DOB02/22/2022FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
DOB09/08/2021FTM BLDG EXTERIOR WALLS/FACADE AND APPURTENANCES. AT TIME OF INSP VIEW AT EXP1 EAST ELEVATION CRACK LINTELS, DAMAGED STONE AT ENTRANCE CANOPY ABD SPALLING. EXP2 DAMAGED AT WINDOW LINTELS AND SPALLING EXP 4 DAMAGED LINTELS EXPOSIRE 3 DAMAGE LINTELS. REMEDY: REPAIR DEFECTIVE CONDITIONS
DOB08/26/2021AT TIME OF INSPECTION OBSERVED EXISTING STEEL WATER TOWER WITH CROSS BRACING HAS BEEN REMOVED APPROXIMATELY 25" DIAMETER X 20'LONG ALONG WITH CORROTIONAT ALL AREAS
DOB08/13/2021FAILURE TO COMPLY WITH COMMISSIONER'S ORDER AC 28-201.1. BUILDING OWNER-FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 092719CLL0101PR ISSUED ON 09/27/2019. AS OF 08/13/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDERS
DOB09/27/2019FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADES AND APPURTENANCES EXPOSURE 1. WEST ELEVATION: PARAPET WALL-SPALLED STONE REMEDY:MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES REPAIR,MAKE SAFE,PROVIDE ADEQUATE SAFETY MEAURES AS PER 1RCNY 103-04
DOB01/31/2013FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB06/25/1998V-DOB VIOLATION - ACTIVE
DOB06/12/1997V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB03/28/2025FAILURE TO SIGN OFF PERMITTED JOB AS REQUIRED BY DEPARTMENT OF BUILDING. AT TIME OF INSPECTION, JOBS #301889071 NOT SIGNED OFF. PERMITS #301889071-EW-MH EXPIRED ON 04/01/2007.; 28-116.4, COMPLY WITH CODENothing owed — awaiting certificate of correction
ECB12/16/2022FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#909610.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB05/19/2012FAILURE TO MAINTAIN BLDG WALLS, DEFECT NOTED AT EXP 1 MISSING BRICK & LOOSE BRICK AROUND GARAGE DOORS. 2 X 4 SECTION OF BRICK MISSING AT FLRS 3-7 THROUGHOUT EXP 1,2 AND 3, UPPER WINDOWS WERE BOARDED UP. MISSINGNothing owed — awaiting certificate of correction
ECB12/10/2010FAILURE TO MAINTAIN BLDG EXTERIOR WALL. DEFECT NOTED: AT EXP #4 WALL PORTION OF MASONRY WALLS BREAKING/BROKEN OFF FALLEN ONTO PUBLIC PLAYGROUND (AMERICAN PLAYGROUND) BROKEN & LOOSE MASONRY MATERIALS ATNothing owed — awaiting certificate of correction
ECB04/13/2005FAILURE TO MAINTAIN EXTERIOR BUILDING WALL:N/E DEFECT IS:WALL & FLOOR WINDOW OPENING ARE CRACKED BROKEN DEFECTIVE & OUT OF PLUMB AT VARIOUS LOCATIONS BY PARK PLAYGROUND AREA.REMEDY:SUBMIT ENGINEERS LETTER OF STNothing owed — awaiting certificate of correction
ECB04/11/2005FAILURE TO MAINTAIN EXTERIOR BUILDING WALL.NOTE:AT VARIOUS LOCATIONS,IT WAS OBSERVED THAT THE BRICKWORK HAS VERTICAL CRACKS AND THAT THE CONCRETE WORK AT THE ENTRANCE HAS BROKEN AWAY.SEVERAL BRICKS ARE ALSO MISNothing owed — awaiting certificate of correction
ECB11/18/2004FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECT IS: CONCRETE FACADESPALLING AT VARIOUS LOCATION BRICK WORK CRACKED AT SIDE OF BUILDING 1ST FLOOR DRIVEWAY ENTRANCE TO BUILDING.CONCRETE WORK BROKEN AND SECTIONNothing owed — awaiting certificate of correction
ECB12/18/1998WORK WITHOUT A PERMIT NOTED. SIDE WALK BRIGES THAT WERE ATTACHED TO SIDE WALK, AND ATTACHED TO BUILDING DIRECTLY ACROSS THE STREET TO PROVIDE ACCESS FOR TWO SEPARATE BRIDGE CROSSINGS HAS BEEN DEMOLISHED. ANothing owed — awaiting certificate of correction