← Back
Elevator cooperative
60 KNOLLS CRESCENT
BRONX · BIN 2091865
💬 Discuss this project
1953Year Built
10Stories
D4Building Class
R6AZoning
237,800 sfGross Floor Area
244Units
LL97 CoveredRent Stabilized17 Open Violations 16 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: KNOLLS COOP SECT I INC · 128,125 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 1 filing · 18 docs
Floor 12p · 1 filing · 7 docs
7 jobs · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
01/05/2026CompleteBOROWIDE ELECT'L CONTR'S—
09/23/2025Permit IssuedPRIME LIGHT ELEC'L CONSTRGeneral Wiring
06/18/2025CompleteKURT EBINGER ELEC CONSTGeneral Wiring
05/17/2024CompleteMACINTOSH ELECTRIC CORP—
02/02/2024CompleteTRIPLE H ELECTRICAL CORPGeneral Wiring
11/17/2023Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
1 job · most recent 12/04/2025
FiledStatusContractorScope
12/04/2025Permit IssuedLAWRENCE EXTERIOR RESTORA1 scope_items
1 job · most recent 11/11/2025
Suspended Scaffold
FiledStatusContractorScope
11/11/2025Permit IssuedLAWRENCE EXTERIOR REST COSuspended Scaffold
1 job · most recent 11/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/11/2025Permit IssuedLAWRENCE EXTERIOR REST COSuspended Scaffold (SC)
Building Lifecycle
All (147)Filed (14)Permit Issued (13)Signed Off (8)Facade (FISP) (14)Violation (60)Inspection (6)Objection (14)Special Inspection (18)
04/22/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01339750-I1
03/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01339750-P2
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
03/03/2026
Special inspection requirement — Final
Douglas Lane
03/03/2026
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
03/03/2026
Special inspection requirement — Masonry
Douglas Lane
03/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
02/17/2026
Objection resolved — Addressed
02/17/2026
Objection resolved — Addressed
01/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01339750-P1
01/02/2026
Signed off — Alteration
MINOR INTERIOR WORK INSIDE APT# 1K @ 1ST FL, REMOVE INTERIOR NON-LOAD BEARING PARTITION, REPAIR FLOOR AS REQUIRED BY WALL REMOVAL, AND INTERIOR FINISHES THROUGHOUT. WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING FILED SUBSEQUENT# X01175210-S1.
X01175210-I1
01/02/2026
Signed off — Alteration
MINOR INTERIOR WORK INSIDE APT# 1K @ 1ST FL, REMOVE INTERIOR NON-LOAD BEARING PARTITION, REPAIR FLOOR AS REQUIRED BY WALL REMOVAL, AND INTERIOR FINISHES THROUGHOUT. WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING FILED SUBSEQUENT# X01175210-S1.
X01175210-S1
12/30/2025
Permit issued — Sidewalk Shed
X01339750-I1-SH
12/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01339750-I1
12/19/2025
Violation issued (ECB, closed)
Construction
12/19/2025
Violation issued (ECB, closed)
Site Safety
12/10/2025
Objection raised — Other
12/10/2025
Objection raised — Cost
12/04/2025
Filed — Alteration
Facade Restoration to include brick replacement, sill and lintel replacement and patching. Roof Membrane replacement and new front stoop with ADA ramp as per plans filed herewith.
X00911082-P1
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
12/02/2025
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
12/02/2025
Special inspection requirement — Final
Douglas Lane
12/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
12/02/2025
Special inspection requirement — Masonry
Douglas Lane
12/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/20/2025
Permit issued — General Construction
X00911082-I1-GC
11/19/2025
Permit issued — Suspended Scaffold
X01317514-I1-SC
11/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/11/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01317514-I1
11/11/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
11/11/2025
Special inspection requirement — Post-installed Anchors
nayan soni
04/25/2025
Permit issued — Plumbing
X01175210-S1-PL
04/23/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00935238-I1
04/08/2025
Permit issued — General Construction
X01175210-I1-GC
04/01/2025
Signed off — Alteration
HEREBY FILING THIS APPLICATION TO INSTALL A NEW WET SPRINKLER SYSTEM OFF EXISTING STANDPIPE TO ACCOMMODATE EXISTING LAUNDRY ROOM LOCATED IN THE CELLAR FLOOR AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY.
