RoofUnder Construction30p · 8 filings · 20 docs
ArchitectureCivilGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Structural modification taking place on floors 23-26 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 19TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 10 drawing sheets
MODIFICATIONS TAKING PLACE ON THE FACADE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 3 docs
Equipment
Suspended Scaffold as shown on plans
On file for this project
3 documents · 1 drawing sheet
Floor 5513p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
New sprinkler distribution per new architectural layout and new pantries and ADA bathrooms.
On file for this project
8 documents · 4 drawing sheets
Partial floor interior demolition and interior alteration consisted of private offices, open workstation areas and pantry. Project is professional self -certified. No change in use group, egress or occupancy.
On file for this project
6 documents · 5 drawing sheets
Distribution of underfloor air system off existing fan powered boxes. No change to use, egress or occupancy
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 5420p · 1 filing · 8 docs
ArchitectureDMGeneralOther
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON THE 54TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 8 drawing sheets
Floor 5312p · 2 filings · 9 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
MECHANICAL MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 52Under Construction16p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
PLUMBING WORK TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Project M01435760Permit Issued · 08/31/2026
MECHANICAL WORK TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents
Latest 3 of 7 filings on this floor.
Floor 5152p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Plumbing modifications taking place on the 51st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents
Sprinkler modifications taking place on the 51st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 5072p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
SPRINKLER/STANDPIPE MODIFICATIONS TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
PLUMBING MODIFICATIONS TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON THE 50TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 11 filings on this floor.
Floor 4965p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 49TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 4 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 49TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 49TH AND 50TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 48
Floor 477p · 2 filings · 11 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 46TH AND 47TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
General Construction place on the 40th, 46th and 47th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Floor 467p · 2 filings · 11 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 46TH AND 47TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
General Construction place on the 40th, 46th and 47th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Floor 4511p · 2 filings · 9 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
General Construction taking place on the 45th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents
Mechanical modifications taking place on the 45th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents
Floor 4423p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
General plumbing work taking place on the 44th floor as per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
General sprinkler work taking place on the 44th floor as per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
3 documents
General mechanical work taking place on the 44th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.
Floor 431p · 1 filing · 8 docs
Mechanical
General mechanical work taking place on the 44th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Floor 424p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
General Construction taking place on the 42nd Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Floor 4126p · 4 filings · 15 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 41ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 41ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 41ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 401 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
General Construction place on the 40th, 46th and 47th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Floor 39
Floor 3821p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modifications taking place on the 38th floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents
Mechanical modifications taking place on the 38th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
7 documents
Plumbing modifications taking place on the 38th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 3716p · 4 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
General Construction taking place on the 37th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents
Mechanical modifications taking place on the 37th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents
Mechanical modifications taking place on the 37th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
7 documents
Latest 3 of 4 filings on this floor.
Floor 366p · 2 filings · 12 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
General mechanical modifications taking place on the 36th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
General sprinkler modifications taking place on the 36th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 35
Floor 3430p · 4 filings · 16 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Mechanical modifications taking place on the 34th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents
Sprinkler modifications taking place on the 34th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 1 drawing sheet
General Construction taking place on the 34th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 331p · 1 filing · 4 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications taking place on the 32nd and 33rd floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents
Floor 329p · 2 filings · 10 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications taking place on the 31st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents
Mechanical modifications taking place on the 32nd and 33rd floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents
Floor 3161p · 9 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 306p · 2 filings · 16 docs
Fire ProtectionGeneralMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
General mechanical work taking place on the 30th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents
General sprinkler work taking place on the 30th floor as per plans submitted herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 1 drawing sheet
Floor 2912p · 2 filings · 11 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction
General construction modifications taking place on the 29th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
General mechanical work taking place on the 29th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 2 drawing sheets
Floor 2858p · 6 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications taking place on the 27th and 28th floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 5 drawing sheets
Structural modifications taking place on the 27th and 28th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 2 drawing sheets
General Construction taking place on the 27th and 28th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 2740p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications taking place on the 27th and 28th floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents
Structural modifications taking place on the 27th and 28th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents
General Construction taking place on the 27th and 28th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 2651p · 6 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Structural modification taking place on floors 23-26 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Structural modifications taking place on the 25th and 26th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
11 documents · 3 drawing sheets
Mechanical modifications taking place on the 25th and 26th Floors as per plans filed herewith. No change in Use, Egress, or occupancy.
On file for this project
14 documents
Latest 3 of 6 filings on this floor.
Floor 25Under Construction90p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
SPRINKLER WORK TAKING PLACE ON THE 25TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 drawing sheets
Structural modification taking place on floors 23-26 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
GENERAL CONSTRUCTION TAKING PLACE ON THE 25TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 5 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 2470p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modification taking place on floors 23-26 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Sprinkler modifications taking place on the 23rd and 24th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 2 drawing sheets
Plumbing modifications taking places on floors 21, 22, 23 and 24 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 2355p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modification taking place on floors 23-26 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Sprinkler modifications taking place on the 23rd and 24th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 2 drawing sheets
Plumbing modifications taking places on floors 21, 22, 23 and 24 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2246p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing modifications taking places on floors 21, 22, 23 and 24 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 2131p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
PLUMBING MODIFICATIONS TAKING PLACE ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 20155p · 17 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 19TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Sprinkler modifications taking place on the 20th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents · 3 drawing sheets
Standpipe modifications taking place on the 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 17 filings on this floor.
