Big box retail (e.g., Costco, BJs)
2900 VETERANS ROAD WEST
STATEN ISLAND · BIN 5170016
💬 Discuss this project
2005Year Built
1Stories
K8Building Class
M1-1Zoning
144,760 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Big box retail (e.g., Costco, BJs) · Owner of record: CHARLESTON T, LLC · 527,174 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalOther
Roof4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TARGET5207/08/2026
CHARLESTON T, LLC903/22/2026
EMC103/22/2026
PLAZA CONSTRUCTION103/21/2026
CHARLSTON ENTERPRISES LLC BY BD803/21/2026
CHARLESTONE ENTERPRISES503/21/2026
CHARLESTON T LLC C O BLUMENFELD1103/21/2026
TARGET T2006403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHEAL ANDERSON201/28/2026
HARRISON FRENCH & ASSOCIATES311/01/2022
NA212/26/2019
LEON SKVIRSKY PE603/18/2019
HC ARCHITECT, PC203/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
BUILDING BROTHERS1203/21/2026
JP EXPEDITE403/21/2026
J A EXPEDITING403/21/2026
JAM CONSULTANTS, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ULTIMATE SIGNS DESIGNSScaffold407/08/2026
MACCARONE PLUMBING INCPlumbing307/08/2026
AMPERE ELECL SERVICES CORElectrical203/22/2026
FOOS FIRE NYPlumbing203/22/2026
CAD SIGNS NYCScaffold207/08/2026
NATIONAL MAINTENANCEScaffold207/08/2026
DANSON HEIGHTS SERVICE COGeneral Contractor107/08/2026
RJB CONTRACTING INCGeneral Contractor107/08/2026
CORP. ELEC'L TECHNOLOGIESElectrical103/22/2026
JAMES GIORGIO, JRElectrical103/21/2026
MICHAEL CABRERAElectrical103/21/2026
ULTIMATE SIGNS & ELEC CORElectrical103/22/2026
B.R. FRIES & ASSOCIATES LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HORIZON ENGINEERING ASSOC4472212/26/2019
Building Lifecycle
All (110)Filed (15)Permit Issued (12)Signed Off (12)Violation (21)Inspection (4)Objection (16)Special Inspection (30)
03/23/2026
Objection resolved — Resolved
03/23/2026
Objection resolved — Resolved
03/23/2026
Objection resolved — Resolved
03/23/2026
Objection resolved — Resolved
03/23/2026
Objection resolved — Resolved
03/23/2026
Objection resolved — Resolved
02/09/2026
Objection raised — Zoning
02/09/2026
Objection raised — Plumbing
02/09/2026
Objection raised — Scope
02/09/2026
Objection raised — Cost
02/09/2026
Objection raised — Fire_Protection
02/09/2026
Objection raised — Admin
02/09/2026
Objection raised — Structural
02/09/2026
Objection raised — Cost
01/28/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE LIKE FOR LIKE REPLACEMENT OF (15) EXISTING ROOF TOP UNITS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S01338732-S1
01/28/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE LIKE FOR LIKE REPLACEMENT OF (15) EXISTING ROOF TOP UNITS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
S01338732-I1
12/22/2025
Special inspection requirement — Final
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
12/22/2025
Special inspection requirement — Shutoff dampers
12/22/2025
Special inspection requirement — Maintenance information
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/22/2025
Special inspection requirement — Mechanical Systems
12/22/2025
Special inspection requirement — Electrical motors and elevators
12/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
08/08/2023
Signed off — Alteration
Architectural work is limited to minor demolition and repair/replacement of finishes. No change in use, occupancy or egress.
S08021310-I1
08/08/2023
Signed off — Alteration
Architectural work is limited to minor demolition and repair/replacement of finishes. No change in use, occupancy or egress.
S08021366-I1
06/20/2023
Signed off — Alteration
MINOR RENOVATION OF EXISTING RETAIL SPACE. NO CHANGE IN USE, OCCUPANY, OR EGRESS.