X01083272-I1
03/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/17/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/07/2025
Objection resolved — Addressed
03/04/2025
Objection raised — Admin
03/04/2025
Objection resolved — Addressed
03/03/2025
Permit issued — Sprinklers
X01083272-I1-EW-SP
03/03/2025
Permit issued — Standpipe
X01083272-I1-EW-SD
02/22/2025
Filed — Alteration
MINOR INTERIOR WORK INSIDE APT# 1K @ 1ST FL, REMOVE INTERIOR NON-LOAD BEARING PARTITION, REPAIR FLOOR AS REQUIRED BY WALL REMOVAL, AND INTERIOR FINISHES THROUGHOUT. WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING FILED SUBSEQUENT# X01175210-S1.
X01175210-S1
02/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
02/19/2025
Objection raised — Plumbing
02/18/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00934975-I1
02/11/2025
Filed — Alteration
MINOR INTERIOR WORK INSIDE APT# 1K @ 1ST FL, REMOVE INTERIOR NON-LOAD BEARING PARTITION, REPAIR FLOOR AS REQUIRED BY WALL REMOVAL, AND INTERIOR FINISHES THROUGHOUT. WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING FILED SUBSEQUENT# X01175210-S1.
X01175210-I1
11/26/2024
Signed off — Alteration
Renewal of SR23/2610
X00972931-I1
09/23/2024
Permit issued — Sidewalk Shed
X00934975-I1-SH
09/12/2024
Cycle 9 facade report signed — SWARMP
09/04/2024
Filed — Alteration
X01072174-I1
08/27/2024
Cycle 9 facade inspection completed
08/19/2024
Cycle 9 facade report submitted
07/29/2024
Signed off — Alteration
X01011576-I1
07/22/2024
Filed — Alteration
HEREBY FILING THIS APPLICATION TO INSTALL A NEW WET SPRINKLER SYSTEM OFF EXISTING STANDPIPE TO ACCOMMODATE EXISTING LAUNDRY ROOM LOCATED IN THE CELLAR FLOOR AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY.
X01083272-I1
07/18/2024
Special inspection requirement — Standpipe Systems
Alexander Bomstein
Latest 60 of 147 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY607/08/2026
KNOLLS COOPERATIVE SE.103/22/2026
KNOLLS COOP SCCT 1,INC103/22/2026
TO THE OWNER OF 80 KNOLLS103/22/2026
KNOLLS COOP SECT203/21/2026
KNOLLS COOPERATIVE SECTION 1503/21/2026
KNOLLS COOPERATIVE SECT 1103/21/2026
KNOOLS COOPERATIVE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
SKY MANAGEMENT GROUP203/21/2026
INSHA BUILDING CONSULTANTS403/21/2026
AE DESIGN SOLUTION603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
INFINITI ESC PLUMBING CORPlumbing307/08/2026
ARCO PLBG AND HTG INCFire Protection207/08/2026
GREGORY PAPANTONIOUElectrical203/21/2026
REYES ENTERPRISE, INCElectrical103/21/2026
GIANNELLI, ANTHONYElectrical103/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor104/09/2026
CITY DIMENSIONS CONSTRUCTGeneral Contractor107/08/2026
MKSSKR CONSULTING SERVICEGeneral Contractor104/09/2026
WILLIAM SHARINNElectrical103/21/2026
KURT EBINGER ELEC CONSTElectrical103/22/2026
M. BLAUSTEIN & SON, INCElectrical103/21/2026
PRASSAKOS, GEORGEElectrical103/21/2026
PRIME LIGHT ELEC'L CONSTRElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034212/04/2025
LANE ENGINEERING CONSULTI2967212/04/2025
SONI ENGINEERING CONSULTI9819111/11/2025
BUILDTECH ENGINEERING6369202/22/2025
NEW YORK ENGINEERING ASSO851109/04/2024
A&B WORLD CONSULTING, INC5704107/22/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/30/2025
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA11/20/2025
DOB NOWSuspended ScaffoldPermit IssuedLAWRENCE EXTERIOR REST CO11/19/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/25/2025
DOB NOWGeneral ConstructionSigned-offMKSSKR CONSULTING SERVICE04/08/2025
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC03/03/2025
DOB NOWStandpipeSigned-offARCO PLBG AND HTG INC03/03/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/23/2024
DOB NOWGeneral ConstructionSigned-offCITY DIMENSIONS CONSTRUCT03/06/2024
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA02/23/2024
DOB NOWSuspended ScaffoldSigned-offLAWRENCE EXTERIOR REST CO01/11/2024
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA09/27/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/25/2023
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/14/2015
BISEQISSUEDEVEREST SCAFFOLDING INC05/29/2015
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/28/2014
BISEQISSUEDEVEREST SCAFFOLDING INC06/02/2014
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/22/2013
BISOTISSUEDPROTO RESTORATION CONSTRUCTION09/23/2013
BISEQISSUEDEVEREST SCAFFOLDING INC06/14/2013
BISOTISSUED6TH AVENUE CONSTRUCTION &12/26/2012
