← Back
Over six families without stores
Markham Gardens
60 NORTH BURGHER AVENUE · West New Brighton-Silver Lake-Grymes Hill · BIN 5132994
💬 Discuss this project
2007Year Built
3Stories
C1Building Class
R3-2Zoning
236,523 sfGross Floor Area
240Units
Rent Stabilized82 Open Violations 81 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: MARKHAM GARDENS L.P. · 411,694 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof12p · 5 filings · 20 docs
Floor 34p · 1 filing · 3 docs
Floor 27p · 2 filings · 9 docs
Floor 112p · 4 filings · 19 docs
Cellar2p · 1 filing · 6 docs
Sub-Cellar3p · 1 filing · 6 docs
Site & exterior7p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL EMPIRE BUILDING CONTRACTORS1207/08/2026
TOPLINE NYC CONTRACTING707/08/2026
MARKHAM GARDENS LP503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.409/24/2024
AZIMUTH ENGINEERING302/25/2021
SYED ENGINEERING, P.C.204/10/2020
ASHRAF CORP211/15/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.303/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
SHEIKH EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL EMPIRE BUILDING CONGeneral Contractor1007/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor607/08/2026
OVERLAND CONTRACTING INCGeneral Contractor407/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor407/08/2026
ELMAC ELECTRIC INC.Electrical103/22/2026
CAM ENERGY HTG&MECH CORPPlumbing107/08/2026
HYDRO MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808209/04/2024
JEREMY K MCKEON, P.E.7263202/25/2021
Building Lifecycle
All (51)Filed (11)Permit Issued (14)Signed Off (8)Violation (3)Inspection (2)Objection (4)Special Inspection (9)
11/06/2024
Signed off — Alteration
REPLACE GAS-FIRED BOILER WITH GAS-FIRED HOT WATER HEATER AS PER PLANS. CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01094113-I1
10/24/2024
Signed off — Alteration
S01094105-I1
10/24/2024
Signed off — Alteration
S01094120-I1
10/01/2024
Permit issued — Mechanical Systems
S01094105-I1-MS
09/30/2024
Permit issued — Mechanical Systems
S01094120-I1-MS
09/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2024
Filed — Alteration
REPLACE GAS-FIRED BOILER WITH GAS-FIRED HOT WATER HEATER AS PER PLANS. CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01094113-P1
09/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/04/2024
Filed — Alteration
S01094120-I1
09/03/2024
Permit issued — Plumbing
S01094113-I1-PL
08/29/2024
Filed — Alteration
REPLACE GAS-FIRED BOILER WITH GAS-FIRED HOT WATER HEATER AS PER PLANS. CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01094113-I1
08/29/2024
Filed — Alteration
S01094105-I1
08/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
08/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
08/09/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
08/09/2024
Special inspection requirement — Final
Joseph Bazini
08/09/2024
Special inspection requirement — Final
Joseph Bazini
08/09/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
07/29/2022
Signed off — Alteration
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. No change to occupancy, use, or egress.
S00456146-I1
07/29/2022
Signed off — Alteration
AT&T - Relocation and removal of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
S00456179-I1
07/29/2022
Signed off — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use or egress.
S00456164-I1
05/19/2021
Permit issued — Antenna
S00456179-I1-AN
04/26/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
S00333636-I1
04/26/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00333641-I1
04/06/2021
Permit issued — Plumbing
S00456164-I1-PL
04/02/2021
Permit issued — Mechanical Systems
S00456146-I1-MS
02/26/2021
Objection raised — 2014-AN AC 28-103.14.1-Adminis
02/26/2021
Objection resolved — Addressed
02/26/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
02/26/2021
Objection resolved — Addressed
02/25/2021
Filed — Alteration
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. No change to occupancy, use, or egress.
S00456146-I1
02/25/2021
Filed — Alteration
AT&T - Relocation and removal of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
S00456179-I1
02/25/2021
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use or egress.
