INC09/01/2026
DOB NOWMechanical SystemsPermit IssuedFOLOR INC08/31/2026
DOB NOWGeneral ConstructionPermit IssuedFOLOR INC08/07/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP07/16/2026
DOB NOWSprinklersPermit IssuedDENKO MECHANICAL INC07/14/2026
DOB NOWMechanical SystemsPermit IssuedFOLOR INC07/10/2026
DOB NOWGeneral ConstructionPermit IssuedFOLOR INC07/10/2026
DOB NOWSprinklersPermit IssuedDENKO MECHANICAL INC07/07/2026
DOB NOWMechanical SystemsPermit IssuedFOLOR INC07/06/2026
DOB NOWStructuralSigned-offTITAN CONSTRUCTION SERVIC06/23/2026
DOB NOWMechanical SystemsPermit IssuedFOLOR INC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedFOLOR INC06/23/2026
DOB NOWStructuralSigned-offTITAN CONSTRUCTION SERVIC06/18/2026
DOB NOWMechanical SystemsPermit IssuedRINNOVO CONSTRUCTION, LLC05/21/2026
DOB NOWStructuralPermit IssuedRINNOVO CONSTRUCTION, LLC05/21/2026
DOB NOWGeneral ConstructionPermit IssuedRINNOVO CONSTRUCTION, LLC05/21/2026
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP05/14/2026
DOB NOWGeneral ConstructionPermit IssuedTITAN CONSTRUCTION SERVIC04/02/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP04/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedTITAN CONSTRUCTION SERVIC04/01/2026
DOB NOWSuspended ScaffoldPermit IssuedTITAN CONST SERVICES LLC04/01/2026
DOB NOWStructuralPermit IssuedFOLOR INC03/30/2026
DOB NOWGeneral ConstructionSigned-offJ.A. JENNINGS, INC03/25/2026
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC03/19/2026
DOB NOWSprinklersPermit IssuedALLSTATE SPRINKLER LLC03/19/2026
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC03/18/2026
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC03/18/2026
DOB NOWStructuralPermit IssuedRINNOVO CONSTRUCTION, LLC03/10/2026
DOB NOWMechanical SystemsPermit IssuedRINNOVO CONSTRUCTION, LLC03/10/2026
DOB NOWGeneral ConstructionPermit IssuedRINNOVO CONSTRUCTION, LLC03/10/2026
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC03/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedTITAN CONSTRUCTION SERVIC03/02/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/02/2026
DOB NOWGeneral ConstructionPermit IssuedTITAN CONSTRUCTION SERVIC02/20/2026
DOB NOWSprinklersSigned-offH M SPRINKLER INC01/07/2026
DOB NOWSprinklersSigned-offH M SPRINKLER INC01/07/2026
+ 60 more permits on file
3 projects · most recent 09/08/2023
Associated Ducts and Piping Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2023Permit IssuedFOLOR INCAir Conditioning Systems, Associated Ducts and Piping
Ducts & Piping
N/A na 1 BTU · Ductwork ×1
06/03/2021Permit IssuedICON INTERIORS INCAir Conditioning Systems, Associated Ducts and Piping
Cooling
N/A N/A
Ducts & Piping
N/A N/A Ductwork
08/21/2019Signed-offCORE FOUR CONSTRUCTION INAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
N/A N/A
Ventilation
N/A N/A
Ducts & Piping
N/A N/A Ductwork
21 projects · most recent 08/26/2026
FiledStatusContractorScope
08/26/2026——610 heads
07/07/2026Permit IssuedDENKO MECHANICAL INC54 heads
06/12/2026Permit IssuedDENKO MECHANICAL INC20 heads
06/12/2026Signed-offKG SPRINKLER CORP585 heads, 2 outlets
05/12/2026Signed-offBEDROCK MECHANICAL INC31 heads
03/26/2026Permit IssuedFLOW-RIGHT FIRE SUPP CORP82 heads
03/26/2026——537 heads
02/24/2026Signed-offKG SPRINKLER CORP555 heads, 2 outlets
01/05/2026Permit IssuedALLSTATE SPRINKLER LLC10 heads
12/22/2025——380 heads
10/08/2025Signed-offKG SPRINKLER CORP381 heads
09/18/2025Permit IssuedDENKO MECHANICAL INC18 heads
09/04/2025Permit IssuedDENKO MECHANICAL INC93 heads
07/23/2025Permit IssuedFLOW-RIGHT FIRE SUPP CORP150 heads
02/06/2025Permit IssuedPSI PARTNERS, LLC95 heads
18 projects · most recent 08/27/2026
Water/Sanitary
FiledStatusContractorScope
08/27/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
08/26/2026———
08/26/2026——Water/Sanitary
07/07/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
03/26/2026———
03/26/2026———
03/26/2026——Water/Sanitary
02/24/2026———
01/05/2026———
12/22/2025———
10/08/2025———
10/08/2025Signed-offDONATO PLUMBING, INCWater/Sanitary
09/18/2025Signed-offA&A PLUMBING CORPWater/Sanitary
09/18/2025———
09/04/2025———
25 projects · most recent 09/16/2026
General Wiring Lighting
FiledStatusContractorScope
09/16/2026Permit IssuedRIVERDALE ELECTRIC CORPGeneral Wiring
08/27/2026Permit IssuedSOLAS ELECTRICAL CORP—
