| Owner | Filings | Most Recent |
|---|---|---|
| BRUKLYN BUILDERS | 41 | 07/08/2026 |
| OWNERS REP | 4 | 03/22/2026 |
| MASTER FIRE PREVENTION SYSTEMS | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| VALJATO ENGINEERING PC | 1 | 01/22/2026 |
| SOUTH BAY ENGINEERING PLLC | 3 | 07/28/2025 |
| PAUL PERDEK, PROF. ENG. PLLC | 2 | 07/02/2025 |
| ELEVATED ENGINEERING NYC | 3 | 06/25/2025 |
| ADVANCED ENGINEERING & INSPECT. PLL | 4 | 05/26/2025 |
| NA | 3 | 05/19/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| EXPEDITING 4 U | 10 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| VALJATO ENGINEERING P C | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| BRUKLYN BUILDERS INC | General Contractor | 3 | 07/08/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 3 | 03/21/2026 |
| APRILAKIS, EVANGELINA | Electrical | 2 | 03/21/2026 |
| BROWN, JERMAINE | Electrical | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| VALJATO ENGINEERING PC | 2486 | 1 | 01/22/2026 |
| SOUTH BAY ENGINEERING PLL | 6682 | 2 | 07/28/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | BRUKLYN BUILDERS INC | 04/27/2026 |
| DOB NOW | Full Demolition | Signed-off | BRUKLYN BUILDERS INC | 06/05/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 05/22/2025 |
| DOB NOW | Construction Fence | Permit Issued | BRUKLYN BUILDERS INC | 05/01/2025 |
| BIS | — | ISSUED | PAUL SIGNS INC | 12/28/2016 |
| BIS | — | ISSUED | BORIS MALIK | 10/06/2015 |
| BIS | — | ISSUED | BORIS MALIK | 10/07/2014 |
| BIS | — | ISSUED | BORIS MALIK | 09/05/2014 |
| BIS | FP | ISSUED | MASTER FIRE SYSTEMS, INC | 11/01/2012 |
| BIS | — | ISSUED | BORIS MALIK | 10/05/2012 |
| BIS | PL | ISSUED | A. M. PLUMBING COMPANY | 04/18/2012 |
| BIS | — | ISSUED | BORIS MALIK | 04/12/2012 |
| BIS | OT | ISSUED | BORIS MALIK | 11/15/2011 |
| BIS | MH | ISSUED | CGS BIULDERS INC. | 04/04/2008 |
| BIS | PL | ISSUED | ENYQ CORP | 03/28/2008 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/25/2025 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric SUZ-KA24NA2.TH 24,000 BTU · Condensing Unit ×18 MXZ-SM36NAM2-U1 36,000 BTU · Condensing Unit ×12 MXZ-SM48NAM2-U1 48,000 BTU · Condensing Unit ×12 SUZ-KA36NA2.TH 33,000 BTU · Condensing Unit ×11 MXZ-SM120TAM-U1 114,000 BTU · Condensing Unit ×5 SUZ-KA30NA2.TH 27,000 BTU · Condensing Unit ×5 MUZ-GS12NA 12,000 BTU · Condensing Unit ×1 MXZ-SM96TAM-U1 92,000 BTU · Condensing Unit ×1 Heating Mitsubishi Electric SUZ-KA24NA2.TH 25,000 BTU · Condensing Unit ×18 MXZ-SM36NAM2-U1 41,000 BTU · Condensing Unit ×12 MXZ-SM48NAM2-U1 50,000 BTU · Condensing Unit ×12 SUZ-KA36NA2.TH 33,400 BTU · Condensing Unit ×11 MXZ-SM120TAM-U1 129,000 BTU · Condensing Unit ×5 SUZ-KA30NA2.TH 30,000 BTU · Condensing Unit ×5 MUZ-GS12NA 14,400 BTU · Condensing Unit ×1 MXZ-SM96TAM-U1 103,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2025 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2025 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/09/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | General Wiring |
| 12/09/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | 1 meters, 1 new_meters |
| 06/25/2025 | Complete | SOLAS ELECTRICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2025 | — | — | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/12/2025 | Permit Issued | BRUKLYN BUILDERS INC | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 01/21/2026 | Structural Stability – Alterations of existing buildings | Steve Valjato | special |
| 09/17/2025 | Structural Stability – Alterations of existing Buildings | Chris Sanders | special |
| 07/25/2025 | Structural Stability – Alterations of existing Buildings | Chris Sanders | special |
| 06/25/2025 | Underpinning and alternate methods of support of buildings and adjacent property | — | special |
| 06/09/2025 | Subgrade Inspections | — | special |
| 06/09/2025 | Structural Steel - Welding | — | special |
| 06/09/2025 | Structural Steel - Details | — | special |
| 06/09/2025 | Post-installed Anchors | — | special |
| 06/09/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/09/2025 | Construction Operations Influencing Adjacent Structures | — | special |
| 06/09/2025 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 05/15/2025 | Standpipe Systems | — | special |
| 05/15/2025 | Construction Operations Influencing Adjacent Structures | — | special |
| 05/15/2025 | Post-installed Anchors | — | special |
| 05/15/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 05/15/2025 | Post-installed Anchors | — | special |
| 05/15/2025 | Seismic Isolation Systems | — | special |
| 05/15/2025 | Sprinkler Systems | — | special |
| 05/15/2025 | Concrete - Cast-In-Place | — | special |
| 05/15/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 05/15/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 05/15/2025 | Energy Code Compliance Inspections | — | progress |
| 05/15/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/15/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/15/2025 | HVAC-R and service water heating equipment | — | energy_progress |