BISEQISSUEDEVEREST SCAFFOLDING INC06/28/2012
BISOTRE-ISSUED6TH AVENUE CONSTRUCTION &06/27/2012
BISOTISSUEDNET COM DEVELOPMENT INC07/13/2009
BISOTISSUEDNET COM DEVELOPMENT INC04/30/2009
BISOTISSUEDFAST TRACK ELECTRIC CORP10/15/2007
BISOTISSUEDGJF CONSTRUCTION CORP.09/17/2001
BISOTISSUEDAPPLE INCINERATOR AND COMPACTION04/13/1993
BISPLISSUEDAPPLE INCINERATOR AND COMPACTION04/13/1993
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/03/2026Energy Code Compliance InspectionsDouglas Laneprogress
03/03/2026FinalDouglas Laneprogress
03/03/2026Air barrier - visual inspectionDouglas Laneenergy_progress
03/03/2026MasonryDouglas Lanespecial
03/03/2026Structural Stability – Alterations of existing buildingsDouglas Lanespecial
03/03/2026Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
12/02/2025Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
12/02/2025Air barrier - visual inspectionDouglas Laneenergy_progress
12/02/2025FinalDouglas Laneprogress
12/02/2025Structural Stability – Alterations of existing buildingsDouglas Lanespecial
12/02/2025Energy Code Compliance InspectionsDouglas Laneprogress
12/02/2025MasonryDouglas Lanespecial
11/11/2025Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
11/11/2025Post-installed Anchorsnayan sonispecial
02/22/2025Tenant Protection Plan ComplianceLuis Pichardospecial
07/18/2024Standpipe SystemsAlexander Bomsteinspecial
07/18/2024Sprinkler SystemsAlexander Bomsteinspecial
06/26/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/22/2026X00934975-I1Request digital key ↗
08/22/2026X00935238-I1Request digital key ↗
08/22/2026X00972931-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION13
10/23/2015220206621Open ↗
11/03/2014220206621Open ↗
07/01/2014220194581Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
04/23/2015220206621Open ↗
10/01/2013220206621Open ↗
06/28/2012220194581Open ↗
Showing 3 of 7 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION2
11/04/2013220206621Open ↗
11/01/2013220206621Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/29/2012210005144Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/22/2026X00935238-I1Open ↗
08/17/2026X00911082-P1Open ↗
08/17/2026X00911082-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026X01072174-I1Open ↗
09/01/2026X00911082-I1Open ↗
09/01/2026X00911082-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
01/05/2016220206621Open ↗
06/28/2012220194581Open ↗
05/31/2012220206621Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X00911082-I1Open ↗
09/01/2026X00911082-I1Open ↗
09/01/2026X00911082-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT1
07/17/2007210005144Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/28/2012220194581Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/28/2012220194581Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026X01175210-S1Open ↗
08/13/2026X01175210-I1Open ↗
08/13/2026X01011576-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT1
05/26/2009220008480Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/30/2007210013215Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/17/2007210005144Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026X00911082-I1Open ↗
▸Energy Compliance4
▸BISTR8: Energy Code Progress Inspections2
10/01/2013220206621Open ↗
06/22/2012220206621Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/05/2016220206621Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/05/2016220206621Open ↗
▸Approvals, Objections & Sign-offs16
▸BISADMINISTRATIVE OBJECTIONS5
06/28/2012220194581Open ↗
05/31/2012220206621Open ↗
05/26/2009220008480Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/01/2014220194581Open ↗
09/24/2013220206621Open ↗
06/20/2013220194581Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/05/2016220206621Open ↗
10/05/2009210013215Open ↗
09/25/2009220008480Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
06/10/2015220194581Open ↗
06/10/2015220194581Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X00911082-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
01/05/2016220206621Open ↗
05/31/2012220206621Open ↗
10/05/2009210013215Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
05/27/2015220206621Open ↗
09/14/2012220194581Open ↗
▸BISEFILING COVER SHEET2
06/28/2012220194581Open ↗
05/31/2012220206621Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026X01317514-I1Open ↗
08/13/2026X00972931-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01317514-I1Open ↗
08/13/2026X00972931-I1Open ↗