08/12/2026Permit IssuedEMPIRE STATE ELEC MAINT &General Wiring
07/28/2026CompleteALLSTATE ELECTRIC CORPGeneral Wiring
07/17/2026Permit IssuedEMPIRE STATE ELEC MAINT &General Wiring
04/20/2026CompleteA2K ELECTRIC CORPGeneral Wiring
04/10/2026Permit IssuedMRD ELEC'L SERVICES, INCGeneral Wiring
03/23/2026Permit IssuedRX ELECTRIC INC—
02/24/2026CompleteEMPIRE STATE ELEC MAINT &—
01/05/2026Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
12/17/2025Permit IssuedNEE ELECTRICAL, LLC—
12/04/2025CompleteEMPIRE STATE ELEC MAINT &—
12/04/2025CompleteEMPIRE STATE ELEC MAINT &—
10/08/2025CompleteRIVERDALE ELECTRIC CORPGeneral Wiring
06/18/2025CompleteEMPIRE STATE ELEC MAINT &General Wiring, Lighting
8 projects · most recent 03/24/2026
Steel Concrete
FiledStatusContractorScope
03/24/2026Permit IssuedRINNOVO CONSTRUCTION, LLCConcrete
12/17/2025Signed-offJ.A. JENNINGS, INCSteel, Concrete
11/18/2025Permit IssuedFOLOR INCSteel, Concrete
04/17/2025Signed-offTITAN CONSTRUCTION SERVICSteel
11/18/2024Signed-offRINNOVO CONSTRUCTION, LLCSteel
10/09/2024Signed-offTITAN CONSTRUCTION SERVICSteel
12/12/2023Signed-offTITAN CONSTRUCTION SERVIC1 scope_items
06/03/2021Permit IssuedICON INTERIORS INCSteel, Concrete
2 projects · most recent 05/08/2026
Scaffold
FiledStatusContractorScope
05/08/2026Permit IssuedACE GROUP NY CORPScaffold
03/09/2023Signed-offANDAMIO SCAFFOLDING LLCScaffold
1 project · most recent 12/01/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/01/2023Permit IssuedTITAN CONST SERVICES LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 235
DateTypeResultReport
09/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2026Pass-Final PL - UndergroundPassView ↗
07/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/23/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
04/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 235.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/25/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
08/12/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
08/06/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
08/06/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
08/06/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
08/06/2026FinalJames Sullivan Jrprogress
08/06/2026Mastic and Intumescent Fire-resistant CoatingsJames Sullivan Jrspecial
08/06/2026Sprinkler SystemsJames Sullivan Jrspecial
08/06/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
07/27/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
07/23/2026FinalJames Sullivan Jrprogress
06/25/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
06/18/2026FinalJames Sullivan Jrprogress
06/18/2026Mechanical SystemsJames Sullivan Jrspecial
06/18/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
06/18/2026Sprinkler SystemsJames Sullivan Jrspecial
06/18/2026FinalJames Sullivan Jrprogress
06/15/2026Standpipe SystemsJames Sullivan Jrspecial
06/15/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
06/15/2026Sprinkler SystemsJames Sullivan Jrspecial
06/11/2026Sprinkler SystemsJames Sullivan Jrspecial
06/11/2026Standpipe SystemsJames Sullivan Jrspecial
06/11/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
05/14/2026Energy Code Compliance InspectionsJames Sullivan Jrprogress
05/14/2026Duct leakage testing, insulation and designJames Sullivan Jrenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
One DiversifiedOfficeFloor 25
Project M01399127 Alteration · Permit Entire · 06/12/2026
Sora Round Round One Delicious Round One Delicious USARestaurant / Food ServiceFloors 1, 2
Project M01354556 Alteration · LOC Issued · 02/26/2026
Round DUNDT Round One DeliciousOfficeFloors 1, 2
Project M01360810 Alteration · LOC Issued · 02/24/2026
iCapitalOfficeFloors 9, 23–28
Project M01329512 Alteration · LOC Issued · 12/31/2025
Project M01329450 Alteration · LOC Issued · 12/16/2025
Project M01329498 Alteration · Permit Entire · 12/16/2025
Project M01329503 Alteration · Permit Entire · 12/16/2025
Project M00886886 Alteration · LOC Issued · 09/01/2023
Project M08023639 Alteration · LOC Issued · 11/03/2022
Project M08023728 Alteration · LOC Issued · 11/03/2022
Project M00749873 Alteration · LOC Issued · 08/30/2022
Project M00648262 Alteration · LOC Issued · 06/28/2022
Project M00647842 Alteration · LOC Issued · 06/15/2022
