← Back
Two family brick
60 MONTGOMERY PLACE
BROOKLYN · BIN 3025013
💬 Discuss this project
1890Year Built
4Stories
B1Building Class
R7BZoning
4,950 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 2,200 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmGeneral
Roof7p · 1 filing · 20 docs
Floor 418p · 2 filings · 20 docs
Floor 311p · 2 filings · 20 docs
Floor 217p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
Basement14p · 1 filing · 20 docs
2 jobs · most recent 02/26/2026
General Wiring
FiledStatusContractorScope
02/26/2026CompleteASKO ELEC CONST & MAIN IN—
10/02/2025CompleteASKO ELEC CONST & MAIN INGeneral Wiring
Building Lifecycle
All (117)Filed (17)Permit Issued (8)Signed Off (7)Violation (2)Inspection (11)Objection (42)Special Inspection (30)
06/23/2026
Signed off — Alteration CO
File herewith to Amend the C of O, converting a two-family dwelling into a one-family dwelling. The residential units on the 3rd and 4th floors will be removed and combined with the existing dwelling on the 1st and 2nd floors.
B01192465-I1
08/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Come Menage
08/06/2025
Filed — Alteration CO
File herewith to Amend the C of O, converting a two-family dwelling into a one-family dwelling. The residential units on the 3rd and 4th floors will be removed and combined with the existing dwelling on the 1st and 2nd floors.
B01192465-P1
07/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/01/2025
Permit issued — General Construction
B01192465-I1-GC
06/17/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Scope
05/21/2025
Filed — Alteration CO
File herewith to Amend the C of O, converting a two-family dwelling into a one-family dwelling. The residential units on the 3rd and 4th floors will be removed and combined with the existing dwelling on the 1st and 2nd floors.
B01192465-I1
07/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2024
Signed off — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-S2
06/21/2024
Signed off — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-S4
06/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
06/11/2024
Special inspection requirement — Post-installed Anchors
William Ryan
06/05/2024
Objection raised — Scope
06/05/2024
Objection resolved — Addressed
06/05/2024
Objection raised — Structural
06/05/2024
Objection resolved — Addressed
06/05/2024
Objection raised — Inspections
06/05/2024
Objection resolved — Addressed
05/31/2024
Filed — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-P9
05/30/2024
Special inspection requirement — Post-installed Anchors
William Ryan
05/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
05/30/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2023
Signed off — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-S3
11/13/2023
Permit issued — Mechanical Systems
B00659257-S3-MS
10/11/2023
Signed off — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-S5
10/11/2023
Signed off — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-S1
09/18/2023
Filed — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-P6
09/18/2023
Filed — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-P5
07/19/2023
Permit issued — Structural
B00659257-S1-GC-CX
07/07/2023
Special inspection requirement — Post-installed Anchors
William Ryan
07/07/2023
Special inspection requirement — Footing and Foundation
William Ryan
07/07/2023
Special inspection requirement — Final
William Ryan
07/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
07/07/2023
Special inspection requirement — Structural Cold-Formed Steel
William Ryan
07/07/2023
Special inspection requirement — Structural Steel - Details
William Ryan
07/05/2023
Special inspection requirement — Fenestration areas
Come Menage
07/05/2023
Special inspection requirement — Final
Come Menage
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
07/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
Come Menage
07/05/2023
Special inspection requirement — Air barrier - visual inspection
Come Menage
07/05/2023
Special inspection requirement — Interior lighting power
Come Menage
07/05/2023
Special inspection requirement — Exterior lighting power
Come Menage
07/05/2023
Special inspection requirement — Lighting controls
Come Menage
05/26/2023
Filed — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-P8