S00597531-I1
04/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/17/2023
Permit issued — General Construction
S08021310-I1-GC
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2022
Permit issued — Plumbing
S08021366-I1-PL
11/01/2022
Filed — Alteration
Architectural work is limited to minor demolition and repair/replacement of finishes. No change in use, occupancy or egress.
S08021310-I1
11/01/2022
Filed — Alteration
Architectural work is limited to minor demolition and repair/replacement of finishes. No change in use, occupancy or egress.
S08021366-I1
10/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
BOGUE EBBRECHT
10/20/2022
Special inspection requirement — Energy Code Compliance Inspections
BOGUE EBBRECHT
10/14/2022
Special inspection requirement — Final
BOGUE EBBRECHT
10/07/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/30/2022
Permit issued — General Construction
S00597531-I1-GC
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
BOGUE EBBRECHT
10/25/2021
Objection raised — Scope
10/25/2021
Objection resolved — Addressed
09/30/2021
Filed — Alteration
MINOR RENOVATION OF EXISTING RETAIL SPACE. NO CHANGE IN USE, OCCUPANY, OR EGRESS.
S00597531-I1
09/21/2021
Special inspection requirement — Final
BOGUE EBBRECHT
10/29/2020
Signed off — Alteration
REPLACEMENT OF EXISTING HEATING AND COOLING EQUIPMENT, MECHANICAL HVAC DUCTWORK. REPLACE 1 EXISTING ROOFTOP UNIT.
S00231137-I1
02/14/2020
Permit issued — Mechanical Systems
S00231137-I1-MS
12/26/2019
Filed — Alteration
REPLACEMENT OF EXISTING HEATING AND COOLING EQUIPMENT, MECHANICAL HVAC DUCTWORK. REPLACE 1 EXISTING ROOFTOP UNIT.
S00231137-P1
12/26/2019
Special inspection requirement — HVAC and service water heating equipment
DANIEL FORINO
12/26/2019
Special inspection requirement — Mechanical Systems
DANIEL FORINO
12/26/2019
Special inspection requirement — Final
DANIEL FORINO
12/26/2019
Special inspection requirement — Maintenance information
DANIEL FORINO
12/26/2019
Special inspection requirement — HVAC and service water heating system controls
DANIEL FORINO
12/26/2019
Special inspection requirement — HVAC insulation and sealing
DANIEL FORINO
12/26/2019
Special inspection requirement — Shutoff dampers
DANIEL FORINO
12/24/2019
Special inspection requirement — Final
DANIEL FORINO
12/24/2019
Special inspection requirement — Mechanical Systems
DANIEL FORINO
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offB.R. FRIES & ASSOCIATES L01/17/2023
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC11/17/2022
DOB NOWGeneral ConstructionSigned-offRJB CONTRACTING INC08/30/2022
DOB NOWMechanical SystemsSigned-offDANSON HEIGHTS SERVICE CO02/14/2020
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO03/22/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO03/22/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO03/22/2019
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC03/22/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO03/22/2019
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC03/22/2019
DOB NOWSignSigned-offCAD SIGNS NYC CORP03/23/2018
DOB NOWSignSigned-offCAD SIGNS NYC CORP03/23/2018
BISSPISSUEDDGM INDUSTRIES INC05/09/2019
BISPLISSUEDPAR PLUMBING CO., INC03/20/2019
BISOTISSUEDTHE WHITING-TURNER CONTRA01/10/2019
BISOTISSUEDTHE WHITING-TURNER CONTRA01/10/2019
BISOTISSUEDTHE WHITING-TURNER CONTRA01/10/2019
BISMHISSUEDTHE WHITING-TURNER CONTRA01/10/2019
BISOTISSUEDGROOM CONSTRUCTION CO.INC06/04/2018
BISPLISSUEDPAR PLUMBING CO., INC10/13/2017
BISMHISSUEDTHE WHITING-TURNER CONTRA08/08/2017
BISOTISSUEDTHE WHITING-TURNER CONTRA08/08/2017
BISOTISSUEDNEW GENERATION ENERGY & E10/31/2016