Project M00695555 Alteration · LOC Issued · 03/21/2022
Townhouse PartnersOfficeFloor 54
Project M01185485 Alteration · LOC Issued · 03/12/2025
Sol de JaneiroOfficeFloors 18–20
Project M01070983 Alteration · LOC Issued · 08/14/2024
Project M01070955 Alteration · LOC Issued · 08/12/2024
Fairfield MaxwellOfficeFloor 55
Project M01015012 Alteration · LOC Issued · 03/28/2024
Breakthru Beverage GroupOfficeFloor 49
Project M00947466 Alteration · LOC Issued · 01/12/2024
PBR PlusOfficeFloor 6
Project M00865803 Alteration · LOC Issued · 08/23/2023
MichelinOfficeFloor 17
Project M00842324 Alteration · LOC Issued · 04/04/2023
Belkin Burden GoldmanOfficeFloor 16
Project M08008165 Alteration · LOC Issued · 12/23/2022
ChaseOfficeFloor 1
Project M00670534 Alteration · LOC Issued · 10/12/2022
Haver AnalyticsOfficeFloors 32, 33
Project M00717175 Alteration · LOC Issued · 05/16/2022
First Republic BankOfficeCellar, Floors 1–3
Project M00513234 Alteration · Permit Entire · 06/03/2021
Project M00334109 Alteration · LOC Issued · 04/16/2020
Project M00334128 Alteration · LOC Issued · 04/16/2020
Project M00334142 Alteration · LOC Issued · 04/16/2020
Dime BankOfficeFloor 11
Project M00490735 Alteration · LOC Issued · 05/04/2021
Pio PlusOfficeFloor 23
Project M00359320 Alteration · LOC Issued · 06/26/2020
Project M00359354 Alteration · LOC Issued · 06/26/2020
Charles SchwabOfficeCellar
Project M00216101 Alteration · Permit Entire · 10/08/2019
Project M00216203 Alteration · LOC Issued · 10/08/2019
PreqinOfficeFloor 6
Project M00230842 Alteration · LOC Issued · 10/07/2019
Project M00231455 Alteration · LOC Issued · 10/07/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 14,047 on file (BIS + DOB NOW)
▸Plans & Drawings369
▸DOB NOWPlans/Sketch311
09/13/2026M01435958-I1Request digital key ↗
09/06/2026M00051706-I1Request digital key ↗
09/05/2026M00100770-I1Request digital key ↗
Showing 3 of 311 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler22
09/05/2026M00209758-I1Request digital key ↗
09/05/2026M00231455-I1Request digital key ↗
09/05/2026M00235623-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems21
09/05/2026M00187101-P1Request digital key ↗
09/05/2026M00187101-I1Request digital key ↗
09/05/2026M00209312-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Plumbing12
09/05/2026M00209386-I1Request digital key ↗
09/05/2026M00231316-I1Request digital key ↗
09/05/2026M00216203-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00467482-P1Request digital key ↗
09/04/2026M00467482-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00269615-I1Request digital key ↗
▸Applications & Permits2,351
▸BISPLAN / WORK APPROVAL APPLICATION1,365
11/06/2025104289280Open ↗
10/17/2025104289280Open ↗
10/02/2025104289280Open ↗
Showing 3 of 1,365 on file for this type
▸BISWORK PERMIT APPLICATION986
04/08/2021122907872Open ↗
Showing 1 of 986 on file for this type
▸Seals & Professional Certifications4,034
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2,160
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2,160 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST429
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 429 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature369
09/13/2026M01435958-I1Open ↗
09/05/2026M00187101-I1Open ↗
09/05/2026M00187101-P1Open ↗
Showing 3 of 369 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT360
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 360 on file for this type
▸DOB NOWProgress Inspector Seal & Signature255
09/29/2026M00931166-I1Open ↗
09/29/2026M00931166-I1Open ↗
09/27/2026M08023639-I1Open ↗
Showing 3 of 255 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature247
09/29/2026M00931166-I1Open ↗
09/27/2026M08023639-I1Open ↗
09/27/2026M01399127-I1Open ↗
Showing 3 of 247 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM178
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 178 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPC FULL REPORT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Trade Schedules & Equipment1,339
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE305
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 305 on file for this type
▸BISSELF-CERT PLUMBING NOTICE282
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 282 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA248