05/26/2023
Filed — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-P7
05/23/2023
Special inspection requirement — Structural Steel - Details
05/22/2023
Special inspection requirement — Footing and Foundation
William Ryan
05/22/2023
Special inspection requirement — Post-installed Anchors
William Ryan
05/22/2023
Special inspection requirement — Structural Cold-Formed Steel
William Ryan
05/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
05/22/2023
Special inspection requirement — Final
William Ryan
05/11/2023
Permit issued — General Construction
B00659257-S5-GC
04/28/2023
Signed off — Alteration
REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00659257-I1
03/28/2023
Special inspection requirement — Post-installed Anchors
William Ryan
03/28/2023
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
Latest 60 of 117 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60 MONTGOMERY PLACE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/28/2021$4.9M—Private party → Private party$998/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
READ ARCHITECTURE DESIGN DPC908/06/2025
ABS ENGINEERING, PLLC805/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MBE CODE & ZONING LLC603/21/2026
READ ARCHITECTURE DESIGN DPC503/21/2026
JAM CONSULTANTS, INC.1203/21/2026
J. CALLAHAN CONSULTING, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MDR CONTRACTING CORPGeneral Contractor1007/08/2026
CCM DESIGN & CONSULTING *General Contractor303/21/2026
ASKO ELEC CONST & MAIN INElectrical203/22/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
IRVING BAPTISTEElectrical103/21/2026
NYIR INCGeneral Contractor104/09/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING20181505/31/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYIR INC07/01/2025
DOB NOWMechanical SystemsSigned-offMDR CONTRACTING CORP11/13/2023
DOB NOWStructuralSigned-offMDR CONTRACTING CORP07/19/2023
DOB NOWGeneral ConstructionSigned-offMDR CONTRACTING CORP05/11/2023
DOB NOWGeneral ConstructionSigned-offMDR CONTRACTING CORP10/18/2022
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR05/24/2022
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR05/23/2022
DOB NOWGeneral ConstructionSigned-offCCM DESIGN & CONSULTING *02/10/2022
BISSPISSUEDHEADS UP FIRE SPRINKLER02/10/2021
BISSPISSUEDHEADS UP FIRE SPRINKLER06/07/2019
BISPLISSUEDVARUZZI PLUMBG & HTG INC10/01/2018
BISSPISSUEDHEADS UP FIRE SPRINKLER06/08/2018
BISEQISSUEDROCK GROUP NY CORP05/01/2013
BISEQISSUEDROCK GROUP NY CORP05/01/2013
BISMHISSUEDBAKER RECONSTRUCTION LLC12/04/2012
BISSPISSUEDKG SPRINKLER CORP09/24/2012
BISPLISSUEDHENRY MYERS P & H, INC09/20/2012
BISEQISSUEDROCK SCAFFOLDING CORP08/30/2012
BISEQISSUEDROCK SCAFFOLDING CORP08/30/2012
BISOTISSUEDBAKER RECONSTRUCTION LLC07/18/2012
BISPLISSUEDHENRY MYERS P & H, INC03/28/2012
BISOTISSUEDBAKER RECONSTRUCTION LLC03/26/2012
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/11/2025Fire-Resistance Rated ConstructionCome Menageprogress
06/11/2024Energy Code Compliance InspectionsWilliam Ryanprogress
06/11/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/11/2024Post-installed AnchorsWilliam Ryanspecial
05/30/2024Post-installed AnchorsWilliam Ryanspecial
05/30/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
05/30/2024Energy Code Compliance InspectionsWilliam Ryanprogress
07/07/2023Post-installed AnchorsWilliam Ryanspecial
07/07/2023Footing and FoundationWilliam Ryanprogress
07/07/2023FinalWilliam Ryanprogress
07/07/2023Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
07/07/2023Structural Cold-Formed SteelWilliam Ryanspecial
07/07/2023Structural Steel - DetailsWilliam Ryanspecial
07/05/2023Fenestration areasCome Menageenergy_progress
07/05/2023FinalCome Menageprogress
07/05/2023Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/05/2023Fire-Resistance Rated ConstructionCome Menageprogress
07/05/2023Air barrier - visual inspectionCome Menageenergy_progress
07/05/2023Interior lighting powerCome Menageenergy_progress
07/05/2023Exterior lighting powerCome Menageenergy_progress
07/05/2023Lighting controlsCome Menageenergy_progress
05/23/2023Structural Steel - Details—special
05/22/2023Footing and FoundationWilliam Ryanprogress
05/22/2023Post-installed AnchorsWilliam Ryanspecial
05/22/2023Structural Cold-Formed SteelWilliam Ryanspecial
Latest 25 of 59.
