← Back
Elevator cooperative
60 KNOLLS CRESCENT
BRONX · BIN 2091864
💬 Discuss this project
1953Year Built
10Stories
D4Building Class
R6AZoning
237,800 sfGross Floor Area
244Units
LL97 CoveredRent Stabilized21 Open Violations 20 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: KNOLLS COOP SECT I INC · 128,125 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 6 docs
8 jobs · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
05/12/2026Permit IssuedKET ELECTRIC LLCGeneral Wiring
01/05/2026CompleteBOROWIDE ELECT'L CONTR'S—
11/17/2023Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
06/21/2021CompleteLERCO ELECTRIC LLCGeneral Wiring
05/27/2021CompleteLERCO ELECTRIC LLCGeneral Wiring
10/27/2020CompleteLERCO ELECTRIC LLCGeneral Wiring
09/17/2020CancelledO.K. ELEC'L SERVICE CORPGeneral Wiring
1 job · most recent 03/14/2026
Sidewalk Shed
FiledStatusContractorScope
03/14/2026Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
1 job · most recent 11/11/2025
Suspended Scaffold
FiledStatusContractorScope
11/11/2025Permit IssuedLAWRENCE EXTERIOR REST COSuspended Scaffold
1 job · most recent 11/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/11/2025Permit IssuedLAWRENCE EXTERIOR REST COSuspended Scaffold (SC)
Building Lifecycle
All (102)Filed (8)Permit Issued (10)Signed Off (4)Facade (FISP) (12)Violation (60)Inspection (4)Special Inspection (4)
06/06/2026
Violation issued (HPD, open)
B
06/06/2026
Violation issued (HPD, open)
B
06/06/2026
Violation issued (HPD, open)
B
06/06/2026
Violation issued (HPD, open)
B
06/06/2026
Violation issued (HPD, open)
B
06/06/2026
Violation issued (HPD, open)
B
06/06/2026
Violation issued (HPD, open)
B
05/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01339745-I1
03/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01339745-P1
01/15/2026
Violation issued (HPD, closed)
A
01/15/2026
Violation issued (HPD, open)
C
01/15/2026
Violation issued (HPD, closed)
A
01/15/2026
Violation issued (HPD, closed)
A
12/30/2025
Permit issued — Sidewalk Shed
X01339745-I1-SH
12/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01339745-I1
12/19/2025
Violation issued (ECB, closed)
Construction
12/19/2025
Violation issued (ECB, open)
Site Safety
12/04/2025
Filed — Alteration
Exterior Restoration to include Brick Replacement, Window and Sill replacement, roof membrane replacement and new front stoop as per plans filed herewith.
X00913193-P1
11/20/2025
Permit issued — General Construction
X00913193-I1-GC
11/19/2025
Permit issued — Suspended Scaffold
X01317470-I1-SC
11/11/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01317470-I1
11/11/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
11/11/2025
Special inspection requirement — Post-installed Anchors
nayan soni
04/01/2025
Signed off — Alteration
HEREBY FILING THIS APPLICATION TO INSTALL A NEW WET SPRINKLER SYSTEM OFF EXISTING STANDPIPE TO ACCOMMODATE EXISTING LAUNDRY ROOM LOCATED IN THE CELLAR FLOOR AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY.
X01083265-I1
03/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/20/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/17/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/03/2025
Permit issued — Sprinklers
X01083265-I1-EW-SD
03/03/2025
Permit issued — Sprinklers
X01083265-I1-EW-SP
02/18/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00934973-I1
11/26/2024
Signed off — Alteration
Renewal of SR23/2609
X00971369-I1
11/15/2024
Permit issued — General Construction
X00913193-I1-GC
10/02/2024
Cycle 9 facade report signed — SWARMP
10/01/2024
Cycle 9 facade inspection completed
09/23/2024
Permit issued — Sidewalk Shed
X00934973-I1-SH
08/19/2024
Cycle 9 facade report submitted
07/22/2024
Filed — Alteration
HEREBY FILING THIS APPLICATION TO INSTALL A NEW WET SPRINKLER SYSTEM OFF EXISTING STANDPIPE TO ACCOMMODATE EXISTING LAUNDRY ROOM LOCATED IN THE CELLAR FLOOR AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY.