03/16/2022122903180Open ↗
05/25/2021120770978Open ↗
04/02/2021123863541Open ↗
Showing 3 of 248 on file for this type
▸BISSCHEDULE B - PLUMBING194
03/03/2022123334882Open ↗
Showing 1 of 194 on file for this type
▸BISEQUIPMENT USE PERMITS148
04/01/2022123334873Open ↗
12/30/2021122491204Open ↗
Showing 2 of 148 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT118
04/06/2022123334873Open ↗
04/01/2022123334873Open ↗
12/30/2021122491204Open ↗
Showing 3 of 118 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8534
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER SYSTEMS3
03/17/2022123334882Open ↗
Showing 1 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos1,170
▸BISASBESTOS: CERTIFICATION (DEP ACP5)448
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 448 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report352
09/13/2026M01435958-I1Open ↗
09/05/2026M00187101-I1Open ↗
09/05/2026M00187101-P1Open ↗
Showing 3 of 352 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'321
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 321 on file for this type
▸BISASBESTOS INSPECTION REPORT19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance789
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS429
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 429 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS213
06/14/2023123330047Open ↗
06/23/2022123771926Open ↗
06/15/2022123490052Open ↗
Showing 3 of 213 on file for this type
▸BISTR8: Energy Code Progress Inspections33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISTECHNICAL REPORT: ENERGY32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY30
06/23/2022123771926Open ↗
06/15/2022123490052Open ↗
04/06/2022123334873Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.28
09/03/2026M00493177-I1Open ↗
09/03/2026M00490735-I1Open ↗
09/03/2026M00491262-I1Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
01/03/2022140948973Open ↗
01/03/2022140973891Open ↗
11/23/2021140943451Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
01/03/2022140948973Open ↗
11/03/2021123789748Open ↗
11/01/2021140911173Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER3
01/03/2022140948973Open ↗
11/03/2021123789748Open ↗
11/01/2021140911173Open ↗
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports97
▸BISTECHNICAL REPORT: RESPONSIBILITY75
07/11/2023123330047Open ↗
06/09/2023123330047Open ↗
06/05/2023123330047Open ↗
Showing 3 of 75 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
01/03/2022140948973Open ↗
11/23/2021140943451Open ↗
11/03/2021123789748Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1,031
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST654
03/05/2025122903180Open ↗
07/12/2023123330047Open ↗
06/24/2022123771926Open ↗
Showing 3 of 654 on file for this type
▸BISADMINISTRATIVE OBJECTIONS263
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 263 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 82 on file for this type
▸BISSUPERSEDING LETTER12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISFINAL11
01/03/2022140948973Open ↗
01/03/2022140973891Open ↗
11/23/2021140943451Open ↗
Showing 3 of 11 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
10/17/2025104289280Open ↗
09/22/2025104289280Open ↗
09/11/2025104289280Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership1,622
▸BISCOST AFFIDAVIT1,614
03/05/2025122903180Open ↗
06/14/2023123330047Open ↗
06/09/2023123330047Open ↗
Showing 3 of 1,614 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
01/03/2022140948973Open ↗
01/03/2022140973891Open ↗
11/23/2021140943451Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms1,157
▸BISEFILING COVER SHEET605
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 605 on file for this type
▸BISBOROUGH INTAKE FORM379
04/08/2021122907872Open ↗
Showing 1 of 379 on file for this type
▸BISADDITIONAL INFORMATION155
11/06/2025104289280Open ↗
06/16/2022123490052Open ↗
03/03/2022123334882Open ↗
Showing 3 of 155 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸Other Documents40
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISSupporting Document: Fee Exempt6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSupporting Document: Fee Deferment4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type