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO08/01/2016
BISOTISSUEDC.H SCHWERTNER & SON INC09/04/2015
BISPLISSUEDPAR PLUMBING CO., INC05/23/2012
BISSPISSUEDA & F FIRE PROTECTION CO08/11/2011
BISPLISSUEDPAR PLUMBING CO., INC05/09/2011
BISOTISSUEDPLAZA CONSTRUCTION CORP04/15/2011
BISOTISSUEDPLAZA CONSTRUCTION CORP04/15/2011
BISMHISSUEDPLAZA CONSTRUCTION CORP04/15/2011
BISOTISSUEDPLAZA CONSTRUCTION CORP01/13/2011
BISMHISSUEDPLAZA CONSTRUCTION CORP01/13/2011
BISOTISSUEDPLAZA CONSTRUCTION CORP01/13/2011
BISOTISSUEDSCHIMENTI CONSTRUCTION CO03/26/2010
BISOTISSUEDSCHIMENTI CONSTRUCTION CO03/26/2010
BISMHISSUEDSCHIMENTI CONSTRUCTION CO03/26/2010
BISMHISSUEDE.W. HOWELL CO, LLC04/12/2007
BISPLISSUEDMETRO MECHANICAL GROUP IN03/06/2006
BISFPISSUEDRELIABLE FIRE PROTECTION02/24/2006
+ 10 more permits on file
1 project · most recent 01/28/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2026——Heating and Air Conditioning Systems
Heat / Cool
Carrier 48FEDM16 15 tons · Rooftop Unit ×6
48FEDM14 13 tons · Rooftop Unit ×2
48FEDB06 5 tons · Rooftop Unit ×1
48FEDM20 18 tons · Rooftop Unit ×1
48FEDN16 15 tons · Rooftop Unit ×1
48FEEM16 15 tons · Rooftop Unit ×1
48FEEN07 6 tons · Rooftop Unit ×1
48FEEN16 15 tons · Rooftop Unit ×1
48FEFN24 20 tons · Rooftop Unit ×1
1 project · most recent 01/28/2026
Gas
FiledStatusContractorScope
01/28/2026——Gas
14 projects · most recent 03/01/2023
General Wiring
FiledStatusContractorScope
03/01/2023CompleteJSP ELECTL CNTNG CORPGeneral Wiring
05/27/2021Permit IssuedSOLO ENERGY & ELECTRICALGeneral Wiring
09/16/2019Permit IssuedCORP. ELEC'L TECHNOLOGIESGeneral Wiring
04/16/2019CompleteULTIMATE SIGNS & ELEC COR—
04/16/2019CompleteULTIMATE SIGNS & ELEC COR—
04/16/2019CompleteULTIMATE SIGNS & ELEC COR—
04/16/2019CompleteULTIMATE SIGNS & ELEC COR—
04/16/2019CompleteULTIMATE SIGNS & ELEC COR—
04/16/2019CompleteULTIMATE SIGNS & ELEC COR—
01/07/2019Permit IssuedK & R ELECTRIC CO., INC.General Wiring
09/28/2018Permit IssuedAMPERE ELECL SERVICES COR—
09/27/2018Permit IssuedAMPERE ELECL SERVICES COR—
09/27/2018Permit IssuedAMPERE ELECL SERVICES COR—
05/12/2018Permit IssuedAMPERE ELECL SERVICES COR—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/22/2025Final—progress
12/22/2025Energy Code Compliance Inspections—progress
12/22/2025Shutoff dampers—energy_progress
12/22/2025Maintenance information—energy_progress
12/22/2025HVAC-R and service water piping design and insulation—energy_progress
12/22/2025HVAC-R and service water heating equipment—energy_progress
12/22/2025Mechanical Systems—special
12/22/2025Electrical motors and elevators—energy_progress
12/22/2025Duct leakage testing, insulation and design—energy_progress
12/22/2025HVAC-R and service water heating system controls—energy_progress
10/20/2022Fire-Resistance Rated ConstructionBOGUE EBBRECHTprogress
10/20/2022Energy Code Compliance InspectionsBOGUE EBBRECHTprogress
10/14/2022FinalBOGUE EBBRECHTprogress
11/09/2021Fire-Resistance Rated ConstructionBOGUE EBBRECHTprogress
09/21/2021FinalBOGUE EBBRECHTprogress
12/26/2019HVAC and service water heating equipment DANIEL FORINOenergy_progress
12/26/2019Mechanical SystemsDANIEL FORINOspecial
12/26/2019FinalDANIEL FORINOprogress
12/26/2019Maintenance informationDANIEL FORINOenergy_progress
12/26/2019HVAC and service water heating system controls DANIEL FORINOenergy_progress
12/26/2019HVAC insulation and sealing DANIEL FORINOenergy_progress
12/26/2019Shutoff dampersDANIEL FORINOenergy_progress
12/24/2019FinalDANIEL FORINOprogress
12/24/2019Mechanical SystemsDANIEL FORINOspecial
12/24/2019Shutoff dampersDANIEL FORINOenergy_progress
Latest 25 of 34.