▾Documents — 265 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/29/2026B00659257-P8Request digital key ↗
08/29/2026B00659257-P6Request digital key ↗
08/29/2026B00659257-P3Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION33
11/24/2025320353292Open ↗
11/21/2025320353292Open ↗
11/20/2025320353292Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWLPC Approval/Permit15
08/29/2026B00659257-P8Open ↗
08/29/2026B00659257-P7Open ↗
08/29/2026B00659257-P6Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION11
06/10/2019321726254Open ↗
06/08/2018321726254Open ↗
05/02/2013320511380Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01192465-I1Open ↗
08/13/2026B01192465-P1Open ↗
▸Seals & Professional Certifications77
▸DOB NOWProgress Inspector Seal & Signature27
09/27/2026B00659257-S5Open ↗
09/27/2026B00659257-S5Open ↗
09/27/2026B00659257-S5Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/29/2026B00659257-P4Open ↗
08/29/2026B00659257-P9Open ↗
08/29/2026B00659257-P8Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/19/2026B00659257-P3Open ↗
09/02/2026B00659257-S4Open ↗
09/01/2026B00659257-S5Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/06/2022322158687Open ↗
06/19/2020321726254Open ↗
01/26/2018321726254Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/26/2018321726254Open ↗
09/07/2012320511371Open ↗
08/31/2012320511380Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/07/2012320511371Open ↗
08/31/2012320511380Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/26/2018321726254Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING4
03/15/2013320420255Open ↗
12/28/2012320353292Open ↗
01/23/2012320353292Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/17/2019321726254Open ↗
01/26/2018321726254Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
01/21/2026320353292Open ↗
▸BISSPRINKLER SYSTEMS1
09/08/2020321726254Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B01192465-I1Open ↗
08/13/2026B01192465-P1Open ↗
▸BISSTREET TREE CHECKLIST1
08/06/2022322158687Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/29/2026B00659257-P8Open ↗
08/29/2026B00659257-P7Open ↗
08/29/2026B00659257-P6Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
04/12/2012320420255Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis3
08/29/2026B00659257-I1Open ↗
08/29/2026B00659257-S3Open ↗
08/15/2026B00659257-S5Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/06/2022322158687Open ↗
12/28/2012320353292Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/14/2026320353292Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/29/2012320353292Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/18/2025320353292Open ↗
09/26/2025320511371Open ↗
09/26/2025320353292Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
09/29/2025320353292Open ↗
09/29/2025320511371Open ↗
▸DOB NOWSOIL REPORT2
08/29/2026B00659257-P8Open ↗
08/14/2026B00659257-S1Open ↗
▸BISMASONRY1
01/14/2026320353292Open ↗
▸BISHYDRO FLOW TEST LETTER1
04/30/2012320420255Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
04/30/2012320420255Open ↗
▸DOB NOWTR4 Plot Diagram1
08/14/2026B00659257-S1Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE5
11/07/2024322158687Open ↗
10/30/2024322158687Open ↗
10/02/2024322158687Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/28/2012320353292Open ↗
12/28/2012320353292Open ↗
01/23/2012320353292Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/22/2026320353292Open ↗
10/01/2025320511371Open ↗
09/15/2025321726254Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF4
11/24/2025320353292Open ↗
09/11/2025321726254Open ↗
08/22/2025320511380Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
08/31/2012320511380Open ↗
08/31/2012320511371Open ↗
01/23/2012320353292Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
10/17/2024322158687Open ↗
01/23/2012320353292Open ↗
▸BISLANDMARKS APPROVAL2
02/10/2025322158687Open ↗
01/23/2012320353292Open ↗
▸BISFINAL1
12/18/2025320353292Open ↗
▸BISDOB - CONSTRUCTION CODE DETERMINATION (CCD1)1
09/12/2024322158687Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT7
08/06/2022322158687Open ↗
01/26/2018321726254Open ↗
01/26/2018321726254Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/09/2025320353292Open ↗
09/09/2025321726254Open ↗
09/09/2025321726254Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION9
12/08/2025320353292Open ↗
11/06/2025320353292Open ↗
08/06/2022322158687Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET8
08/06/2022322158687Open ↗
01/26/2018321726254Open ↗
08/31/2012320511380Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM1
06/19/2020321726254Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/10/2019321726254Open ↗
01/10/2019321726254Open ↗
01/10/2019321726254Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026B01192465-P1Open ↗
08/21/2026B01192465-I1Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026B01192465-I1Open ↗
08/13/2026B01192465-P1Open ↗