Floor 1913p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 19TH AND 20TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Standpipe modifications taking place on the 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
10 documents · 2 drawing sheets
Plumbing modifications taking place on the 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 1876p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 17TH AND 18TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
General Construction taking place on the 18th, 19th and 20th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 6 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 13, 15, 18, 20, 21, 22, & 53 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 1776p · 16 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 17TH AND 18TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 16 filings on this floor.
Floor 1676p · 13 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 13 filings on this floor.
Floor 15Under Construction92p · 12 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
PLUMBING WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
SPRINKLER WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 1481p · 7 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modifications taking place on the 14th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents · 2 drawing sheets
Plumbing modifications taking place on the 14th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 2 drawing sheets
General Construction taking place on the 14th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 1365p · 14 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 13TH FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 13TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 14 filings on this floor.
Floor 12113p · 14 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
General Construction work taking place on the 12th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
5 documents
Mechanical modifications taking place on the 12th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 5 drawing sheets
Sprinkler modifications taking place on the 12th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
1 drawing sheet
Latest 3 of 14 filings on this floor.
Floor 11109p · 16 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
GENERAL CONSTRUCTION TAKING PLACE ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 16 filings on this floor.
Floor 10Under Construction93p · 16 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STRUCTURAL WORK TAKING PLACE ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications taking place on the 10th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
1 document · 3 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 16 filings on this floor.
Floor 9112p · 19 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
SPRINKLER/STANDPIPE MODIFICATIONS TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Plumbing modifications taking place on the 9th floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 19 filings on this floor.
Floor 847p · 3 filings · 16 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler modifications taking place on the 6th, 7th, 8th, 9th, 12th, 14th, 17th, 30th, 33rd, 34th, 37th, 45th and 52nd Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
General Construction taking place on the 6th, 7th, 8th, 9th, 12th, 14th, 17th, 30th, 33rd, 34th, 37th, 45th and 52nd Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
6 documents · 4 drawing sheets
Mechanical modifications taking place on the 6th, 7th, 8th, 9th, 12th, 14th, 17th, 30th, 33rd, 34th, 37th, 45th and 52nd Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 770p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
General Construction Demo work taking place on the 7th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
4 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
PLUMBING MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 13 filings on this floor.
Floor 6Under Construction91p · 17 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
PLUMBING WORK TAKING PLACE ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL WORK TAKING PLACE ON THE 6TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
Latest 3 of 17 filings on this floor.
Floor 5Under Construction28p · 6 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural · Supported Scaffold
General Construction taking place on the 4th and 5th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 2 drawing sheets
Mechanical modifications taking place on the 4th and 5th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 6 filings on this floor.
Floor 4Under Construction29p · 7 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural · Supported Scaffold
General Construction taking place on the 4th and 5th Floors as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on the 4th and 5th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 3Under Construction53p · 8 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
MECHANICAL WORK TAKING PLACE IN CELLAR AND ON FLOORS 1-5 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
STRUCTURAL WORK TAKING PLACE ON 1ST, 3RD, AND 4TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
General mechanical work taking place on the 1st through 3rd floors as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
13 documents
Latest 3 of 8 filings on this floor.
Floor 2Under Construction11p · 16 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
PLUMBING WORK TAKING PLACE IN CELLAR AND ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
8 documents
General Construction demolition work taking place on floors 001-003 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
1 drawing sheet
Latest 3 of 16 filings on this floor.
Floor 1Under Construction11p · 25 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural · Supported Scaffold
PLUMBING WORK TAKING PLACE IN CELLAR AND ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
SPRINKLER WORK TAKING PLACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Plumbing modifications taking place on floor 001 as per plans filed herewith. No change in Use, Egress or Occupancy.
On file for this project
3 documents
Latest 3 of 25 filings on this floor.
CellarUnder Construction32p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
PLUMBING WORK TAKING PLACE IN CELLAR AND ON FLOORS 1 AND 2 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL WORK TAKING PLACE IN CELLAR AND ON FLOORS 1-5 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
General Construction work taking place on the 1st and 2nd floors as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Site & exteriorUnder Construction50p · 10 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
On file for this project
2 documents · 8 drawing sheets
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 6 drawing sheets
MODIFICATIONS TAKING PLACE ON THE FACADE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 12 drawing sheets
Latest 3 of 10 filings on this floor.
Filed — no permit issued56p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralPlumbing
PLUMBING WORK TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
SPRINKLER WORK TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
GENERAL CONSTRUCTION TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 12 drawing sheets
Latest 3 of 8 filings on this floor.