▾Documents — 302 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch7
08/26/2026S00024884-I1Request digital key ↗
08/26/2026S00024898-I1Request digital key ↗
08/23/2026S08021366-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sign6
08/26/2026S00133284-I1Request digital key ↗
08/26/2026S00133282-I1Request digital key ↗
08/26/2026S00133285-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026S00231137-I1Request digital key ↗
08/15/2026S00231137-P1Request digital key ↗
▸Applications & Permits59
▸BISWORK PERMIT APPLICATION24
05/10/2019520294066Open ↗
03/20/2019520294048Open ↗
01/16/2019520294048Open ↗
Showing 3 of 24 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION24
09/30/2019520294048Open ↗
09/24/2019520294048Open ↗
07/29/2019520294048Open ↗
Showing 3 of 24 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION11
07/11/2011520054832Open ↗
07/05/2011520054832Open ↗
06/27/2011520054832Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications106
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
12/17/2019520294048Open ↗
12/17/2019520294048Open ↗
12/17/2019520294048Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026S00597531-I1Open ↗
09/01/2026S00231137-I1Open ↗
09/01/2026S00231137-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026S00024884-I1Open ↗
08/26/2026S00024898-I1Open ↗
08/26/2026S00133284-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
09/30/2019520294048Open ↗
05/02/2019520294066Open ↗
11/20/2018520294048Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
05/02/2019520294066Open ↗
11/20/2018520294048Open ↗
11/20/2018520294048Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00231137-I1Open ↗
08/26/2026S00231137-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/21/2016540115016Open ↗
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE10
09/12/2012520067917Open ↗
06/28/2012520067917Open ↗
05/25/2012520054832Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
05/02/2019520294066Open ↗
11/20/2018520294048Open ↗
07/13/2017520307338Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
09/28/2012520054832Open ↗
06/08/2011520067917Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
09/14/2012520067917Open ↗
05/03/2012520067917Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
10/21/2016540115016Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
12/17/2019520294048Open ↗
12/17/2019520294048Open ↗
12/17/2019520294048Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/17/2019520294048Open ↗
08/30/2018520222688Open ↗
03/29/2018540115016Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/29/2018540115016Open ↗
10/21/2016540115016Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/29/2018540115016Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/28/2016540115016Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00231137-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/29/2018540115016Open ↗
10/28/2016540115016Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/20/2011520067917Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
12/27/2019520294048Open ↗
12/17/2019520294048Open ↗
09/13/2018520222688Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
05/02/2019520294066Open ↗
11/20/2018520294048Open ↗
06/06/2018520222688Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/17/2019520294048Open ↗
08/30/2018520222688Open ↗
10/28/2016540115016Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/29/2018540115016Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT24
12/17/2019520294048Open ↗
05/02/2019520294066Open ↗
11/20/2018520294048Open ↗
Showing 3 of 24 on file for this type
▸Filing & Intake Forms21
▸BISEFILING COVER SHEET12
05/02/2019520294066Open ↗
11/20/2018520294048Open ↗
11/20/2018520294048Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM6
12/17/2019520294048Open ↗
09/30/2019520294048Open ↗
07/29/2019520294048Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
01/16/2019520294048Open ↗
10/28/2016540115016Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/21/2016540115016Open ↗