X01083265-I1
07/18/2024
Special inspection requirement — Sprinkler Systems
Alexander Bomstein
07/18/2024
Special inspection requirement — Standpipe Systems
Alexander Bomstein
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2024
Permit issued — Suspended Scaffold
X00971369-I1-SC
12/06/2023
Filed — Alteration
Renewal of SR23/2609
X00971369-I1
09/29/2023
Permit issued — General Construction
X00913193-I1-GC
09/25/2023
Permit issued — Sidewalk Shed
X00934973-I1-SH
09/23/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00934973-I1
08/14/2023
Filed — Alteration
Exterior Restoration to include Brick Replacement, Window and Sill replacement, roof membrane replacement and new front stoop as per plans filed herewith.
X00913193-I1
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2020
Violation issued (ECB, closed)
Construction
06/10/2020
Violation issued (ECB, closed)
Elevators
05/30/2020
Violation issued (ECB, closed)
Elevators
04/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/23/2019
Violation issued (HPD, closed)
A
10/23/2019
Violation issued (HPD, closed)
A
10/23/2019
Violation issued (HPD, closed)
A
10/23/2019
Violation issued (HPD, closed)
A
10/23/2019
Violation issued (HPD, closed)
A
Latest 60 of 102 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY607/08/2026
KNOLLS COOP SECT I INC603/22/2026
KNOLLS COOPERATIVE SE.103/22/2026
KNOLLS COOPERATIVE SECTION NO503/22/2026
KNOLLS COOPERATIVE SECTION 1503/21/2026
KNOLLS COOPERATIVE SECT 1103/21/2026
KNOLLS CRESCENT CO-OP SECTION 1203/21/2026
MIDBORO MANAGEMENT103/21/2026
KNOLLS CO-OPERATAIVE SEC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP203/14/2026
LANE ENGINEERING CONSULTING, P.C.212/04/2025
RDDNY DESIGN BUILD CORP107/22/2024
ASHRAF CORP109/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
SKY MANAGEMENT GROUP203/21/2026
AE DESIGN SOLUTION403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor304/09/2026
ARCO PLBG AND HTG INCFire Protection207/08/2026
GREGORY PAPANTONIOUElectrical203/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor104/09/2026
REYES ENTERPRISE, INCElectrical103/21/2026
M. BLAUSTEIN & SON, INCElectrical103/21/2026
PRASSAKOS, GEORGEElectrical103/21/2026
GIANNELLI, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034212/04/2025
LANE ENGINEERING CONSULTI2967212/04/2025
SONI ENGINEERING CONSULTI9819111/11/2025
A&B WORLD CONSULTING, INC5704107/22/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/30/2025
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA11/20/2025
DOB NOWSuspended ScaffoldPermit IssuedLAWRENCE EXTERIOR REST CO11/19/2025
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC03/03/2025
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC03/03/2025
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA11/15/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/23/2024
DOB NOWSuspended ScaffoldSigned-offLAWRENCE EXTERIOR REST CO01/10/2024
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA09/29/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/25/2023
BIS—ISSUEDLAWRENCE EXTERIOR RESTORATION03/18/2025
BISOTISSUEDM.K.Y BROTHERS CONSTRUCTI09/16/2020
BIS—ISSUEDPLSMN IMPROVEMENTS INC02/13/2020
BISPLISSUEDCC CONTROLLED PLBG CO INC12/03/2018
BISBLISSUEDC C CONTROLLED COMBUSTION08/17/2018
BISPLISSUEDCC CONTROLLED PLBG CO INC12/01/2017
BISBLRE-ISSUEDC C CONTROLLED COMBUSTION12/01/2017
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/14/2015
BISEQISSUEDEVEREST SCAFFOLDING INC05/29/2015
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/28/2014
BISEQISSUEDEVEREST SCAFFOLDING INC06/02/2014
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/22/2013
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/02/2013
BISEQISSUEDEVEREST SCAFFOLDING INC06/14/2013
BISOTISSUED6TH AVENUE CONSTRUCTION &12/26/2012
BISEQISSUEDEVEREST SCAFFOLDING INC06/28/2012
BISOTRE-ISSUED6TH AVENUE CONSTRUCTION &06/27/2012
BISPLISSUEDALL PRO PLBG & HTG INC03/26/2009
BISOTISSUEDALL PRO PLBG & HTG INC03/26/2009
BISOTISSUEDMAFFEI LANDSCAPING INC.06/12/2008
BISOTISSUEDSKYLINE RESTORATION INC08/09/2007
BISEQISSUEDOUTDOOR INSTALLATIONS LLC08/08/2007
BISOTISSUEDNEW YORK PLBG-HTG-COOLING02/14/2001
BISOTISSUEDCROSS STATE CONST. CO05/14/1999
BISOTISSUEDAPPLE INCINERATOR AND COMPACTION04/13/1993
BISPLISSUEDAPPLE INCINERATOR AND COMPACTION04/13/1993
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/11/2025Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
11/11/2025Post-installed Anchorsnayan sonispecial
07/18/2024Sprinkler SystemsAlexander Bomsteinspecial
07/18/2024Standpipe SystemsAlexander Bomsteinspecial
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026X00934973-I1Request digital key ↗
08/22/2026X00971369-I1Request digital key ↗
08/21/2026X01083265-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits47
▸BISWORK PERMIT APPLICATION25
03/31/2025220699279Open ↗
09/16/2020240279480Open ↗
02/13/2020220699279Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
