← Back
Two family converted from one family
60 WELDON STREET
BROOKLYN · East New York-City Line · BIN 3093337
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R5Zoning
1,247 sfGross Floor Area
2Units
Two family converted from one family · 1,817 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 210p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar13p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2021$565K—Private party → Private party$453/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK411/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGID PLUMBING CONT INCPlumbing407/08/2026
CITY BUILDING CONSULTANTSGeneral Contractor303/21/2026
EUSEBIO MCQUEENElectrical203/21/2026
RM ELECTRIC CO., INC.Electrical103/22/2026
PASQUALE QUARATINO INCGeneral Contractor103/21/2026
Building Lifecycle
All (33)Filed (4)Permit Issued (3)Inspection (5)Objection (14)Special Inspection (7)
06/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/27/2024
Filed — Alteration
-PROPOSE THANKLESS WATER HEATER IN CELLAR FLOOR -PROPOSE THREE PIECES BATHROOM IN CELLAR FLOOR ( SHOWER, LAVATORY AND TOILET) -PROPOSE AREA DRAIN IN CELLAR FLOOR -PROPOSE THREE PIECES BATHROOM IN FIRST FLOOR ( BATH TUB, LAVATORY AND TOILET) -PROPOSE KITCH
B00491781-P2
11/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2024
Permit issued — Plumbing
B00491781-I1-PL
09/05/2024
Filed — Alteration
-PROPOSE THANKLESS WATER HEATER IN CELLAR FLOOR -PROPOSE THREE PIECES BATHROOM IN CELLAR FLOOR ( SHOWER, LAVATORY AND TOILET) -PROPOSE AREA DRAIN IN CELLAR FLOOR -PROPOSE THREE PIECES BATHROOM IN FIRST FLOOR ( BATH TUB, LAVATORY AND TOILET) -PROPOSE KITCH
B00491781-P1
03/25/2024
Filed — Alteration
-PROPOSE THANKLESS WATER HEATER IN CELLAR FLOOR -PROPOSE THREE PIECES BATHROOM IN CELLAR FLOOR ( SHOWER, LAVATORY AND TOILET) -PROPOSE AREA DRAIN IN CELLAR FLOOR -PROPOSE THREE PIECES BATHROOM IN FIRST FLOOR ( BATH TUB, LAVATORY AND TOILET) -PROPOSE KITCH
B00491781-I1
09/14/2023
Permit issued — General Construction
B00477735-I1-GC
05/02/2023
Permit issued — General Construction
B00477735-I1-GC
05/01/2021
Objection raised — Other
05/01/2021
Objection resolved — Addressed
04/20/2021
Objection raised — Other
04/20/2021
Objection resolved — Addressed
04/20/2021
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Inspections
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Fire_Protection
04/16/2021
Objection resolved — Addressed
04/16/2021
Objection raised — Other
04/16/2021
Objection resolved — Addressed
04/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/16/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/16/2021
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/16/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/16/2021
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/08/2021
Filed — Alteration CO
Application file to convert from one two family family.
B00477735-I1
04/07/2021
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRIGID PLUMBING CONT INC09/25/2024
DOB NOWGeneral ConstructionPermit IssuedPR09/14/2023
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDING CONSULTANTS05/02/2023
BISOTISSUED1ST LIGHT ENERGY INC04/21/2017
1 project · most recent 11/27/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/27/2024Permit IssuedRIGID PLUMBING CONT INCGas, Water/Sanitary
3 projects · most recent 03/04/2024
General Wiring
FiledStatusContractorScope
03/04/2024Permit IssuedRM ELECTRIC CO., INC.General Wiring
03/04/2024Permit IssuedRM ELECTRIC CO., INC.3 meters, 3 new_meters
01/25/2021CompleteSAFEWAY CONSTRUCTION, INC1 meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/20/2021Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/16/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/16/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/16/2021Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/16/2021Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/16/2021Fenestration air leakageYounes Abouyaalaenergy_progress
04/07/2021Insulation placement and R valuesYounes Abouyaalaenergy_progress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B00491781-I1Request digital key ↗
08/23/2026B00491781-P2Request digital key ↗
08/23/2026B00491781-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/22/2017340473507Open ↗
▸BISWORK PERMIT APPLICATION1
04/21/2017340473507Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B00477735-I1Open ↗
08/13/2026B00491781-P2Open ↗
08/13/2026B00491781-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00477735-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B00491781-I1Open ↗
08/23/2026B00491781-P1Open ↗
08/23/2026B00491781-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B00477735-I1Open ↗
08/29/2026B00477735-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/22/2017340473507Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B00477735-I1Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes1
02/22/2017340473507Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00477735-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00477735-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00477735-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00477735-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B00491781-I1Open ↗
08/23/2026B00491781-P1Open ↗
08/23/2026B00491781-P2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/22/2017340473507Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/11/2020340473507Open ↗
02/22/2017340473507Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/11/2020340473507Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/27/2017340473507Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/15/2020340473507Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00477735-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/11/2020340473507Open ↗
02/22/2017340473507Open ↗
▸Approvals, Objections & Sign-offs3
▸BISFINAL ELECTRICAL SIGNOFF1
12/11/2020340473507Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/15/2020340473507Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/11/2020340473507Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/27/2017340473507Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/11/2020340473507Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
04/19/2017340473507Open ↗
04/11/2017340473507Open ↗
03/27/2017340473507Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/22/2017340473507Open ↗
▸Other Documents2
▸DOB NOWFinal Survey1
08/13/2026B00477735-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00477735-I1Open ↗