S00456164-I1
01/18/2021
Special inspection requirement — Mechanical Systems
Jeremy McKeon
01/18/2021
Special inspection requirement — Final
Jeremy McKeon
05/05/2020
Permit issued — Supported Scaffold
S00333641-I1-SF
05/05/2020
Permit issued — Sidewalk Shed
S00333636-I1-SH
04/10/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
S00333636-I1
04/10/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00333641-I1
04/10/2020
Permit issued — Supported Scaffold
S00333641-I1-SF
04/10/2020
Permit issued — Sidewalk Shed
S00333636-I1-SH
03/17/2020
Special inspection requirement — Final
RAFI HAMID
05/28/2019
Permit issued — Supported Scaffold
S00089498-I1-SF
05/28/2019
Permit issued — Sidewalk Shed
S00089497-I1-SH
11/16/2018
Permit issued — Supported Scaffold
S00089498-I1-SF
11/15/2018
Filed — Alteration
S00089498-I1
11/15/2018
Permit issued — Sidewalk Shed
S00089497-I1-SH
11/14/2018
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
S00089497-I1
02/07/2012
Violation issued (ECB, closed)
Plumbing
02/02/2012
Violation issued (ECB, closed)
Construction
02/26/2009
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME10/01/2024
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME09/30/2024
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP09/03/2024
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC05/19/2021
DOB NOWPlumbingSigned-offHYDRO MECHANICAL INC04/06/2021
DOB NOWMechanical SystemsSigned-offOVERLAND CONTRACTING INC04/02/2021
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING05/05/2020
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/05/2020
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING04/10/2020
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING04/10/2020
DOB NOWSupported ScaffoldPermit IssuedALL EMPIRE BUILDING CON05/28/2019
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON05/28/2019
DOB NOWSupported ScaffoldPermit IssuedALL EMPIRE BUILDING CON11/16/2018
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON11/15/2018
BISEQISSUEDINTERSYSTEM INSTALLATION01/14/2021
BISOTISSUEDDIGITAL CONSTRUCTION TECH04/20/2020
BISEQISSUEDINTERSYSTEM INSTALLATION01/15/2020
BISOTISSUEDDIGITAL CONSTRUCTION TECH12/06/2018
BISEQISSUEDINTERSYSTEM S&S CORP11/29/2018
BISOTISSUEDEASTERN ALLIANCE LLC05/15/2018
BISEQISSUEDINTERSYSTEM S&S CORP11/17/2017
BISOTISSUEDEASTERN ALLIANCE LLC07/21/2017
BISEQISSUEDINTERSYSTEM S&S CORP11/07/2016
BISOTISSUEDADVANCED CELLULAR SOLUTIO07/29/2016
2 projects · most recent 10/04/2021
General Wiring
FiledStatusContractorScope
10/04/2021CompleteELMAC ELECTRIC INC.General Wiring
03/17/2020Permit IssuedRICHARD NEU—
3 projects · most recent 04/10/2020
Sidewalk Shed Scaffold
FiledStatusContractorScope
04/10/2020Signed-offTOPLINE NYC CONTRACTINGSidewalk Shed
04/10/2020Signed-offTOPLINE NYC CONTRACTINGScaffold
11/14/2018Permit IssuedALL EMPIRE BUILDING CONSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/15/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
08/15/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
08/09/2024Mechanical SystemsJoseph Bazinispecial
08/09/2024FinalJoseph Baziniprogress
08/09/2024FinalJoseph Baziniprogress
08/09/2024Mechanical SystemsJoseph Bazinispecial
01/18/2021Mechanical SystemsJeremy McKeonspecial
01/18/2021FinalJeremy McKeonprogress
03/17/2020FinalRAFI HAMIDprogress
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch6
08/26/2026S00089497-I1Request digital key ↗
08/26/2026S00089498-I1Request digital key ↗
08/21/2026S01094105-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026S00456164-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026S00333641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026S00456179-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026S00456146-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026S00333636-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION8
01/15/2020540116514Open ↗
12/07/2018520228012Open ↗
11/30/2018540116514Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/05/2018520228012Open ↗
11/03/2016540116514Open ↗
05/27/2016520228012Open ↗
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
06/03/2020520228012Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026S00456146-I1Open ↗
08/21/2026S01094105-I1Open ↗
08/20/2026S01094113-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026S01094105-I1Open ↗
09/23/2026S01094105-I1Open ↗
08/31/2026S00333636-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026S01094105-I1Open ↗
08/27/2026S00456146-I1Open ↗
08/24/2026S01094120-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/03/2016540116514Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/03/2016540116514Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/27/2016520228012Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/03/2016540116514Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
07/29/2016520228012Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026S00456179-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026S00333641-I1Open ↗
08/13/2026S00333636-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026S00456146-I1Open ↗
08/13/2026S00456179-I1Open ↗
08/13/2026S00456164-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/27/2016520228012Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/27/2016520228012Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/10/2021520228012Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/03/2016540116514Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/10/2021520228012Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/15/2022540116514Open ↗
12/15/2022540116514Open ↗
05/10/2021520228012Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/03/2020520228012Open ↗
01/15/2020540116514Open ↗
01/15/2020540116514Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/20/2026S01094113-P1Open ↗
08/20/2026S01094113-I1Open ↗
08/13/2026S01094105-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
12/07/2018520228012Open ↗
07/31/2017520228012Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/16/2022540116514Open ↗
05/10/2021520228012Open ↗
▸BISFINAL1
12/15/2022540116514Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/27/2016520228012Open ↗
▸BISSHED LETTER1
11/30/2018540116514Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/10/2021520228012Open ↗
06/05/2018520228012Open ↗
05/27/2016520228012Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
06/03/2020520228012Open ↗
06/05/2018520228012Open ↗
▸BISADDITIONAL INFORMATION2
06/28/2018520228012Open ↗
06/05/2018520228012Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/03/2016540116514Open ↗
▸BISEFILING COVER SHEET1
05/27/2016520228012Open ↗
▸Other Documents1
▸BISSupporting Document: Fee Exempt1
01/15/2020540116514Open ↗