03/06/2026210041257Open ↗
03/04/2026210041257Open ↗
01/29/2025220699279Open ↗
Showing 3 of 17 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION2
11/04/2013220206612Open ↗
11/01/2013220206612Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/29/2012210005135Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/17/2025220699279Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/27/2020220699279Open ↗
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
09/12/2019220627506Open ↗
05/21/2019220627506Open ↗
04/29/2019220699279Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026X00934973-I1Open ↗
08/21/2026X01083265-I1Open ↗
08/17/2026X00913193-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/29/2019220699279Open ↗
12/04/2017220627506Open ↗
06/28/2012220194572Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026X01317470-I1Open ↗
08/25/2026X01317470-I1Open ↗
08/25/2026X01083265-I1Open ↗
▸BISPC FULL REPORT2
07/17/2007210005135Open ↗
07/12/2007210004537Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/19/2020240279480Open ↗
12/04/2017220627506Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
07/12/2007210004537Open ↗
08/19/2020240279480Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2020240279480Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/28/2012220194572Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
11/01/2019220699279Open ↗
04/29/2019220699279Open ↗
02/19/2019220627506Open ↗
Showing 3 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/27/2025220699279Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/11/2009210122017Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/04/2017220627506Open ↗
▸BISSCHEDULE B - PLUMBING1
02/27/2009210122017Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
04/29/2019220699279Open ↗
02/27/2009210122017Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
08/19/2020240279480Open ↗
08/07/2019220699279Open ↗
▸BISSTREET TREE SIGNOFF1
03/20/2025220699279Open ↗
▸Environmental & Asbestos9
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
02/27/2009210122017Open ↗
03/24/2008210041257Open ↗
07/12/2007210004537Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/19/2020240279480Open ↗
04/29/2019220699279Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X00913193-I1Open ↗
08/13/2026X00913193-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/17/2007210005135Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/04/2017220627506Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/12/2019220627506Open ↗
05/21/2019220627506Open ↗
04/29/2019220699279Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
02/15/2021240279480Open ↗
09/12/2019220627506Open ↗
05/21/2019220627506Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
10/07/2013220206612Open ↗
06/22/2012220206612Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/15/2021240279480Open ↗
08/19/2020240279480Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/21/2025220699279Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
05/13/2019220627506Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/21/2025220699279Open ↗
▸BISNYCECC ANALYSIS1
08/19/2020240279480Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/19/2020240279480Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/15/2021240279480Open ↗
08/19/2020240279480Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/21/2025220699279Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/21/2025220699279Open ↗
▸Approvals, Objections & Sign-offs24
▸BISLETTERS - SUPPORTING DOCUMENTATION8
09/12/2019220627506Open ↗
09/12/2019220627506Open ↗
05/21/2019220627506Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
02/15/2021240279480Open ↗
06/20/2019220627506Open ↗
05/21/2019220627506Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
06/28/2012220194572Open ↗
05/31/2012220206612Open ↗
02/27/2009210122017Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
04/29/2019220699279Open ↗
▸BISSUPERSEDING LETTER1
03/31/2025220699279Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT26
08/19/2020240279480Open ↗
09/12/2019220627506Open ↗
06/20/2019220627506Open ↗
Showing 3 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/21/2025220699279Open ↗
02/15/2021240279480Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION7
08/19/2020240279480Open ↗
11/01/2019220699279Open ↗
01/09/2019220627506Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
04/29/2019220699279Open ↗
12/04/2017220627506Open ↗
06/28/2012220194572Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
03/31/2025220699279Open ↗
01/27/2020220699279Open ↗
06/20/2019220627506Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2020240279480Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/13/2026X01317470-I1Open ↗
08/13/2026X00971369-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01317470-I1Open ↗
08/13/2026X00971369-I1Open ↗
▸BISPRELIMINARY1
03/21/2025220699279Open ↗